{"id":14487,"date":"2013-08-26T17:47:46","date_gmt":"2013-08-26T14:47:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14487"},"modified":"2013-08-26T18:12:33","modified_gmt":"2013-08-26T15:12:33","slug":"enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi\/","title":{"rendered":"(Turkish) Enerji Bakanl\u0131\u011f\u0131 TPAO \u0130le \u0130lgili Soru \u00d6nergesine Cevap Verdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14487\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>CHP Genel Ba\u015fkan Yard\u0131mc\u0131s\u0131 Sezgin Tanr\u0131kulu\u2019nun TPAO ile ilgili vermi\u015f oldu\u011fu yaz\u0131l\u0131 soru \u00f6nergesine Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019ndan cevap geldi.<\/strong><\/p>\n<h2>\u0130stanbul Milletvekili Sezgin Tanr\u0131kulu\u2019nun yaz\u0131l\u0131 soru \u00f6nergesi ve cevaplar\u0131<\/h2>\n<p>(7\/26580)<\/p>\n<p>Soru 1:<\/p>\n<p>TPAO kurumunun sahibi oldu\u011fu sismik ara\u015ft\u0131rma ve sondaj gemileri hangileridir?<\/p>\n<p>Cevap 1:<\/p>\n<p>T\u00fcrkiye Petrolleri Anonim Ortakl\u0131\u011f\u0131 (TPAO)\u2019nda Barbaros Hayreddin Pa\u015fa isimli bir adet sismik arama gemisi bulunmaktad\u0131r.<\/p>\n<p>Sorular 2, 4:<\/p>\n<p>&#8211; 2002 \u2013 2012 y\u0131lan aras\u0131nda sat\u0131n al\u0131narak TPAO b\u00fcnyesine kat\u0131lan sismik ara\u015ft\u0131rma ve sondaj gemileri bulunmakta m\u0131d\u0131r? Bulunmaktaysa bu gemiler i\u00e7in ne kadarl\u0131k \u00f6demede bulunulmu\u015ftur?<\/p>\n<p>&#8211; TPAO b\u00fcnyesinde Norve\u00e7 \u015firketi olan Polarcus firmas\u0131nca Dubai\u2019de in\u015fa edilen \u201cPolarcus Samur\u201d ara\u015ft\u0131rma gemisinin 130 milyon US Dolara sat\u0131n al\u0131nd\u0131\u011f\u0131 iddialar\u0131 do\u011fru mudur? S\u00f6z konusu gemi halen aktif olarak sismik ara\u015ft\u0131rma g\u00f6revi y\u00fcr\u00fctmeye ba\u015flam\u0131\u015f m\u0131d\u0131r?<\/p>\n<p>Cevaplar 2, 4:<\/p>\n<p>TPAO\u2019ya ait Barbaros Hayreddin Pa\u015fa sismik arama gemisi, Polarcus DMCC firmas\u0131ndan 31.12.2012 tarihinde sat\u0131n al\u0131nm\u0131\u015f olup, taraflarca imza alt\u0131na al\u0131nan gemi sat\u0131\u015f s\u00f6zle\u015fmesinin ilgili maddeleri do\u011frultusunda gemi i\u00e7in 130.000.000 $ (Y\u00fczotuzmilyon ABD Dolar\u0131) ve mobilizasyon i\u00e7in ise 3.500.000 $ (\u00dc\u00e7milyonbe\u015fy\u00fczbin ABD Dolar\u0131) \u00f6denmi\u015ftir. Bahse konu gemi, Karadeniz deniz alanlar\u0131nda iki boyutlu (2B) sismik veri toplama \u00e7al\u0131\u015fmas\u0131na 23.04.2013 tarihinde ba\u015flam\u0131\u015ft\u0131r. \u0130lk projesi olan Karadeniz\/Tuna-2B program\u0131n\u0131 yakla\u015f\u0131k 9.000 km\u2019lik iki boyutlu sismik veri toplayarak 19.07.2013 tarihinde tamamlam\u0131\u015ft\u0131r. Gemi, bir sonraki projeye ge\u00e7i\u015f yapmak \u00fczere limanda gerekli lojistik ikmal ve teknik destek \u00e7al\u0131\u015fmalar\u0131n\u0131 yapmaktad\u0131r.<\/p>\n<p>Soru 3:<\/p>\n<p>TPAO b\u00fcnyesinde kiralanarak hizmet veren sismik ara\u015ft\u0131rma ve sondaj gemileri bulunmakta m\u0131d\u0131r? Bulunmaktaysa y\u0131ll\u0131k toplam kiralama bedeli ne kadard\u0131r?