{"id":146590,"date":"2021-11-27T15:31:32","date_gmt":"2021-11-27T12:31:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=146590"},"modified":"2021-11-27T15:31:32","modified_gmt":"2021-11-27T12:31:32","slug":"ruppur-nukleer-guc-santrali-nin-1inci-unite-buhar-jeneratorleri-kuruldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruppur-nukleer-guc-santrali-nin-1inci-unite-buhar-jeneratorleri-kuruldu\/","title":{"rendered":"(Turkish) &#8217;Ruppur N\u00fckleer G\u00fc\u00e7 Santrali&#8217;nin 1&#8217;inci \u00dcnite Buhar Jenerat\u00f6rleri Kuruldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/146590\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un M\u00fchendislik Birimi ASE A.\u015e, Banglade\u015f Halk Cumhuriyeti\u2019nde in\u015fa edilen Ruppur N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019nci G\u00fc\u00e7 \u00dcnitesi\u2019ne ait 4 buhar jenerat\u00f6r\u00fcn\u00fcn tamam\u0131n\u0131 belirlenmi\u015f konumuna<img loading=\"lazy\" class=\"alignright wp-image-146592\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ruppur-nukleer-guc-santrali-nin-1inci-unite-buhar-jeneratorleri-kuruldu-1.jpg\" alt=\"\" width=\"320\" height=\"262\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ruppur-nukleer-guc-santrali-nin-1inci-unite-buhar-jeneratorleri-kuruldu-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ruppur-nukleer-guc-santrali-nin-1inci-unite-buhar-jeneratorleri-kuruldu-1-300x245.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ruppur-nukleer-guc-santrali-nin-1inci-unite-buhar-jeneratorleri-kuruldu-1-489x400.jpg 489w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ruppur-nukleer-guc-santrali-nin-1inci-unite-buhar-jeneratorleri-kuruldu-1-61x50.jpg 61w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/ruppur-nukleer-guc-santrali-nin-1inci-unite-buhar-jeneratorleri-kuruldu-1-500x409.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/> yerle\u015ftirdi.<\/h2>\n<p><strong>Buhar jenerat\u00f6rlerini<\/strong> takvime uygun olarak g\u00fc\u00e7 \u00fcnitesinin reakt\u00f6r b\u00f6lmesindeki belirlenen konumuna yerle\u015ftirmek i\u00e7in monte i\u015flemlerini <strong>Energospecmontazh A.\u015e.<\/strong> ta\u015feron \u015firketinin uzmanlar\u0131 ger\u00e7ekle\u015ftirdi.<\/p>\n<p>ASE A.\u015e Ruppur N\u00fckleer G\u00fc\u00e7 Santrali \u0130n\u015faat Projesi\u2019nin Ba\u015fkan Yard\u0131mc\u0131s\u0131 <strong>Aleksey Deriy<\/strong>:<em> \u201c1\u2019inci g\u00fc\u00e7 \u00fcnitesinin kurulum \u00e7al\u0131\u015fmalar\u0131n\u0131n bir di\u011fer \u00f6nemli a\u015famas\u0131 daha tamamland\u0131. Buhar jenerat\u00f6rlerinin sabit konumlar\u0131na yerle\u015ftirilmesi ile, reakt\u00f6r, buhar jenerat\u00f6rleri, ana sirk\u00fclasyon pompalar\u0131 gibi birincil devre ekipmanlar\u0131n\u0131n ba\u011flant\u0131s\u0131 i\u00e7in ana sirk\u00fclasyon pompalar\u0131ndaki kaynaklama i\u015flemlerinin ba\u015flamas\u0131na imkan veriyor\u201d<\/em> dedi.<\/p>\n<p>Buhar jenerat\u00f6rleri, <strong>AEM-Technologies A.\u015e.<\/strong>\u2019nin<strong> Volgodonsk<\/strong>\u2019taki \u015fubesi olan <strong>Atommash<\/strong>\u2019ta \u00fcretildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un M\u00fchendislik Birimi ASE A.\u015e, Banglade\u015f Halk Cumhuriyeti\u2019nde in\u015fa edilen Ruppur N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 1\u2019nci G\u00fc\u00e7 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":146592,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[98863,63818,19,1009,19356,98862],"views":483,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/146590"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=146590"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/146590\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/146592"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=146590"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=146590"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=146590"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}