{"id":144409,"date":"2021-10-22T12:05:21","date_gmt":"2021-10-22T09:05:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=144409"},"modified":"2021-10-22T12:05:21","modified_gmt":"2021-10-22T09:05:21","slug":"elektrik-nakil-hatti-yalitimi-kus-carpilmasi-ve-buna-bagli-kesintileri-onluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrik-nakil-hatti-yalitimi-kus-carpilmasi-ve-buna-bagli-kesintileri-onluyor\/","title":{"rendered":"(Turkish) &#8217;Elektrik Nakil Hatt\u0131 Yal\u0131t\u0131m\u0131&#8217; Ku\u015f \u00c7arp\u0131lmas\u0131 ve Buna Ba\u011fl\u0131 Kesintileri \u00d6nl\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/144409\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Toroslar EDA\u015e elektrik nakil hatlar\u0131ndaki ku\u015f \u00e7arp\u0131lmalar\u0131n\u0131, yakla\u015f\u0131k yar\u0131m milyon liral\u0131k bir yat\u0131r\u0131mla devreye ald\u0131\u011f\u0131 \u201cY\u00fcksek Gerilim Havai Hat \u0130zolasyonu Projesi\u201d ile 2017 y\u0131l\u0131ndan bu yana \u00f6nl\u00fcyor.<\/strong><\/h2>\n<p>Toroslar Elektrik Da\u011f\u0131t\u0131m A.\u015e. (Toroslar EDA\u015e) faaliyet g\u00f6sterdi\u011fi Adana, Gaziantep, Hatay, Kilis, Mersin ve Osmaniye\u2019de ba\u015flatt\u0131\u011f\u0131 <strong>elektrik nakil hatt\u0131 yal\u0131t\u0131m\u0131<\/strong> projesiyle ku\u015f \u00e7arp\u0131lmalar\u0131n\u0131n \u00f6n\u00fcne <img loading=\"lazy\" class=\"alignright wp-image-144411\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/elektrik-nakil-hatti-yalitimi-kus-carpilmasi-ve-buna-bagli-kesintileri-onluyor-1.jpg\" alt=\"\" width=\"320\" height=\"261\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/elektrik-nakil-hatti-yalitimi-kus-carpilmasi-ve-buna-bagli-kesintileri-onluyor-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/elektrik-nakil-hatti-yalitimi-kus-carpilmasi-ve-buna-bagli-kesintileri-onluyor-1-300x244.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/elektrik-nakil-hatti-yalitimi-kus-carpilmasi-ve-buna-bagli-kesintileri-onluyor-1-491x400.jpg 491w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/elektrik-nakil-hatti-yalitimi-kus-carpilmasi-ve-buna-bagli-kesintileri-onluyor-1-61x50.jpg 61w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/elektrik-nakil-hatti-yalitimi-kus-carpilmasi-ve-buna-bagli-kesintileri-onluyor-1-500x407.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ge\u00e7iyor.<\/p>\n<p>\u00d6zellikle <strong>ku\u015f g\u00f6\u00e7lerinin<\/strong> artt\u0131\u011f\u0131 d\u00f6nemlerde, ku\u015flar\u0131n <strong>elektrik da\u011f\u0131t\u0131m hatlar\u0131na<\/strong> konarak <strong>ak\u0131ma kap\u0131lmalar\u0131n\u0131 engellemeyi<\/strong> ama\u00e7layan <strong>Toroslar EDA\u015e<\/strong>, 2017 y\u0131l\u0131nda <strong>\u201cY\u00fcksek Gerilim Havai Hat \u0130zolasyonu Projesi\u201d<\/strong>ne ba\u015flad\u0131.<\/p>\n<p>Toroslar EDA\u015e, yakla\u015f\u0131k<strong> 500 bin liral\u0131k<\/strong> bir yat\u0131r\u0131mla hayata ge\u00e7irdi\u011fi projeyle, ku\u015flar\u0131n konarak ak\u0131ma kap\u0131labilece\u011fi <strong>elektrik da\u011f\u0131t\u0131m hatlar\u0131n\u0131n<\/strong> ilgili noktalar\u0131na, <strong>Do\u011fa Derne\u011fi<\/strong> ile s\u00fcrd\u00fcrd\u00fc\u011f\u00fc koordinasyon \u00e7er\u00e7evesince <strong>yal\u0131tkan malzeme montaj\u0131n\u0131<\/strong> tamamlad\u0131.<\/p>\n<h3><strong>% 76 iyile\u015fme<\/strong><\/h3>\n<p>Bak\u0131m \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda hatlardaki <strong>izolat\u00f6r, jumper<\/strong> ve<strong> iletken<\/strong> gibi <strong>da\u011f\u0131t\u0131m hatt\u0131<\/strong> unsurlar\u0131n\u0131n tehlikeli k\u0131s\u0131mlar\u0131n\u0131 da yal\u0131tan<strong> Toroslar EDA\u015e<\/strong>, 201&#8217;den g\u00fcn\u00fcm\u00fcze ak\u0131ma kap\u0131lma kaynakl\u0131 <strong>ku\u015f \u00f6l\u00fcmlerini<\/strong> ve buna ba\u011fl\u0131 <strong>enerji kesintilerini<\/strong> % 76 oran\u0131nda azaltmay\u0131 ba\u015fard\u0131.<\/p>\n<p>Kurulu\u015f projenin ba\u015far\u0131ya ula\u015fmas\u0131 \u00fczerine ilgili malzemeleri stoklar\u0131nda depolayarak, hem bak\u0131m \u00e7al\u0131\u015fmalar\u0131nda hem de yeni tesis edilecek hatlarda bu yal\u0131tkan malzemeleri kullanmay\u0131 s\u00fcrd\u00fcr\u00fcrken y\u00fcksek m\u00fc\u015fteri memnuniyeti hedefiyle \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcren <strong>Toroslar EDA\u015e<\/strong>, faaliyetlerini <strong>do\u011faya<\/strong> ve <strong>canl\u0131lar\u0131n ya\u015fam\u0131na<\/strong> da en \u00fcst d\u00fczeyde hassasiyetle ger\u00e7ekle\u015ftirmeye devam ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Toroslar EDA\u015e elektrik nakil hatlar\u0131ndaki ku\u015f \u00e7arp\u0131lmalar\u0131n\u0131, yakla\u015f\u0131k yar\u0131m milyon liral\u0131k bir yat\u0131r\u0131mla devreye ald\u0131\u011f\u0131 \u201cY\u00fcksek Gerilim Havai Hat \u0130zolasyonu Projesi\u201d ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":144413,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[97804,96572,3558,4470,97805],"views":165,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/144409"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=144409"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/144409\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/144413"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=144409"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=144409"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=144409"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}