{"id":145007,"date":"2021-11-01T12:44:02","date_gmt":"2021-11-01T09:44:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=145007"},"modified":"2021-11-01T12:59:58","modified_gmt":"2021-11-01T09:59:58","slug":"hareket-turkiye-nin-enerji-ihracatina-buyuk-destek-sagliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hareket-turkiye-nin-enerji-ihracatina-buyuk-destek-sagliyor\/","title":{"rendered":"(Turkish) &#8217;Hareket&#8217; T\u00fcrkiye\u2019nin Enerji \u0130hracat\u0131na B\u00fcy\u00fck Destek Sa\u011fl\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/145007\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Hareket, \u00d6zbekistan\u2019da y\u0131lda 510 MW enerji \u00fcretimi sa\u011flayacak iki enerji santralinin s\u00f6k\u00fcm, vin\u00e7 ve ta\u015f\u0131ma hizmetlerini \u00fcstlendi.<\/h2>\n<h3><strong>Santral 3 ay gibi rekor bir s\u00fcrede 4 bin kilometre ta\u015f\u0131nd\u0131<\/strong><\/h3>\n<p>Hareket, 240 MW <strong>Do\u011falgaz Kombine \u00c7evrim Enerji Santrali<\/strong>&#8216;ne ait en a\u011f\u0131r\u0131 172 ton olan t\u00fcm <img loading=\"lazy\" class=\"alignright wp-image-145010\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/hareket-turkiye-nin-enerji-ihracatina-buyuk-destek-sagliyor-2.jpg\" alt=\"\" width=\"320\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/hareket-turkiye-nin-enerji-ihracatina-buyuk-destek-sagliyor-2.jpg 468w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/hareket-turkiye-nin-enerji-ihracatina-buyuk-destek-sagliyor-2-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/11\/hareket-turkiye-nin-enerji-ihracatina-buyuk-destek-sagliyor-2-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ekipmanlar\u0131 yakla\u015f\u0131k <strong>4 bin km<\/strong> mesafedeki \u00d6zbekistan Ta\u015fkent\u2019te bulunan Kirbay b\u00f6lgesindeki yerine \u00fc\u00e7 ay gibi \u00e7ok k\u0131sa bir s\u00fcrede ula\u015ft\u0131rd\u0131. Par\u00e7alar, <strong>Samsun Liman\u0131<\/strong>\u2019ndan kanal gemisine y\u00fcklenerek <strong>Karadeniz<\/strong> ve<strong> Don-Volga Kanal\u0131<\/strong> \u00fczerinden <strong>Hazar Denizi\u2019nde<\/strong> Hareket&#8217;in hizmet verdi\u011fi <strong>Bautino A\u011f\u0131r Y\u00fck Terminali<\/strong>\u2019nde tahliye edildi. Ard\u0131ndan da yol \u015fartlar\u0131na uygun 1<strong>44 aksl\u0131k hidrolik ara\u00e7lar<\/strong> ile <strong>Ta\u015fkent Kirbay b\u00f6lgesine<\/strong> ta\u015f\u0131nd\u0131 ve <strong>gantry kald\u0131rma sistemi<\/strong> ile yerlerine monte edildi. Tesisin di\u011fer aksamlar\u0131 ise T\u00fcrkiye\u2019den <strong>272 adet<\/strong> gabarili ve standart ara\u00e7larla kara yolu \u00fczerinden b\u00f6lgeye ta\u015f\u0131nd\u0131.<\/p>\n<h3><strong>\u00d6zbekistan\u2019a ikinci santral \u0130zmir\u2019den ta\u015f\u0131n\u0131yor<\/strong><\/h3>\n<p>Hareket, \u015fimdi de <strong>\u0130zmir Alia\u011fa<\/strong>\u2019da bulunan 270 MW<strong> Do\u011falgaz Kombine \u00c7evrim Enerji Santrali<\/strong>\u2019nin 3500 km uzakl\u0131ktaki <strong>\u00d6zbekistan Buhara<\/strong>\u2019ya ta\u015f\u0131nmas\u0131 projesini ger\u00e7ekle\u015ftiriyor. Ta\u015f\u0131mas\u0131 devam eden projenin de <strong>\u00fc\u00e7 ay i\u00e7inde<\/strong> tamamlanmas\u0131 hedefleniyor.