{"id":142682,"date":"2021-09-24T15:03:43","date_gmt":"2021-09-24T12:03:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=142682"},"modified":"2021-09-24T15:03:43","modified_gmt":"2021-09-24T12:03:43","slug":"girlevik-2-mercan-hes-ozellestiriliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/girlevik-2-mercan-hes-ozellestiriliyor\/","title":{"rendered":"(Turkish) Girlevik 2 Mercan HES \u00d6zelle\u015ftiriliyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/142682\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 taraf\u0131ndan Girlevik 2 Mercan HES ta\u015f\u0131nmazlar\u0131 ile birlikte \u00f6zelle\u015ftirilecek.<\/h2>\n<p><img loading=\"lazy\" class=\"alignright wp-image-142684\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/girlevik-2-mercan-hes-ozellestiriliyor.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/girlevik-2-mercan-hes-ozellestiriliyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/girlevik-2-mercan-hes-ozellestiriliyor-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/girlevik-2-mercan-hes-ozellestiriliyor-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/girlevik-2-mercan-hes-ozellestiriliyor-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Erzincan Merkez&#8217;de yer alan <strong>Elektrik \u00dcretim A.\u015e.\u2019ye (E\u00dcA\u015e)<\/strong> ait <strong>11,58MWe<\/strong> kapasiteye sahip <strong>Girlevik 2 Mercan Hidroelektrik Santrali (HES)<\/strong> ile bu santral taraf\u0131ndan kullan\u0131lan ta\u015f\u0131nmazlar\u0131, i\u015fletme hakk\u0131 verilecek <strong>\u00f6zelle\u015ftirilmesine<\/strong> y\u00f6nelik ihale yap\u0131lacak.<\/p>\n<p>\u0130hale kat\u0131l\u0131m\u0131 i\u00e7in <strong>1.500.000 TL<\/strong> tutar\u0131nda ge\u00e7ici teminat yat\u0131racak olup <strong>ihale \u015fartnamesi<\/strong> ve <strong>tan\u0131t\u0131m dok\u00fcman\u0131<\/strong> <em>T\u00fcrkiye Cumhuriyeti Hazine ve Maliye Bakanl\u0131\u011f\u0131 \u00d6zelle\u015ftirme \u0130daresi<\/em> Ba\u015fkanl\u0131\u011f\u0131\u2019ndan temin edilecek.<\/p>\n<p>Teklifler ise en ge\u00e7 <strong>23 Kas\u0131m 2021<\/strong> saat:<strong> 17.00<\/strong>\u2019ye kadar,<strong> \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131<\/strong>\u2019na elden teslim edilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 taraf\u0131ndan Girlevik 2 Mercan HES ta\u015f\u0131nmazlar\u0131 ile birlikte \u00f6zelle\u015ftirilecek. Erzincan Merkez&#8217;de yer alan Elektrik \u00dcretim A.\u015e.\u2019ye (E\u00dcA\u015e) ait 11,58MWe [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":142684,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[5070,69393,1033,96786,34926,1090,1954,1248,7540],"views":911,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142682"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=142682"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142682\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/142684"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=142682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=142682"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=142682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}