{"id":145545,"date":"2021-11-10T12:01:36","date_gmt":"2021-11-10T09:01:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=145545"},"modified":"2021-11-10T12:06:58","modified_gmt":"2021-11-10T09:06:58","slug":"bolu-nun-9-ilcesi-nde-yatirim-bakim-ve-ek-tesis-faaliyetleri-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bolu-nun-9-ilcesi-nde-yatirim-bakim-ve-ek-tesis-faaliyetleri-devam-ediyor\/","title":{"rendered":"(Turkish) Bolu\u2019nun 9 \u0130l\u00e7esinde Yat\u0131r\u0131m, Bak\u0131m ve Ek Tesis Faaliyetleri Devam Ediyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/145545\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Bolu\u2019nun 9 il\u00e7esinde aral\u0131ks\u0131z s\u00fcren toplamda 50 milyon TL de\u011ferindeki yat\u0131r\u0131m, bak\u0131m ve ek tesis faaliyetlerinin y\u0131l sonuna kadar tamamlanmas\u0131 hedeflenirken SEDA\u015e\u2019\u0131n Bolu\u2019da bir y\u0131l zarf\u0131nda hayata ge\u00e7irdi\u011fi yat\u0131r\u0131m miktar\u0131 3 kattan fazla art\u0131\u015f g\u00f6stermi\u015f olacak.<\/strong><\/h2>\n<p><strong>Sakarya Elektrik Da\u011f\u0131t\u0131m A.\u015e. (SEDA\u015e)<\/strong>, hizmet verdi\u011fi b\u00f6lgelerin geli\u015fimine katk\u0131 sa\u011flamay\u0131 <img loading=\"lazy\" class=\"alignright wp-image-145548\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/bolu-nun-9-ilcesi-nde-yatirim-bakim-ve-ek-tesis-faaliyetleri-devam-ediyor-2.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/bolu-nun-9-ilcesi-nde-yatirim-bakim-ve-ek-tesis-faaliyetleri-devam-ediyor-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/bolu-nun-9-ilcesi-nde-yatirim-bakim-ve-ek-tesis-faaliyetleri-devam-ediyor-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/bolu-nun-9-ilcesi-nde-yatirim-bakim-ve-ek-tesis-faaliyetleri-devam-ediyor-2-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/bolu-nun-9-ilcesi-nde-yatirim-bakim-ve-ek-tesis-faaliyetleri-devam-ediyor-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/bolu-nun-9-ilcesi-nde-yatirim-bakim-ve-ek-tesis-faaliyetleri-devam-ediyor-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>s\u00fcrd\u00fcr\u00fcyor. <strong>Bolu Merkez, Seben, K\u0131br\u0131s\u00e7\u0131k, Gerede, Mengen, D\u00f6rtdivan, Yeni\u00e7a\u011fa, Mudurnu<\/strong> ve <strong>G\u00f6yn\u00fck il\u00e7elerinde<\/strong> bu y\u0131l\u0131n sonuna kadar <strong>kapasite art\u0131r\u0131m\u0131, \u015febeke yenileme<\/strong> ve <strong>ana hatlarda<\/strong> devam eden yeralt\u0131 \u00e7al\u0131\u015fmalar\u0131n\u0131n tamamlanmas\u0131 planlan\u0131yor. Toplamda <strong>50 milyon TL<\/strong>\u2019lik yat\u0131r\u0131m projeleri sonunda, SEDA\u015e <strong>193 bin aboneyi<\/strong> ilgilendiren Bolu\u2019daki yat\u0131r\u0131mlar\u0131n\u0131 son bir y\u0131lda <strong>3 kat\u0131n \u00fczerinde<\/strong> art\u0131rm\u0131\u015f olacak.