{"id":14601,"date":"2013-08-28T17:18:50","date_gmt":"2013-08-28T14:18:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14601"},"modified":"2013-08-28T17:18:50","modified_gmt":"2013-08-28T14:18:50","slug":"norvec-ruzgar-kapasitesini-3-katina-cikaracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/norvec-ruzgar-kapasitesini-3-katina-cikaracak\/","title":{"rendered":"(Turkish) Norve\u00e7 R\u00fczgar Kapasitesini 3 Kat\u0131na \u00c7\u0131karacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14601\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Norve\u00e7 Petrol ve Enerji Bakan\u0131 Ola Borten Moe yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, \u00fclkede 3 firmaya 8 adet r\u00fczgar enerjisi santrali kurulmas\u0131na izin verildi\u011fini s\u00f6yledi. Yeni projelerle Norve\u00e7 r\u00fczgar enerjisi kapasite<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/norvec-ruzgar-kapasitesini-3-katina-cikaracak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-14602\" title=\"norvec-ruzgar-kapasitesini-3-katina-cikaracak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/norvec-ruzgar-kapasitesini-3-katina-cikaracak-300x215.jpg\" alt=\"\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/norvec-ruzgar-kapasitesini-3-katina-cikaracak-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/norvec-ruzgar-kapasitesini-3-katina-cikaracak-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/norvec-ruzgar-kapasitesini-3-katina-cikaracak.jpg 463w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>sini 3 kat\u0131na \u00e7\u0131karmay\u0131 hedefliyor.<\/strong><\/p>\n<p>Norve\u00e7li Bakan Moe konuyla ilgili olarak, \u201cBu norve\u00e7 i\u00e7in tarihi bir g\u00fcn. Norve\u00e7`in yenilenebilir enerji politikas\u0131nda \u00f6nemli bir yere sahip olacak&#8221; dedi.<\/p>\n<p><strong>1.3 GW`LIK ENERJ\u0130 \u00dcRETECEK<\/strong><br \/>\n8 yeni r\u00fczgar enerjisi santrali toplam 1.3 GW`l\u0131k enerji \u00fcretecek kapasitede olacak ve bu enerji yakla\u015f\u0131k 185 bin eve elektrik sa\u011flayacak. Projenin yakla\u015f\u0131k maliyeti ise 3.3 milyar dolar olacak. 2020 y\u0131l\u0131na kadar bu 8 yeni santrale ek olarak in\u015fa edilecek yeni r\u00fczgar \u00e7iftlikleri Norve\u00e7`in r\u00fczgardan elde etti\u011fi elektrik enerjisi kapasitesini 3 kat\u0131na \u00e7\u0131karacak.<\/p>\n<p>Norve\u00e7 2020 y\u0131l\u0131na kadar t\u00fcm enerji ihtiya\u00e7lar\u0131n\u0131n y\u00fczde 67.5`ini r\u00fczgardan kar\u015f\u0131lamay\u0131 hedefliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/norvec-ruzgar-kapasitesini-3-katina-cikaracak_4702.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Norve\u00e7 Petrol ve Enerji Bakan\u0131 Ola Borten Moe yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, \u00fclkede 3 firmaya 8 adet r\u00fczgar enerjisi santrali kurulmas\u0131na izin verildi\u011fini s\u00f6yledi. Yeni [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14602,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[8022,6369,63,67,1009,93,165,18,8019,6541,6331,8018,8017,474,69,16,231,8021,8023,8020],"views":720,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14601"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14601"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14601\/revisions"}],"predecessor-version":[{"id":14603,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14601\/revisions\/14603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14602"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14601"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}