{"id":142484,"date":"2021-09-22T11:39:11","date_gmt":"2021-09-22T08:39:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=142484"},"modified":"2021-09-22T12:29:16","modified_gmt":"2021-09-22T09:29:16","slug":"turkiye-13-gw-lik-gunes-enerji-projeleri-ile-gucune-guc-katacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-13-gw-lik-gunes-enerji-projeleri-ile-gucune-guc-katacak\/","title":{"rendered":"(Turkish) &#8217;T\u00fcrkiye&#8217; 1,3 GW&#8217;l\u0131k G\u00fcne\u015f Enerji Projeleri ile G\u00fcc\u00fcne G\u00fc\u00e7 Katacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/142484\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>GE Yenilenebilir Enerji bug\u00fcn Kalyon taraf\u0131ndan T\u00fcrkiye&#8217;deki 270 MW\u2019l\u0131k Karap\u0131nar Faz II-A ve 810 MW\u2019l\u0131k Karap\u0131nar Faz II-B g\u00fcne\u015f enerjisi santrallerine <strong>FLEX<\/strong>INVERTER* g\u00fcne\u015f enerjisi teknolojisini temin etmek \u00fczere se\u00e7ildi\u011fini duyurdu. \u0130\u015fin kapsam\u0131 tasar\u0131m, m\u00fchendislik, proje y\u00f6netimi, \u015fantiye y\u00f6netimi ve hizmete a\u00e7ma s\u00fcre\u00e7lerini i\u00e7eriyor. T\u00fcrkiye&#8217;de, Konya \u015fehrinin Karap\u0131nar il\u00e7esinde bulunan projenin Aral\u0131k 2022&#8217;ye kadar ticari faaliyete ge\u00e7mesi bekleniyor.<\/h2>\n<p><strong>GE Yenilenebilir Enerji<\/strong>, ayr\u0131ca <strong>267 MW<\/strong>&#8216;l\u0131k Karap\u0131nar <strong>Faz 1 g\u00fcne\u015f enerjisi santrali<\/strong> i\u00e7in <img loading=\"lazy\" class=\"alignright wp-image-142489\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-13-gw-lik-gunes-enerji-projeleri-ile-gucune-guc-katacak-1.jpg\" alt=\"\" width=\"320\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-13-gw-lik-gunes-enerji-projeleri-ile-gucune-guc-katacak-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-13-gw-lik-gunes-enerji-projeleri-ile-gucune-guc-katacak-1-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-13-gw-lik-gunes-enerji-projeleri-ile-gucune-guc-katacak-1-500x320.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-13-gw-lik-gunes-enerji-projeleri-ile-gucune-guc-katacak-1-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>FLEXINVERTER*<\/strong> g\u00fcne\u015f enerjisi \u00fcnitesinin kurulumunu da tamamlad\u0131. Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan 2017 y\u0131l\u0131nda ba\u015flat\u0131lan ilk <strong>T\u00fcrk Solar YEKA ihalesi<\/strong>nin bir par\u00e7as\u0131 olan Karap\u0131nar g\u00fcne\u015f enerjisi santrali, <strong>Uluslararas\u0131 Enerji Ajans\u0131&#8217;na (IEA)<\/strong> g\u00f6re, \u00fclkenin yenilenebilir enerji kaynaklar\u0131n\u0131n art\u0131r\u0131lmas\u0131n\u0131 te\u015fvik eden faaliyetleri s\u00fcrd\u00fcrmesine ve <strong>2017-2027 d\u00f6nemi<\/strong>nde <strong>10 gigawatt (GW) g\u00fcne\u015f kapasitesi<\/strong>ni devreye almas\u0131na yard\u0131mc\u0131 olacak.<\/p>\n<p><strong>Kalyon Enerji<\/strong> konuyla ilgili <span style=\"text-decoration: underline;\">\u015fu de\u011ferlendirmede bulundu:<\/span> <em>&#8220;T\u00fcrkiye&#8217;nin bu dev yenilenebilir enerji projesinde <strong>GE<\/strong> ile ortak olmaktan mutluluk duyuyoruz. G\u00fcne\u015f enerjisi alan\u0131ndaki derin uzmanl\u0131\u011f\u0131yla bizi destekleyen GE ile birlikte <strong>267 MW<\/strong>&#8216;\u0131 ba\u015far\u0131yla devreye ald\u0131k ve <strong>Faz 1 \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131<\/strong> tamamlad\u0131k. Ayr\u0131ca, <strong>Faz 2<\/strong>\u2019yi (1080 MW) devreye alma faaliyetlerimizi de \u00e7ok yak\u0131nda ba\u015flataca\u011f\u0131z. Pandeminin getirdi\u011fi zorluklara ra\u011fmen GE, \u00e7ok iyi bir i\u015f \u00e7\u0131kararak <strong>Faz 1<\/strong> i\u00e7in ekipman\u0131m\u0131z\u0131 <strong>planlanan \u015fekilde ticari i\u015fletme<\/strong> tarihine yeti\u015ftirebilmemizi sa\u011flad\u0131\u201d<\/em>.