{"id":142927,"date":"2021-09-28T13:58:51","date_gmt":"2021-09-28T10:58:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=142927"},"modified":"2021-09-28T13:58:51","modified_gmt":"2021-09-28T10:58:51","slug":"aksa-enerji-den-yil-sonunda-ozbekistan-da-uretim-hedefi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerji-den-yil-sonunda-ozbekistan-da-uretim-hedefi\/","title":{"rendered":"(Turkish) &#8217;Aksa Enerji&#8217;den Y\u0131l Sonunda \u00d6zbekistan&#8217;da \u00dcretim Hedefi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/142927\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Aksa Enerji, 2020 y\u0131l\u0131nda \u00d6zbekistan\u2019\u0131n ba\u015fkenti Ta\u015fkent ve Buhara\u2019da, toplamda 740 MW\u2019l\u0131k do\u011fal gaz kombine \u00e7evrim santralleri i\u00e7in ger\u00e7ekle\u015ftirdi\u011fi yat\u0131r\u0131mlar\u0131 faaliyete ge\u00e7irmek i\u00e7in g\u00fcn say\u0131yor.<\/h2>\n<p><strong>Ta\u015fkent\u2019te<\/strong> iki farkl\u0131 santralde toplam<strong> 470 MW<\/strong>, Buhara\u2019da ise <strong>270 MW<\/strong>\u2019l\u0131k kurulu g\u00fcce sahip <img loading=\"lazy\" class=\"alignright wp-image-142929\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aksa-enerji-den-yil-sonunda-ozbekistan-da-uretim-hedefi.jpg\" alt=\"\" width=\"320\" height=\"231\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aksa-enerji-den-yil-sonunda-ozbekistan-da-uretim-hedefi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aksa-enerji-den-yil-sonunda-ozbekistan-da-uretim-hedefi-300x217.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aksa-enerji-den-yil-sonunda-ozbekistan-da-uretim-hedefi-500x361.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aksa-enerji-den-yil-sonunda-ozbekistan-da-uretim-hedefi-69x50.jpg 69w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>santrallerin \u00fcretime ge\u00e7mesi i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcren Aksa Enerji, Ta\u015fkent\u2019teki santrallerin<strong> 240 MW<\/strong>\u2019l\u0131k b\u00f6l\u00fcm\u00fcn\u00fc bu y\u0131l\u0131n Aral\u0131k ay\u0131nda, <strong>230 MW<\/strong>\u2019l\u0131k k\u0131sm\u0131n\u0131 ise <strong>2022 Ocak ay\u0131nda<\/strong> faaliyete ge\u00e7irecek. Buhara\u2019da <strong>270 MW<\/strong> kapasiteye sahip santral ise <strong>2022 \u015eubat ay\u0131nda<\/strong> \u00fcretime ba\u015flayacak.<\/p>\n<p>Asya k\u0131tas\u0131ndaki ilk yat\u0131r\u0131m\u0131 olan \u00d6zbekistan santrallerinin devreye girmesiyle birlikte faaliyetlerini \u00fc\u00e7 k\u0131ta ve 6 \u00fclkeye ta\u015f\u0131yacak olan Aksa Enerji\u2019nin toplam kurulu g\u00fcc\u00fc ise <strong>2.706 MW<\/strong>\u2019a ula\u015facak. B\u00f6ylece \u015eirket\u2019in toplam kurulu g\u00fcc\u00fcn\u00fcn yakla\u015f\u0131k yar\u0131s\u0131 T\u00fcrkiye\u2019de, yar\u0131s\u0131 ise<strong> Afrika<\/strong> ve <strong>Asya<\/strong> k\u0131tas\u0131nda olacak. Co\u011frafi \u00e7e\u015fitlilik stratejisini ba\u015far\u0131yla hayata ge\u00e7irmeye devam eden Aksa Enerji, \u00d6zbekistan\u2019daki santrallerini 2021 y\u0131l\u0131 Aral\u0131k ay\u0131ndan ba\u015flamak \u00fczere <strong>2022 \u015eubat ay\u0131n\u0131n<\/strong> sonuna kadar devreye alacak. Proje, bug\u00fcn itibar\u0131yla yakla\u015f\u0131k <strong>% 70<\/strong> oran\u0131nda tamamland\u0131.<\/p>\n<p>Faaliyette bulundu\u011fu \u00fclkelerde istihdam etti\u011fi <strong>insan g\u00fcc\u00fcn\u00fcn sa\u011fl\u0131kl\u0131<\/strong> ve <strong>g\u00fcvenli ortamlarda<\/strong> \u00e7al\u0131\u015fmas\u0131 i\u00e7in yerel ve uluslararas\u0131 mevzuatlara ve ilgili di\u011fer y\u00fck\u00fcml\u00fcl\u00fcklere uymay\u0131 taahh\u00fct eden Aksa Enerji, \u00d6zbekistan projesinde \u015fimdiye kadar <strong>26.865 ki\u015fi<\/strong> saat <strong>\u0130SG e\u011fitimi<\/strong> verdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji, 2020 y\u0131l\u0131nda \u00d6zbekistan\u2019\u0131n ba\u015fkenti Ta\u015fkent ve Buhara\u2019da, toplamda 740 MW\u2019l\u0131k do\u011fal gaz kombine \u00e7evrim santralleri i\u00e7in ger\u00e7ekle\u015ftirdi\u011fi yat\u0131r\u0131mlar\u0131 faaliyete ge\u00e7irmek [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":142929,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53],"tags":[1571,3761,96793,5070,34924,10997],"views":327,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142927"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=142927"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142927\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/142929"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=142927"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=142927"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=142927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}