<\/p>\n<p>Cevap 3:<\/p>\n<p>TPAO\u2019nda 2012 ve 2013 y\u0131llar\u0131na ili\u015fkin sismik arama yapmak \u00fczere kiralanm\u0131\u015f bir gemi bulunmamaktad\u0131r. 2012 y\u0131l\u0131nda kaz\u0131lan Istranca-1 kuyusu i\u00e7in GSP firmas\u0131ndan J\u00fcpiter adl\u0131 jack-up tipi sondaj platformu g\u00fcnl\u00fck 96,500 Euro\u2019ya kiralanm\u0131\u015ft\u0131r. 2013 y\u0131l\u0131 sonunda kaz\u0131lmas\u0131 planlanan G\u00fclcihan-2 kuyusu i\u00e7in yine GSP firmas\u0131ndan J\u00fcpiter adl\u0131 platform upgrade edilmi\u015f olarak g\u00fcnl\u00fck 155,000 Dolar\u2019a kiralanacakt\u0131r. Kontrat haz\u0131rl\u0131klar\u0131 devam ettirilmektedir.<\/p>\n<p>Sorular 5, 6:<\/p>\n<p>&#8211; Norve\u00e7 Polarcus Firmas\u0131na ara\u015ft\u0131rma personeli i\u00e7in \u00f6deme yap\u0131lmakta m\u0131d\u0131r? Ka\u00e7 personel i\u00e7in \u00f6deme yap\u0131lmaktad\u0131r? Ara\u015ft\u0131rma personellerinin tamam\u0131 Norve\u00e7lilerden mi olu\u015fmaktad\u0131r? Ara\u015ft\u0131rma personellerinin tamam\u0131 aktif olarak g\u00f6rev yapmakta m\u0131d\u0131r?<\/p>\n<p>-10.12.2012 tarihinde Norver\u00e7li \u015firketin web sitesinde (www.polarcus.com), \u015eubat 2013\u2032te Barbaros Hayrettin Pa\u015fa ad\u0131 ile g\u00f6reve ba\u015flayan Polarcus Samur gemisinin TPAO kurumuna sat\u0131\u015f\u0131 \u00fczerine anla\u015fmaya var\u0131ld\u0131\u011f\u0131, resmi anla\u015fma belgesinin ise 02.01.2013 tarihinde imza alt\u0131na al\u0131nd\u0131\u011f\u0131 belirtilmekte, geminin \u00e7\u0131plak maliyeti 130 milyon US Dolar iken, \u00f6n\u00fcm\u00fczdeki \u00fc\u00e7 y\u0131l \u0130\u00e7in Polarcus taraf\u0131ndan temin edilecek ara\u015ft\u0131rma personeli i\u00e7in ilaveten 83 milyon US Dolar\u2019\u0131n daha TPAO taraf\u0131ndan \u015firkete \u00f6denece\u011fi belirtilmektedir. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan geminin maliyeti 130 Milyon dolar olarak kamuoyuna a\u00e7\u0131klanmas\u0131na kar\u015f\u0131n 3 y\u0131ll\u0131k ara\u015ft\u0131rma personel giderlerinin de TPAO taraf\u0131ndan kar\u015f\u0131lanaca\u011f<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi.png\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-14488\" title=\"enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi-300x180.png\" alt=\"\" width=\"300\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi-300x180.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi-500x300.png 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi-80x48.png 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi.png 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u0131 iddialar\u0131 do\u011fru mudur?<\/p>\n<p>(7\/26580)<\/p>\n<p>Geminin maliyetinin 130 Milyon dolar de\u011fil asl\u0131nda 213 Milyon dolar oldu\u011fu iddialar\u0131 do\u011fru mudur?