{"id":14567,"date":"2013-08-27T17:53:55","date_gmt":"2013-08-27T14:53:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14567"},"modified":"2013-08-27T17:53:55","modified_gmt":"2013-08-27T14:53:55","slug":"laskar-enerjiden-malatyaya-hes-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/laskar-enerjiden-malatyaya-hes-projesi\/","title":{"rendered":"(Turkish) Laskar Enerji\u2019den Malatya\u2019ya HES Projesi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14567\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Laskar Enerji \u00dcretim Pazarlama A\u015e, Malatya P\u00f6t\u00fcrge \u0130l\u00e7esi Kaman Deresi, 14,5 MWm\u2019lik Kartalta\u015f\u0131 Reg. ve HES\u2019in kurulmas\u0131 i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131. \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019ne \u00c7ED ba\u015fvurusunu yapan firman\u0131n ba\u015fvurusu i\u00e7in 1. inceleme ve de\u011ferlendirme toplant\u0131s\u0131 26 A\u011fustos 2013 tarihinde d\u00fczenlendi.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/basbakandan-yusufeli-hes-talimati-hemen-bitirin.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-10680\" title=\"laskar-enerjiden-malatyaya-hes-projesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/basbakandan-yusufeli-hes-talimati-hemen-bitirin-300x164.jpg\" alt=\"en-cok-iade-edilen-lisans-turu-hes-oldu\" width=\"300\" height=\"164\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/basbakandan-yusufeli-hes-talimati-hemen-bitirin-300x164.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/basbakandan-yusufeli-hes-talimati-hemen-bitirin-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/basbakandan-yusufeli-hes-talimati-hemen-bitirin.jpg 466w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p><strong>PROJE 2 HES\u2019DEN OLU\u015eUYOR<\/strong><br \/>\nKaman Deresi\u2019nin su potansiyelinden faydalanarak enerji elde etmek amac\u0131yla 14,512 MWm \/13,937 MWe kurulu g\u00fcce sahip Kartalta\u015f\u0131 Reg\u00fclat\u00f6r\u00fc ve HES projesinin yap\u0131lmas\u0131 planlan\u0131yor. Proje kapsam\u0131nda Kartalta\u015f\u0131-1 Reg\u00fclat\u00f6r\u00fc ve HES (3 MWm\/2,881 Mwe) ile Kartalta\u015f\u0131-2 Reg\u00fclat\u00f6r\u00fc ve HES (11,512 MWm\/11,056 MWe )yer al\u0131yor.<br \/>\nKartalta\u015f\u0131 Reg\u00fclat\u00f6r\u00fc ve HES projesi\u2019nin in\u015faat s\u00fcresi 24 ay olarak \u00f6ng\u00f6r\u00fcl\u00fcyor. Projenin ekonomik \u00f6mr\u00fc ise 49 y\u0131l olarak planlan\u0131yor.<\/p>\n<p><strong>TOPLAM 27.219 GWh ELEKTR\u0130K \u00dcRET\u0130LMES\u0130 HEDEFLEN\u0130YOR<\/strong><br \/>\nKaman Deresi\u2019nin 1003.00 m kotu \u00fczerindeki ak\u0131mlar\u0131 \u00e7evrilerek, 635.00 m kotuna d\u00fc\u015f\u00fcr\u00fclmek suretiyle enerji \u00fcretilecek. Bu suretle Kartalta\u015f\u0131 1 HES i\u00e7in Toplam Enerji 8.224 GWh, Kartalta\u015f\u0131 2 HES i\u00e7in Toplam Enerji 27.219 GWh olup proje genelinde y\u0131ll\u0131k 35.443 Gwh enerji sa\u011flanmas\u0131 hedefleniyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/laskar-enerjiden-malatyaya-hes-projesi_4679.html\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Laskar Enerji \u00dcretim Pazarlama A\u015e, Malatya P\u00f6t\u00fcrge \u0130l\u00e7esi Kaman Deresi, 14,5 MWm\u2019lik Kartalta\u015f\u0131 Reg. ve HES\u2019in kurulmas\u0131 i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131. \u00c7evresel Etki De\u011ferlendirme [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10680,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[4402,4275,19,63,67,1009,7973,165,18,35370,1090,7972,7970,7969,7971],"views":1233,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14567"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14567"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14567\/revisions"}],"predecessor-version":[{"id":14569,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14567\/revisions\/14569"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10680"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}