<\/p>\n<p>Santrale ait a\u011f\u0131rl\u0131klar\u0131 <strong>116-180 ton<\/strong> aras\u0131nda de\u011fi\u015fen<strong> 30 adet<\/strong> ekipman \u0130zmir\u2019deki fabrikadan al\u0131narak hidrolik dorselerle \u00f6nce <strong>Alia\u011fa Liman\u0131<\/strong>\u2019na, sonras\u0131nda da limandan y\u00fcklenerek<strong> Karadeniz<\/strong> ve <strong>Don-Volga Kanal\u0131<\/strong> \u00fczerinden Hazar Denizi\u2019nde Hareket&#8217;in hizmet verdi\u011fi <strong>Bautino A\u011f\u0131r Y\u00fck Terminali\u2019<\/strong>nde tahliye ediliyor. A\u011f\u0131rl\u0131klar\u0131 <strong>20-50 ton<\/strong> aras\u0131nda de\u011fi\u015fen par\u00e7alar ise <strong>560 adet<\/strong> tenteli&amp;lowbed ara\u00e7larla Buhara\u2019ya ula\u015ft\u0131r\u0131l\u0131yor. Bunlar\u0131n yan\u0131 s\u0131ra proje \u00f6zelinde T\u00fcrkiye i\u00e7i 3<strong> adet 125 ton<\/strong> trafo ve <strong>23 adet<\/strong> sal kasal\u0131k y\u00fck ta\u015f\u0131mas\u0131 ger\u00e7ekle\u015ftirilmi\u015ftir.<\/p>\n<h3><strong>T\u00fcrkiye Cumhuriyetlerden enerji santrallerine yo\u011fun talep var<\/strong><\/h3>\n<p>T\u00fcrkiye\u2019nin son y\u0131llarda enerji ihracat\u0131 konusunda \u00e7ok \u00f6nemli ad\u0131mlar att\u0131\u011f\u0131na dikkat \u00e7eken Hareket Genel M\u00fcd\u00fcr\u00fc Abdullah Altunkum, <span style=\"text-decoration: underline;\">\u015funlar\u0131 s\u00f6yledi:<\/span><em> \u201c\u00dclkemizde son y\u0131llarda faaliyet g\u00f6stermeyen fakat \u00e7al\u0131\u015f\u0131r durumdaki <strong>do\u011falgaz kombine \u00e7evrim enerji santralleri<\/strong> \u00f6zellikle T\u00fcrkiye Cumhuriyetlerden talep g\u00f6r\u00fcyor. Bu santrallerin ihracat\u0131 \u00fclke ekonomisine \u00e7ok ciddi bir katk\u0131 sa\u011fl\u0131yor. Ancak bir enerji santralinin ba\u015fka bir <strong>\u00fclkeye ta\u015f\u0131nmas\u0131<\/strong> \u00e7ok zorlu bir s\u00fcre\u00e7tir. Hareket olarak uzman kadromuz ve g\u00fc\u00e7l\u00fc ekipmanlar\u0131m\u0131zla <strong>s\u00f6k\u00fcm, vin\u00e7<\/strong> ve <strong>ta\u015f\u0131ma hizmetlerini<\/strong> ba\u015far\u0131yla ger\u00e7ekle\u015ftirerek santral ihracat\u0131nda \u00f6nemli bir rol \u00fcstleniyoruz.\u2019\u2019<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Hareket, \u00d6zbekistan\u2019da y\u0131lda 510 MW enerji \u00fcretimi sa\u011flayacak iki enerji santralinin s\u00f6k\u00fcm, vin\u00e7 ve ta\u015f\u0131ma hizmetlerini \u00fcstlendi. Santral 3 ay gibi rekor [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":145011,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[98095,98094,18,20724,10997],"views":269,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/145007"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=145007"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/145007\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/145011"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=145007"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=145007"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=145007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}