{"id":146603,"date":"2021-11-27T16:25:28","date_gmt":"2021-11-27T13:25:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=146603"},"modified":"2021-11-27T16:25:42","modified_gmt":"2021-11-27T13:25:42","slug":"atik-yakma-ve-enerji-uretim-tesisi-istanbula-hizmet-vermeye-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/atik-yakma-ve-enerji-uretim-tesisi-istanbula-hizmet-vermeye-basladi\/","title":{"rendered":"(Turkish) &#8217;At\u0131k Yakma ve Enerji \u00dcretim Tesisi&#8217; \u0130stanbul\u2019a Hizmet Vermeye Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/146603\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>\u0130stanbul B\u00fcy\u00fck\u015fehir Belediyesi ve i\u015ftirak \u015firketi \u0130STA\u00c7, at\u0131k yakma ve enerji \u00fcretim tesisinin a\u00e7\u0131l\u0131\u015f\u0131n\u0131 ger\u00e7ekle\u015ftirdi.<\/h2>\n<p><img loading=\"lazy\" class=\"alignright wp-image-146605\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/atik-yakma-ve-enerji-uretim-tesisi-istanbula-hizmet-vermeye-basladi.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/atik-yakma-ve-enerji-uretim-tesisi-istanbula-hizmet-vermeye-basladi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/atik-yakma-ve-enerji-uretim-tesisi-istanbula-hizmet-vermeye-basladi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/atik-yakma-ve-enerji-uretim-tesisi-istanbula-hizmet-vermeye-basladi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/atik-yakma-ve-enerji-uretim-tesisi-istanbula-hizmet-vermeye-basladi-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Tesisin in\u015fas\u0131n\u0131 <strong>Hitachi Zosen \u0130nova AG<\/strong> ile birlikte <strong>Makyol&#8217;<\/strong>un temsil etti\u011fi <strong>T\u00fcrk grubu<\/strong> ortakl\u0131\u011f\u0131n\u0131 olu\u015fturan <strong>Makyol \u0130n\u015faat, \u0130spa in\u015faat<\/strong> ve<strong> Met-G\u00fcn in\u015faat<\/strong> \u015firketleri \u00fcstlendi.<\/p>\n<p><strong>\u0130stanbullular\u0131n<\/strong> <em>ya\u015fam kalitesini artt\u0131rmak, \u015fehrin do\u011fas\u0131n\u0131 ve t\u00fcm canl\u0131lar\u0131n\u0131 korumak amac\u0131yla yeni nesil, \u00e7evre dostu bertaraf ve at\u0131k geri kazan\u0131m\u0131 tesisi yat\u0131r\u0131mlar\u0131n\u0131<\/em> hayata ge\u00e7iren<strong> \u0130stanbul B\u00fcy\u00fck\u015fehir Belediyesi<\/strong> ve i\u015ftirak \u015firketi <strong>\u0130STA\u00c7<\/strong>, T\u00fcrkiye\u2019nin ilk, Avrupa\u2019n\u0131n en b\u00fcy\u00fck<strong> at\u0131k yakma ve enerji \u00fcretim tesisi<\/strong>ni \u0130stanbul\u2019a kazand\u0131rd\u0131.<\/p>\n<p><strong>\u0130BB At\u0131k Yakma ve Enerji \u00dcretim Tesisi<\/strong> \u0130stanbul\u2019un belediye at\u0131\u011f\u0131n\u0131n <strong>% 15<\/strong>\u2019ini, herhangi bir \u00f6n i\u015flem gerektirmeksizin her g\u00fcn ortalama <strong>3.000 ton<\/strong> at\u0131\u011f\u0131 do\u011frudan<strong> termal y\u00f6ntemlerle yakarak<\/strong> do\u011faya zarar vermeden <strong>bertaraf<\/strong> ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130stanbul B\u00fcy\u00fck\u015fehir Belediyesi ve i\u015ftirak \u015firketi \u0130STA\u00c7, at\u0131k yakma ve enerji \u00fcretim tesisinin a\u00e7\u0131l\u0131\u015f\u0131n\u0131 ger\u00e7ekle\u015ftirdi. Tesisin in\u015fas\u0131n\u0131 Hitachi Zosen \u0130nova AG ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":146605,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[80546,98867,98866,22935,35360],"views":179,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/146603"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=146603"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/146603\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/146605"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=146603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=146603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=146603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}