{"id":14500,"date":"2013-08-26T18:10:10","date_gmt":"2013-08-26T15:10:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14500"},"modified":"2013-08-26T18:10:10","modified_gmt":"2013-08-26T15:10:10","slug":"abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi\/","title":{"rendered":"(Turkish) Abu Dabi\u2019li TAQA, 12 Milyar Dolarl\u0131k T\u00fcrkiye Yat\u0131r\u0131m\u0131n\u0131 Erteledi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14500\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Abu Dabi\u2019li TAQA, T\u00fcrkiye\u2019de yapmay\u0131 planlad\u0131\u011f\u0131 12 milyar dolarl\u0131k k\u00f6m\u00fcr santrali projesini 2014\u2032e erteledi. Abu Dabi\u2019nin devlet kontrol\u00fcndeki ene<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-14501\" title=\"abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi-300x194.jpg\" alt=\"\" width=\"300\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi-500x323.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>rji \u015firketi Abu Dhabi National Energy Co (TAQA), T\u00fcrkiye\u2019deki 12 milyar dolarl\u0131k k\u00f6m\u00fcr santrali in\u015faat\u0131n\u0131 2014\u2032e erteledi.<\/strong><\/p>\n<h2>Karar\u0131n di\u011fer harcama \u00f6ncelikleri nedeniyle al\u0131nd\u0131\u011f\u0131 belirtildi<\/h2>\n<p>Elektrik \u00dcretim A\u015e ile TAQA aras\u0131ndaki Af\u015fin-Elbistan k\u00f6m\u00fcr havzas\u0131nda 8 bin MW kapasiteli elektrik santrali yap\u0131m\u0131n\u0131 i\u00e7eren 12 milyar dolarl\u0131k h\u00fck\u00fcmetler aras\u0131 anla\u015fma Ocak\u2019ta imzalanm\u0131\u015ft\u0131.<\/p>\n<p>TAQA s\u00f6zc\u00fcs\u00fc, \u201cTAQA di\u011fer harcama \u00f6nceliklerine ba\u011fl\u0131 olarak Af\u015fin-Elbistan\u2019a ili\u015fkin yat\u0131r\u0131m karar\u0131n\u0131 2014\u2032e kadar erteledi\u201d dedi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/08\/26\/abu-dabili-taqa-12-milyar-dolarlik-turkiye-yatirimini-erteledi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Abu Dabi\u2019li TAQA, T\u00fcrkiye\u2019de yapmay\u0131 planlad\u0131\u011f\u0131 12 milyar dolarl\u0131k k\u00f6m\u00fcr santrali projesini 2014\u2032e erteledi. Abu Dabi\u2019nin devlet kontrol\u00fcndeki enerji \u015firketi Abu Dhabi National [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14501,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[7927,7929,3719,7932,7931,63,67,165,117,7928,7930,1811,3721,846,7933],"views":801,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14500"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14500"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14500\/revisions"}],"predecessor-version":[{"id":14502,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14500\/revisions\/14502"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14501"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14500"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14500"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}