<\/p>\n<h3><strong>\u201cYat\u0131r\u0131mlar s\u00fcrecek, Bolu\u2019ya hizmet vermeye devam edece\u011fiz\u201d<\/strong><\/h3>\n<p>SEDA\u015e Y\u00f6netim Kurulu ve \u0130cra Ba\u015fkan\u0131 Dr. Necmi Odyakmaz, Bolu\u2019daki yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131 de\u011ferlendirerek, <em>\u201cSEDA\u015e olarak Bolu, D\u00fczce, Gebze, Kocaeli ve Sakarya\u2019y\u0131 da kapsayan 20 bin kilometrekarelik alandaki 3,7 milyon n\u00fcfusa kaliteli<strong> elektrik da\u011f\u0131t\u0131m hizmeti<\/strong> sunuyoruz. Bu y\u0131l sonuna dek <strong>50 milyon TL<\/strong> olarak projelendirdi\u011fimiz <strong>yat\u0131r\u0131m, ek tesisler ve bak\u0131m-onar\u0131m \u00e7al\u0131\u015fmalar\u0131<\/strong> kapsam\u0131nda \u015fu anda <strong>9 il\u00e7ede<\/strong> <strong>\u015febeke yenileme, trafo deplase ve enerji nakil hatlar\u0131n\u0131n<\/strong> yeralt\u0131na al\u0131nmas\u0131 gibi faaliyetlerimiz t\u00fcm h\u0131z\u0131yla s\u00fcr\u00fcyor. Yat\u0131r\u0131mlar\u0131m\u0131z\u0131 g\u00fcnden g\u00fcne art\u0131rarak Bolu\u2019ya verdi\u011fimiz hizmetleri devam ettirece\u011fiz\u201d.<\/em><\/p>\n<h3><strong>\u0130\u015f g\u00fcvenli\u011fi ve operasyonda s\u00fcreklilik i\u00e7in planl\u0131 kesintiler<\/strong><\/h3>\n<p>Elektrik hizmetinde <strong>s\u00fcreklili\u011fi sa\u011flamay\u0131<\/strong> ve kentte <strong>artan enerji talebini kar\u015f\u0131lamay\u0131<\/strong> hedefleyen \u00e7al\u0131\u015fmalar\u0131n enerjili hatta yap\u0131labilmesinin m\u00fcmk\u00fcn olmamas\u0131 nedeniyle planl\u0131 kesintilere ba\u015fvuruluyor. M\u00fc\u015fterilerin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak ad\u0131na zorunluluk ta\u015f\u0131yan planl\u0131 kesintilerde, can ve mal g\u00fcvenli\u011fini koruyabilmek i\u00e7in hatlardaki enerji devre d\u0131\u015f\u0131 b\u0131rak\u0131larak \u00f6nceden belirtilen s\u00fcre \u00e7er\u00e7evesinde planl\u0131 elektrik kesintisi ger\u00e7ekle\u015ftiriliyor. Bu sayede, yat\u0131r\u0131m ve bak\u0131m i\u015flemlerinin emniyetli bi\u00e7imde yap\u0131labilirken, \u015febekelerde de teknik s\u00fcrd\u00fcr\u00fclebilirlik sa\u011flan\u0131yor.<\/p>\n<h3><strong>48 saat \u00f6nceden duyuru yap\u0131l\u0131yor<\/strong><\/h3>\n<p>Teknik ve d\u0131\u015f etmenlerden kaynakl\u0131 kesintilerin \u00f6n\u00fcne ge\u00e7ebilmek i\u00e7in yap\u0131lan \u00e7al\u0131\u015fmalarda planl\u0131 kesinti yap\u0131lacak b\u00f6lgelerin isimleri,<strong> 48 saat \u00f6nceden<\/strong> SEDA\u015e web sitesinden duyuruluyor. Ayr\u0131ca, m\u00fc\u015fteriler sistemde kay\u0131tl\u0131 bulunan telefon numaralar\u0131na<strong> SMS g\u00f6nderilerek<\/strong> yap\u0131l\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bolu\u2019nun 9 il\u00e7esinde aral\u0131ks\u0131z s\u00fcren toplamda 50 milyon TL de\u011ferindeki yat\u0131r\u0131m, bak\u0131m ve ek tesis faaliyetlerinin y\u0131l sonuna kadar tamamlanmas\u0131 hedeflenirken SEDA\u015e\u2019\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":145549,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[4634,15016,2873,532,17299,56856],"views":90,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/145545"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=145545"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/145545\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/145549"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=145545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=145545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=145545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}