{"id":14675,"date":"2013-08-30T22:24:33","date_gmt":"2013-08-30T19:24:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14675"},"modified":"2013-08-30T22:24:33","modified_gmt":"2013-08-30T19:24:33","slug":"lisanssiz-elektrik-yonetmeligi-kabul-edildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-elektrik-yonetmeligi-kabul-edildi\/","title":{"rendered":"(Turkish) Lisanss\u0131z Elektrik Y\u00f6netmeli\u011fi Kabul Edildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14675\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Sekt\u00f6r\u00fcn sab\u0131rs\u0131zl\u0131kla bekledi\u011fi Lisanss\u0131z Elektrik \u00dcretimi Y\u00f6netmeli\u011fi, Enerji Piyasas\u0131 D\u00fczenleme Kurulu`nun Per\u015fembe toplant\u0131s\u0131nda kabul edildi. \u00d6zellikle g\u00fcne\u015f ve r\u00fczgara dayal\u0131 lisanss\u0131z elektrik \u00fcretim yat\u0131r\u0131m\u0131 planlayanlar\u0131n d\u00f6rt g\u00f6zle bekledi\u011fi ve Kurul`un bir s\u00fcredir detayl\u0131ca g\u00f6r\u00fc\u015ft\u00fc\u011f\u00fc Lisanss\u0131z Elektrik \u00dcretimi Y\u00f6netmeli\u011fi`nin eli kula\u011f\u0131nda. EPDK`n\u0131n (Kurul) d\u00fcnk\u00fc toplant\u0131s\u0131nda Y\u00f6netmeli\u011fin kabul edildi\u011fi bildirildi.<\/strong><\/p>\n<p>EPDK Ba\u015fkan\u0131 Hasan K\u00f6kta\u015f, L\u00dcY`\u00fcn hafta ba\u015f\u0131nda resmi Gazete`ye g\u00f6nderilece\u011fini belirtti. K\u00f6kta\u015f &#8220;Lisanss\u0131z Elektrik \u00dcretimine ili\u015fkin Y\u00f6netmelik (L\u00dcY) Per\u015fembe g\u00fcn\u00fc Kurulda g\u00f6r\u00fc\u015f\u00fclerek karara ba\u011fland\u0131. Haftaba\u015f\u0131 R. Gazeteye g\u00f6nderilecek. Lisanss\u0131z Elektrik \u00dcretilmesine ili\u015fkin Uygulama Tebli\u011fi de Kurulda karara ba\u011fland\u0131&#8221; dedi.<\/p>\n<p><strong>L\u0130SANSSIZ ELEKTR\u0130K \u0130\u00c7\u0130N YEN\u0130 BA\u015eVURU KABUL ED\u0130LM\u0130YOR<\/strong><\/p>\n<p>Lisanss\u0131z Elektrik \u00dcretimi Y\u00f6netmeli\u011fi \u00e7\u0131km<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/lisanssiz-elektrik-yonetmeligi-kabul-edildi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-14676\" title=\"lisanssiz-elektrik-yonetmeligi-kabul-edildi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/lisanssiz-elektrik-yonetmeligi-kabul-edildi-300x209.jpg\" alt=\"\" width=\"300\" height=\"209\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/lisanssiz-elektrik-yonetmeligi-kabul-edildi-300x209.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/lisanssiz-elektrik-yonetmeligi-kabul-edildi-71x50.jpg 71w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/lisanssiz-elektrik-yonetmeligi-kabul-edildi.jpg 403w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ad\u0131\u011f\u0131 i\u00e7in lisanss\u0131z elektrik \u00fcretim yat\u0131r\u0131m\u0131 yapmak isteyenlerden yeni ba\u015fvuru kabul edilmiyor. Daha \u00f6nce yap\u0131lm\u0131\u015f ba\u015fvurularla ilgili olarak da baz\u0131 i\u015flemler s\u00fcrd\u00fcr\u00fcl\u00fcyor.<\/p>\n<p><strong>Y\u00d6NETMEL\u0130\u011e\u0130N KAPSAMI<\/strong><\/p>\n<p>May\u0131s ay\u0131nda haz\u0131rlanan Y\u00f6netmelik Tasla\u011f\u0131`n\u0131n kapsam\u0131 \u015f\u00f6yle;<\/p>\n<p>a) \u0130mdat gruplar\u0131 ve iletim ya da da\u011f\u0131t\u0131m sistemiyle ba\u011flant\u0131 tesis etmeden izole \u00e7al\u0131\u015fan \u00fcretim tesisini,<br \/>\nb) Kurulu g\u00fcc\u00fc azami bir megavatl\u0131k yenilenebilir enerji kaynaklar\u0131na dayal\u0131 \u00fcretim tesisini,<br \/>\nc) Mikro kojenerasyon tesisini,<br \/>\n\u00e7) Belediyelerin kat\u0131 at\u0131k tesisleri ile ar\u0131tma tesisi \u00e7amurlar\u0131n\u0131n bertaraf\u0131nda kullan\u0131lmak \u00fczere kurulan elektrik \u00fcretim tesisini,<br \/>\nd) Bakanl\u0131k\u00e7a belirlenecek verimlilik de\u011ferini sa\u011flayan kategorideki kojenerasyon tesislerini,<br \/>\ne) \u00dcretti\u011fi enerjinin tamam\u0131n\u0131 iletim veya da\u011f\u0131t\u0131m sistemine vermeden kullanan, \u00fcretimi ve t\u00fcketimi ayn\u0131 \u00f6l\u00e7\u00fcm noktas\u0131nda olan, yenilenebilir enerji kaynaklar\u0131na dayal\u0131 \u00fcretim tesisini,<br \/>\nf) Belediyeler taraf\u0131ndan i\u015fletilen su isale hatlar\u0131 ile at\u0131k su isale hatlar\u0131 \u00fczerinde kurulacak olan \u00fcretim tesisini,<br \/>\ng) Lisanss\u0131z \u00fcretim faaliyetinde bulunulacak olan tesislerin sisteme ba\u011flanmas\u0131na ili\u015fkin teknik usul ve esaslar ile sat\u0131\u015fa, ba\u015fvuru yap\u0131lmas\u0131na ve denetim yap\u0131lmas\u0131na ili\u015fkin usul ve esaslar\u0131,<br \/>\nh) Lisans alma y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcnden muaf olan, elektrik enerjisi \u00fcreten ger\u00e7ek ve t\u00fczel ki\u015filerin ihtiyac\u0131n\u0131n \u00fczerinde \u00fcretti\u011fi elektrik enerjisinin sisteme verilmesi h\u00e2linde uygulanacak usul ve esaslar\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/lisanssiz-elektrik-yonetmeligi-kabul-edildi_4724.html\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Sekt\u00f6r\u00fcn sab\u0131rs\u0131zl\u0131kla bekledi\u011fi Lisanss\u0131z Elektrik \u00dcretimi Y\u00f6netmeli\u011fi, Enerji Piyasas\u0131 D\u00fczenleme Kurulu`nun Per\u015fembe toplant\u0131s\u0131nda kabul edildi. \u00d6zellikle g\u00fcne\u015f ve r\u00fczgara dayal\u0131 lisanss\u0131z elektrik \u00fcretim [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14676,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[68,19,63,67,1009,165,750,13,8090,8089,8091,16],"views":719,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14675"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14675"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14675\/revisions"}],"predecessor-version":[{"id":14677,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14675\/revisions\/14677"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14676"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}