{"id":143230,"date":"2021-10-04T00:09:45","date_gmt":"2021-10-03T21:09:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=143230"},"modified":"2021-10-04T00:09:45","modified_gmt":"2021-10-03T21:09:45","slug":"yeka-res-3-basvurulari-14-aralik-tarihine-ertelendi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-res-3-basvurulari-14-aralik-tarihine-ertelendi\/","title":{"rendered":"(Turkish) YEKA RES-3 Ba\u015fvurular\u0131 14 Aral\u0131k Tarihine Ertelendi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/143230\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>12 Ekim 2021&#8217;de yap\u0131laca\u011f\u0131 a\u00e7\u0131klanan YEKA RES-3 kapsam\u0131nda 42 adet yar\u0131\u015fma i\u00e7in ba\u015fvurular, 14 Aral\u0131k 2021<span style=\"text-decoration: underline;\"><img loading=\"lazy\" class=\"alignright wp-image-143232\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/yeka-res-3-basvurulari-14-aralik-tarihine-ertelendi.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/yeka-res-3-basvurulari-14-aralik-tarihine-ertelendi.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/yeka-res-3-basvurulari-14-aralik-tarihine-ertelendi-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/yeka-res-3-basvurulari-14-aralik-tarihine-ertelendi-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/10\/yeka-res-3-basvurulari-14-aralik-tarihine-ertelendi-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/span> tarihine ertelendi.<\/h2>\n<p><span style=\"text-decoration: underline;\">Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131, Enerji \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc;<\/span> YEKA Ama\u00e7l\u0131 Ba\u011flant\u0131 Kapasite Tahsisi Y\u00f6ntemi ve Yenilenebilir Enerji Kaynak Alanlar\u0131 Y\u00f6netmeli\u011findeki <strong>Yerli Mal\u0131 Kullan\u0131m Kar\u015f\u0131l\u0131\u011f\u0131 Tahsis (YMKT) Y\u00f6ntemine<\/strong> g\u00f6re toplam<strong> 2.000MWe<\/strong> g\u00fcc\u00fcndeki ba\u011flant\u0131 kapasitesinin tahsisi amac\u0131yla belirlenen ba\u011flant\u0131 b\u00f6lgelerinde,<strong> r\u00fczgar enerjisine dayal\u0131<\/strong> toplam da <strong>42 adet yar\u0131\u015fma<\/strong> (YEKA RES-3 Yar\u0131\u015fmalar\u0131) yap\u0131lacak.<\/p>\n<p><strong>12 Ekim 2021<\/strong> tarihinde yap\u0131laca\u011f\u0131 a\u00e7\u0131klanan yar\u0131\u015fmalar bakanl\u0131k taraf\u0131ndan <strong>14 Aral\u0131k 2021<\/strong> tarihinde <strong>09.30-13.00<\/strong> saatleri olarak de\u011fi\u015ftirildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 12 Ekim 2021&#8217;de yap\u0131laca\u011f\u0131 a\u00e7\u0131klanan YEKA RES-3 kapsam\u0131nda 42 adet yar\u0131\u015fma i\u00e7in ba\u015fvurular, 14 Aral\u0131k 2021 tarihine ertelendi. Enerji ve Tabii Kaynaklar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":143232,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[5320,97127,52319,97128],"views":343,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/143230"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=143230"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/143230\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/143232"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=143230"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=143230"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=143230"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}