{"id":14296,"date":"2013-08-21T09:20:25","date_gmt":"2013-08-21T06:20:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14296"},"modified":"2013-08-21T09:20:25","modified_gmt":"2013-08-21T06:20:25","slug":"aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-kredi-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-kredi-aldi\/","title":{"rendered":"(Turkish) Aksa Enerji \u00dc\u00e7 Farkl\u0131 R\u00fczgar Santrali Projesi \u0130\u00e7in Kredi Ald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14296\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aksa Enerji Belen\/Atik, K\u0131y\u0131k\u00f6y ve Sebenoba r\u00fczgar santrali projelerindeki kapasite art\u0131\u015f\u0131 ve baz\u0131 yat\u0131r\u0131mlar i\u00e7in de\u011fi\u015fik vadelerde toplam 44 milyon euroluk kredi sa\u011flad\u0131. Aksa Enerji\u2019nin KAP\u2019a yap\u0131\u011f\u0131 a\u00e7\u0131klamada \u201cYat\u0131r\u0131m\u0131 devam eden 3 adet R\u00fczgar Enerjisi Santrali projesi (RES) nin kalan t\u00fcrbin ekipmanlar\u0131 ile ilgili finansman 3 farkl\u0131 finansal kiralama kurulu\u015fundan sa\u011flanm\u0131\u015ft\u0131r\u201d ifadelerine yer verildi.<\/strong><\/p>\n<p>30 MW\u2019l\u0131k Belen\/Atik Proj<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-14297\" title=\"aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>esi\u2019nin 14 MW\u2019l\u0131k ikinci a\u015famas\u0131nda kullan\u0131lacak ve Gamesa firmas\u0131ndan sat\u0131n al\u0131nacak t\u00fcrbin setleri i\u00e7in Garanti Finansal Kiralama\u2019dan 9.3 milyon euroluk 10 y\u0131l vadeli finansman sa\u011fland\u0131. T\u00fcrbinlerin y\u0131l sonuna kadar ticari i\u015fletmeye al\u0131nmas\u0131 planlan\u0131yor.<\/p>\n<p>Aksa Enerji, 28 MW\u2019l\u0131k K\u0131y\u0131k\u00f6y R\u00fczgar Santrali Projesi\u2019nde kullan\u0131lacak ve yine Gamesa firmas\u0131ndan sat\u0131n al\u0131nacak 24MW\u2019l\u0131k t\u00fcrbin setleri i\u00e7in \u0130\u015f Finansal Kiralama\u2019dan 17.5 milyon euro tutar\u0131nda 9 ay \u00f6demesiz 129 ay vadeli finansman sa\u011flad\u0131.<\/p>\n<p>\u015eirket, 30 MW\u2019l\u0131k kapasite art\u0131\u015f\u0131 planlad\u0131\u011f\u0131 Sebenoba projesinde de bug\u00fcne kadar montaj\u0131 tamamlanm\u0131\u015f olan 4MW\u2019l\u0131k t\u00fcrbinlere ilave ikinci a\u015fama i\u00e7in Vestas\u2019tan al\u0131nacak toplam 24.6MW\u2019l\u0131k t\u00fcrbin setleri i\u00e7in Yap\u0131 Kredi Finansal Kiralama\u2019dan 17.2 milyon euro tutar\u0131nda iki y\u0131l \u00f6demesiz toplam 10 y\u0131l vadeli finansman sa\u011flad\u0131.<\/p>\n<p>T\u00fcrbin sevkiyatlar\u0131n\u0131n 2014 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde tamamlanarak ticari i\u015fletmeye al\u0131nmas\u0131 planlan\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/08\/21\/aksa-enerji-uc-farkli-ruzgar-santrali-projesi-icin-44-milyon-euro-kredi-aldi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aksa Enerji Belen\/Atik, K\u0131y\u0131k\u00f6y ve Sebenoba r\u00fczgar santrali projelerindeki kapasite art\u0131\u015f\u0131 ve baz\u0131 yat\u0131r\u0131mlar i\u00e7in de\u011fi\u015fik vadelerde toplam 44 milyon euroluk kredi sa\u011flad\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14297,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[7768,1571,63,67,1009,165,7766,7767,7769,6628,474,231,7770],"views":763,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14296"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14296"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14296\/revisions"}],"predecessor-version":[{"id":14298,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14296\/revisions\/14298"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14297"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}