<\/p>\n<p>Bu proje, GE&#8217;nin ABD d\u0131\u015f\u0131nda <strong>FLEXINVERTER* teknolojisi<\/strong>ni uygulad\u0131\u011f\u0131 ilk proje olma \u00f6zelli\u011fini ta\u015f\u0131yor. <strong>FLEXINVERTER* G\u00fcne\u015f Enerjisi Santrali<\/strong> (\u00f6<em>nceden LV5+ G\u00fcne\u015f Enerjisi Santrali olarak biliniyordu<\/em>), t\u00fcm\u00fc standart 20 fitlik ISO y\u00fcksek hacimli konteynere entegre edilen <strong>g\u00fcne\u015f enerjisi inverteri, orta gerilim g\u00fc\u00e7 trafosu<\/strong> ve iste\u011fe ba\u011fl\u0131 <strong>OG Halka Ana \u00dcnitesini (RMU)<\/strong> birle\u015ftiren, entegre konteynerli bir \u00e7\u00f6z\u00fcmd\u00fcr. Teknoloji, \u015febeke \u00f6l\u00e7e\u011finde <strong>g\u00fcne\u015f enerjisi<\/strong> ve <strong>depolama uygulamalar\u0131<\/strong> i\u00e7in <strong>g\u00fcvenilir, uygun maliyetli, tak-\u00e7al\u0131\u015ft\u0131r tipi, fabrikada entegre g\u00fc\u00e7 d\u00f6n\u00fc\u015ft\u00fcrme platformu<\/strong> sunmaya yard\u0131mc\u0131 olan, ak\u0131ll\u0131 bir \u00e7\u00f6z\u00fcm sa\u011flar. Yat\u0131r\u0131m ve i\u015fletme giderlerini azaltmaya ve daha <strong>g\u00fcvenilir santral performans\u0131 sa\u011flamaya<\/strong> yard\u0131mc\u0131 olur.<\/p>\n<p>GE, <strong>montaj yap\u0131lar\u0131<\/strong>n\u0131n ve <strong>DC kablolar\u0131n<\/strong> T\u00fcrkiye&#8217;de, yerel olarak \u00fcretilmesini sa\u011flayacak. <strong>GE<\/strong>&#8216;nin <strong>\u015eebeke \u00c7\u00f6z\u00fcmleri i\u015fletmesi<\/strong>nin Gebze, T\u00fcrkiye&#8217;deki \u00fcretim tesisi de <strong>g\u00fcne\u015f enerjisi inverteri<\/strong> sistemindeki entegrasyon i\u00e7in <strong>gerekli olan trafolar\u0131<\/strong> \u00fcretecek.<\/p>\n<p><em>GE Yenilenebilir Enerji Yenilenebilir Hibrit<\/em> CEO&#8217;su <strong>Prakash Chandra<\/strong> proje ile ilgili olarak yapt\u0131\u011f\u0131 a\u00e7\u0131klamada <em>\u201cT\u00fcrkiye&#8217;de g\u00fcne\u015f enerjisi i\u00e7in muazzam bir potansiyel var ve bu potansiyel daha fazla do\u011fal enerji kayna\u011f\u0131n\u0131 <strong>\u015febekeye g\u00fcvenilir \u015fekilde<\/strong> ve <strong>\u015febeke \u00f6l\u00e7e\u011finde<\/strong> entegre etmeye yard\u0131mc\u0131 olacak ak\u0131ll\u0131 \u00e7\u00f6z\u00fcmlerle ele al\u0131nabilir. Bu projelerde <strong>Kalyon<\/strong> ile ortak olmaktan heyecan duyuyoruz ve T\u00fcrkiye&#8217;ye <strong>daha fazla yenilenebilir enerji sunma f\u0131rsat\u0131<\/strong> i\u00e7in sab\u0131rs\u0131zlan\u0131yoruz\u201d<\/em> ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GE Yenilenebilir Enerji bug\u00fcn Kalyon taraf\u0131ndan T\u00fcrkiye&#8217;deki 270 MW\u2019l\u0131k Karap\u0131nar Faz II-A ve 810 MW\u2019l\u0131k Karap\u0131nar Faz II-B g\u00fcne\u015f enerjisi santrallerine FLEXINVERTER* [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":142490,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,96649,96648,19897,47770,2206,32399,34920,86018,96652,61665,96650],"views":319,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142484"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=142484"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142484\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/142490"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=142484"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=142484"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=142484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}