<\/p>\n<p>Cevaplar 5, 6:<\/p>\n<p>TPAO sismik gemi al\u0131m\u0131 \u00f6ncesinde; gerek geminin i\u015fletilmesi ve gerekse gemide teknik anlamda sismik verinin toplanmas\u0131 ile i\u015flenmesi i\u015f ve i\u015flemlerinin \u00fc\u00e7 y\u0131l s\u00fcre ile bir arada yap\u0131labilmesi y\u00f6n\u00fcnde ihale dok\u00fcmanlar\u0131 olu\u015fturulmu\u015f ve bahse konu ihtiya\u00e7lar bu ba\u011flamda tedarik edilmi\u015ftir. TPAO taraf\u0131ndan geminin sat\u0131n al\u0131nmas\u0131 esnas\u0131nda ihaleyi alan Polarcus DMCC firmas\u0131 aras\u0131nda imza alt\u0131na al\u0131nan \u00fc\u00e7 ayr\u0131 s\u00f6zle\u015fmede vergi ve masraflar hari\u00e7 olmak \u00fczere toplam maliyeti g\u00f6sterir tablo a\u015fa\u011f\u0131da yer almakta olup, tabloda g\u00f6r\u00fclece\u011fi \u00fczere gemi sat\u0131n al\u0131nmas\u0131 ve gemi mobilizasyon bedelleri hari\u00e7 olmak ko\u015fulu ile di\u011fer s\u00f6zle\u015fme bedelleri \u00fc\u00e7 y\u0131l i\u00e7erisinde (2013-2014-2015) ayl\u0131k bazda \u00f6denecektir.<\/p>\n<p>Gemi Sat\u0131n Al\u0131nmas\u0131 Bedeli Gemi devir sonras\u0131nda \u00f6deme yap\u0131lm\u0131\u015ft\u0131r. 130.000.000$<\/p>\n<p>Gemi Mobilizasyon Bedeli Gemi devir sonras\u0131nda \u00f6deme yap\u0131lm\u0131\u015ft\u0131r. 3.500.000 $<\/p>\n<p>I.Ara Toplam 133.500.000 $<\/p>\n<p>Gemi \u0130\u015fletmecili\u011fi Hizmet Al\u0131m\u0131 Bedeli 1. Y\u0131l (2013\/12 Ay) 4.950.000 $<\/p>\n<p>2. Y\u0131l (2014\/12 Ay) 7.150.000 S<\/p>\n<p>3. Y\u0131l (2015\/12 Ay) 7.700.000 $<\/p>\n<p>II. Ara Toplam 19.800.000 $<\/p>\n<p>Gemi Sismik Veri Toplama Hizmet Al\u0131m\u0131 Bedeli 1. Y\u0131l (2013\/12 Ay) 11.400.000 $ 2.499.996 $ 13.899.996$<\/p>\n<p>2. Y\u0131l (2014\/12 Ay) 19.400.000 $ 2.500.008 $ 21.900.008$<\/p>\n<p>3. Y\u0131l (2015\/12 Ay) 21,400.000 $ 2.500.008 $ 23.900.008$<\/p>\n<p>Soru 7:<\/p>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 TPAO b\u00fcnyesinde faaliyette bulunan sismik ara\u015ft\u0131rma gemileri taraf\u0131ndan yap\u0131lan ara\u015ft\u0131rmalarda \u00fclkemiz sular\u0131nda petrol-do\u011falgaz. rezervi tespit edilmi\u015f midir?<\/p>\n<p>Cevap 7:<\/p>\n<p>Ege-Toroslar-Akdeniz B\u00f6lgesinde, \u00fclkemiz sular\u0131nda petrol-do\u011falgaz rezervi tespit edilmemi\u015ftir. TPAO taraf\u0131ndan Karadeniz\u2019de Ak\u00e7akoca-Ere\u011fli aras\u0131nda kalan, 12 mil i\u00e7inde kalan deniz alan\u0131nda, deniz sismi\u011fi ve sonras\u0131nda belirlenen yap\u0131lar\u0131 test etmek \u00fczere yap\u0131lan sondajlarda \u00f6nce do\u011fal gaz ke\u015ffi ger\u00e7ekle\u015ftirilmi\u015f, ard\u0131ndan da 1.5-2 Milyar m3\u2032l\u00fck do\u011fal gaz rezervinin varl\u0131\u011f\u0131 belirlenmi\u015ftir. \u00dcretim faaliyetleri halen devam etmektedir. Karadeniz\u2019in derin alanlar\u0131nda ise yap\u0131lan sismik ara\u015ft\u0131rmalar sonucunda belirlenen lokasyonlarda a\u00e7\u0131lan kuyularda hen\u00fcz bir ke\u015fif yap\u0131lmam\u0131\u015ft\u0131r. Bu nedenle kesinle\u015fmi\u015f bir rezerv s\u00f6z konusu de\u011fildir. Kesin rezerv rakamlar\u0131n\u0131n verilmesi i\u00e7in a\u00e7\u0131lan kuyularda ke\u015fif yap\u0131lmas\u0131 gerekmektedir.<\/p>\n<p>(7\/26580)<\/p>\n<p>Soru 8:<\/p>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 TPAO b\u00fcnyesinde sismik ara\u015ft\u0131rma ve sondaj gemilerinde \u00e7al\u0131\u015fan T\u00fcrkiye Cumhuriyeti Vatanda\u015flar\u0131n\u0131n say\u0131s\u0131 nedir?