{"id":14426,"date":"2013-08-23T18:03:27","date_gmt":"2013-08-23T15:03:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14426"},"modified":"2013-08-23T18:03:27","modified_gmt":"2013-08-23T15:03:27","slug":"beyaz-sarayin-catisina-gecikmeli-olarak-gunes-paneli-kuruluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/beyaz-sarayin-catisina-gecikmeli-olarak-gunes-paneli-kuruluyor\/","title":{"rendered":"(Turkish) Beyaz Saray&#8217;\u0131n \u00c7at\u0131s\u0131na Gecikmeli Olarak G\u00fcne\u015f Paneli Kuruluyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14426\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Amerika Birle\u015fik Devlet Ba\u015fkanlar\u0131n\u0131n resmi ikametgah\u0131 olan Beyaz Saray&#8217;\u0131n\u00a0 \u00e7at\u0131s\u0131na elektrik \u00fcretimi ve s\u0131cak su sa\u011flanmas\u0131 i\u00e7in g\u00fcne\u015f panelleri\u00a0 yerle\u015ftirilmeye ba\u015fland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p>Washington Post gazetesinin ismini a\u00e7\u0131klamad\u0131\u011f\u0131 bir Beyaz Saray yetkilisini\u00a0 kaynak g\u00f6stererek verdi\u011fi habere g\u00f6re g\u00fcne\u015f panellerinin kurulumu ba\u015flam\u0131\u015f\u00a0 durumda. Habere g\u00f6re ilgili yetkili e-posta ile yapt\u0131\u011f\u0131 a\u00e7\u0131klamada projede\u00a0 kullan\u0131lan g\u00fcne\u015f panellerinin tedarik\u00e7isi ve projenin maliyeti konusunda bilgi\u00a0 payla\u015fmaz iken, panellerin Amerikan yap\u0131m\u0131 oldu\u011funa ise vurgu yapt\u0131.<\/p>\n<p>Washington Post&#8217;un haber kayna\u011f\u0131, kurulumlar\u0131n binan\u0131n enerji verimlili\u011fini\u00a0 art\u0131racak kapsaml\u0131 bir \u00e7al\u0131\u015fman\u0131n par\u00e7as\u0131 oldu\u011funu ve tarihi binalarda g\u00fcne\u015f\u00a0 enerjisi ve ener<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/beyaz-sarayin-catisina-uc-yil-gecikmeli-olarak-gunes-paneli-kuruluyor.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-14427\" title=\"beyaz-sarayin-catisina-uc-yil-gecikmeli-olarak-gunes-paneli-kuruluyor\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/beyaz-sarayin-catisina-uc-yil-gecikmeli-olarak-gunes-paneli-kuruluyor-300x189.jpg\" alt=\"\" width=\"300\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/beyaz-sarayin-catisina-uc-yil-gecikmeli-olarak-gunes-paneli-kuruluyor-300x189.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/beyaz-sarayin-catisina-uc-yil-gecikmeli-olarak-gunes-paneli-kuruluyor-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/beyaz-sarayin-catisina-uc-yil-gecikmeli-olarak-gunes-paneli-kuruluyor.jpg 396w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ji verimlili\u011fi uygulamalar\u0131 geli\u015ftirilmesi anlam\u0131nda ta\u015f\u0131d\u0131\u011f\u0131\u00a0 \u00f6nemin alt\u0131n\u0131 \u00e7izdi.<\/p>\n<p>Yetkili ayn\u0131 zamanda enerji verimlili\u011fi ve g\u00fcne\u015f enerjisi alan\u0131nda\u00a0 ger\u00e7ekle\u015ftirilen uygulamalar\u0131n Beyaz Saray&#8217;\u0131n enerji giderlerini azaltmada\u00a0 sa\u011flayaca\u011f\u0131 katk\u0131 ile maliyetini 8 y\u0131lda kar\u015f\u0131layaca\u011f\u0131 bilgisini payla\u015ft\u0131.<\/p>\n<p>Bununla birlikte Beyaz Saray&#8217;\u0131n \u00e7at\u0131s\u0131na g\u00fcne\u015f panelleri kurulmas\u0131 projesini\u00a0 2010 y\u0131l\u0131nda \u00fclkenin Enerji Bakan\u0131 olan Steven Chu a\u00e7\u0131klam\u0131\u015f ve 2010 y\u0131l\u0131 bahar aylar\u0131n\u0131n sonuna kadar\u00a0 kurulumlar\u0131n tamamlanaca\u011f\u0131n\u0131 s\u00f6ylemi\u015fti. Chu \u00e7al\u0131\u015fman\u0131n g\u00fcne\u015f enerjisi\u00a0 teknolojisinin \u00fclke genelindeki evlere kurulumunun sa\u011flanmas\u0131 i\u00e7in haz\u0131r ve\u00a0 g\u00fcvenilir oldu\u011funu g\u00f6stermesi anlam\u0131nda \u00f6nemine de vurgu yapm\u0131\u015ft\u0131.<\/p>\n<p>Jimmy Carter ba\u015fkanl\u0131\u011f\u0131 d\u00f6neminde, 20 Haziran 1979&#8217;ta Beyaz Saray&#8217;\u0131n\u00a0 \u00e7at\u0131s\u0131na, s\u0131cak su sa\u011flamas\u0131 i\u00e7in 32 g\u00fcne\u015f paneli kurulumu ger\u00e7ekle\u015ftirilmi\u015f\u00a0 fakat, 1981 y\u0131l\u0131nda g\u00f6re gelen Carter&#8217;\u0131n halefi Ronald Reagan 1986 y\u0131l\u0131nda bu\u00a0 panelleri kald\u0131rm\u0131\u015ft\u0131. George W. Bush d\u00f6neminde ise Beyaz Saray&#8217;\u0131n hizmet\u00a0 binalar\u0131ndan birine elektrik \u00fcretimi amac\u0131 ile 167 g\u00fcne\u015f paneli, havuz suyunun\u00a0 \u0131s\u0131t\u0131lmas\u0131 i\u00e7in ise iki termal g\u00fcne\u015f enerjisi birimi kurulmu\u015ftu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/yenilenebilir-enerji\/beyaz-sarayin-catisina-uc-yil-gecikmeli-olarak-gunes-paneli-kuruluyor\" target=\"_blank\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Amerika Birle\u015fik Devlet Ba\u015fkanlar\u0131n\u0131n resmi ikametgah\u0131 olan Beyaz Saray&#8217;\u0131n\u00a0 \u00e7at\u0131s\u0131na elektrik \u00fcretimi ve s\u0131cak su sa\u011flanmas\u0131 i\u00e7in g\u00fcne\u015f panelleri\u00a0 yerle\u015ftirilmeye ba\u015fland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131. Washington [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14427,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[1198,7855,7857,19,63,67,1009,165,486,227,13,142,7858,7856,7859],"views":795,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14426"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14426"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14426\/revisions"}],"predecessor-version":[{"id":14429,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14426\/revisions\/14429"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14427"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}