{"id":146299,"date":"2021-11-22T14:04:56","date_gmt":"2021-11-22T11:04:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=146299"},"modified":"2021-11-22T14:04:56","modified_gmt":"2021-11-22T11:04:56","slug":"topcam-hes-in-devri-icin-rekabet-izni-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/topcam-hes-in-devri-icin-rekabet-izni-verildi\/","title":{"rendered":"(Turkish) &#8217;Top\u00e7am HES&#8217;in Devri \u0130\u00e7in Rekabet \u0130zni Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/146299\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Ordu\u2019da yer alan 61,35 MW\u2019l\u0131k Top\u00e7am Hidroelektrik Santrali ile santralin ta\u015f\u0131nmazlar\u0131n\u0131n \u00f6zelle\u015ftirilme kapsam\u0131nda devrine rekabet izni verildi.<\/h2>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-146301\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/topcam-hes-in-devri-icin-rekabet-izni-verildi.jpg\" alt=\"\" width=\"320\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/topcam-hes-in-devri-icin-rekabet-izni-verildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/topcam-hes-in-devri-icin-rekabet-izni-verildi-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/topcam-hes-in-devri-icin-rekabet-izni-verildi-500x320.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/topcam-hes-in-devri-icin-rekabet-izni-verildi-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Rekabet Kurulu (RK), Elektrik \u00dcretim A.\u015e.<\/strong>\u2019ye<strong> (E\u00dcA\u015e)<\/strong> ait, <strong>Top\u00e7am Hidroelektrik Santrali<\/strong> ile bu santral taraf\u0131ndan kullan\u0131lan ta\u015f\u0131nmazlar\u0131n<strong> \u2018\u0130\u015fletme Hakk\u0131n\u0131n Verilmesi\u2019<\/strong> y\u00f6ntemi ile \u00f6zelle\u015ftirilmesine y\u00f6nelik <strong>Bilgin G\u00fc\u00e7 Santralleri Enerji \u00dcretim A.\u015e.<\/strong> ve <strong>Nokta Yat\u0131r\u0131m Holding A.\u015e. <\/strong>tekliflerini sunmu\u015f olup\u00a0ger\u00e7ekle\u015ftirilecek devralma i\u015flemine izin verdi.<\/p>\n<p><strong>Ordu<\/strong> Mesudiye&#8217;de yer alan<strong>\u00a0Top\u00e7am Baraj\u0131<\/strong> ve <strong>Hidroelektrik Santrali\u2019nin (HES)<\/strong> temeli <strong>Devlet Su \u0130\u015fleri (DS\u0130)<\/strong> taraf\u0131ndan <strong>1997 y\u0131l\u0131nda<\/strong> at\u0131lm\u0131\u015ft\u0131. <strong>2014 y\u0131l\u0131nda<\/strong> tamamlanan ancak <strong>su s\u0131z\u0131nt\u0131s\u0131<\/strong> nedeniyle \u00fcretime ge\u00e7emeyen <strong>3 \u00fcniteli<\/strong> <strong>Hidroelektrik Santral (HES)<\/strong> 2016 y\u0131l\u0131 Aral\u0131k ay\u0131nda <strong>enerji \u00fcretmeye<\/strong> ba\u015flam\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ordu\u2019da yer alan 61,35 MW\u2019l\u0131k Top\u00e7am Hidroelektrik Santrali ile santralin ta\u015f\u0131nmazlar\u0131n\u0131n \u00f6zelle\u015ftirilme kapsam\u0131nda devrine rekabet izni verildi. Rekabet Kurulu (RK), Elektrik \u00dcretim [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":146301,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[98729,57394,19,1033,34926,98730,7162,1248,98732,98731],"views":977,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/146299"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=146299"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/146299\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/146301"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=146299"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=146299"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=146299"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}