<\/p>\n<p>Cevap 8:<\/p>\n<p>Barbaros Hayreddin Pa\u015fa sismik arama gemisinin millile\u015ftirilmesi ve T\u00fcrk bayra\u011f\u0131 \u00e7ekilebilmesi i\u00e7in ilgili yasalar gere\u011fince; birinci kaptan ba\u015fta olmak \u00fczere ve di\u011fer personelin % 51 \u2018ine denk gelen k\u0131sm\u0131n\u0131n T\u00fcrkiye Cumhuriyeti vatanda\u015f\u0131 olmas\u0131 gerekmektedir. Gemide 10 T\u00fcrkiye Cumhuriyeti vatanda\u015f\u0131 \u00e7al\u0131\u015fmaktad\u0131r. TPAO\u2019nun sondaj operasyonunu y\u00fcr\u00fctt\u00fc\u011f\u00fc sondaj platformlar\u0131nda m\u00fchendis seviyesinde T\u00fcrkiye Cumhuriyeti vatanda\u015f\u0131 \u00e7al\u0131\u015fmaktad\u0131r.<\/p>\n<p>Sorular 9,10:<\/p>\n<p>&#8211; Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 TPAO Kurumu b\u00fcnyesinde kullan\u0131lan sismik ara\u015ft\u0131rma ve sondaj gemilerinin sat\u0131n al\u0131mlar\u0131 veya kiralanmalar\u0131 i\u00e7in ihaleler d\u00fczenlenmi\u015f midir? -Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 resmi internet sayfas\u0131nda ihale ilanlar\u0131n\u0131n duyurular\u0131n\u0131 yapm\u0131\u015f m\u0131d\u0131r?<\/p>\n<p>Cevaplar 9,10:<\/p>\n<p>Barbaros Hayreddin Pa\u015fa sismik arama gemisinin sat\u0131n al\u0131nmas\u0131 esnas\u0131nda, TPAO y\u00f6netsel organizasyonu gere\u011fince mal al\u0131mlar\u0131 konusunda yetkin olan Makine \u0130kmal ve \u0130n\u015faat Daire Ba\u015fkanl\u0131\u011f\u0131 taraf\u0131ndan mal al\u0131mlar\u0131 ile ilgili gerek \u00fclkemiz ve gerekse TPAO ihale prosed\u00fcrleri yerine getirilmi\u015ftir. TPAO taraf\u0131ndan y\u00fcr\u00fct\u00fclen sondaj operasyonlar\u0131nda ise b\u00f6lgeye sondaj platformu getirebilecek firmalar ara\u015ft\u0131r\u0131lmakta ve bu firmalardan teklif al\u0131nmaktad\u0131r. Al\u0131nan teklifler, ilgili personelin olu\u015fturdu\u011fu komisyon taraf\u0131ndan teknik olarak incelenmekte, platformun operasyon yeterlili\u011fi kar\u015f\u0131la\u015ft\u0131r\u0131lmakta, kalite-maliyet analizi yap\u0131lmaktad\u0131r. Bu de\u011ferlendirmenin ard\u0131ndan, TPAO mal ve hizmet al\u0131m\u0131 ihale y\u00f6netmeli\u011fi do\u011frudan temin maddesine g\u00f6re kiralanmaktad\u0131r.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/08\/26\/enerji-bakanligi-tpao-ile-ilgili-soru-onergesine-cevap-verdi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.CHP Genel Ba\u015fkan Yard\u0131mc\u0131s\u0131 Sezgin Tanr\u0131kulu\u2019nun TPAO ile ilgili vermi\u015f oldu\u011fu yaz\u0131l\u0131 soru \u00f6nergesine Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019ndan cevap geldi. \u0130stanbul Milletvekili [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14488,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,44],"tags":[7913,63,67,1009,165,1972,7911,7914,7915,904,7912],"views":948,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14487"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14487"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14487\/revisions"}],"predecessor-version":[{"id":14503,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14487\/revisions\/14503"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14488"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}