{"id":146677,"date":"2021-11-29T00:36:13","date_gmt":"2021-11-28T21:36:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=146677"},"modified":"2021-11-29T00:36:54","modified_gmt":"2021-11-28T21:36:54","slug":"ordu-daki-topcam-hesin-devri-icin-rekabet-izni-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ordu-daki-topcam-hesin-devri-icin-rekabet-izni-verildi\/","title":{"rendered":"(Turkish) Ordu&#8217;daki &#8216;Top\u00e7am HES&#8217;in Devri \u0130\u00e7in Rekabet \u0130zni Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/146677\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Ordu\u2019daki 61,35 MW\u2019l\u0131k\u00a0 Top\u00e7am Hidroelektrik Santraliyle birlikte bu santrale ait olan ta\u015f\u0131nmazlar\u0131n \u00f6zelle\u015ftirilme <img loading=\"lazy\" class=\"alignright wp-image-146679\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ordu-daki-topcam-hesin-devri-icin-rekabet-izni-verildi.jpg\" alt=\"\" width=\"320\" height=\"187\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ordu-daki-topcam-hesin-devri-icin-rekabet-izni-verildi.jpg 512w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ordu-daki-topcam-hesin-devri-icin-rekabet-izni-verildi-300x175.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ordu-daki-topcam-hesin-devri-icin-rekabet-izni-verildi-500x292.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ordu-daki-topcam-hesin-devri-icin-rekabet-izni-verildi-80x47.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kapsam\u0131nda devri i\u00e7in rekabet izni verildi.<\/h2>\n<p><strong>Elektrik \u00dcretim A.\u015e.<\/strong>\u2019ye<strong> (E\u00dcA\u015e)<\/strong> ait, Top\u00e7am Hidroelektrik Santrali ile bu santrale ait ta\u015f\u0131nmazlar <strong>\u2018\u0130\u015fletme Hakk\u0131n\u0131n Verilmesi\u2019 y\u00f6ntemi<\/strong> ile \u00f6zelle\u015ftirilmesi ile ilgili olarak <strong>Bilgin G\u00fc\u00e7 Santralleri Enerji \u00dcretim A.\u015e.<\/strong> ve <strong>Nokta Yat\u0131r\u0131m Holding A.\u015e.<\/strong>\u2019nin devralma i\u015flemlerine onay verildi.<\/p>\n<p><strong>Ordu<\/strong>\u2019da <strong>Mesudiye il\u00e7esi<\/strong> s\u0131n\u0131rlar\u0131nda,<strong> Melet Irma\u011f\u0131<\/strong>&#8216;nda yer alan<strong> Top\u00e7am HES <\/strong>2014&#8217;te tamamlanm\u0131\u015f fakat su s\u0131z\u0131nt\u0131s\u0131ndan dolay\u0131 \u00fcretime ge\u00e7emeyerek <strong>2016&#8217;n\u0131n Aral\u0131k ay\u0131nda<\/strong> enerji \u00fcretimine ba\u015flam\u0131\u015ft\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ordu\u2019daki 61,35 MW\u2019l\u0131k\u00a0 Top\u00e7am Hidroelektrik Santraliyle birlikte bu santrale ait olan ta\u015f\u0131nmazlar\u0131n \u00f6zelle\u015ftirilme kapsam\u0131nda devri i\u00e7in rekabet izni verildi. Elektrik \u00dcretim A.\u015e.\u2019ye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":146679,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[18,1033,34926,26044,7162,1248,50587,13930,93202],"views":1035,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/146677"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=146677"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/146677\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/146679"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=146677"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=146677"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=146677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}