{"id":142129,"date":"2021-09-14T14:32:30","date_gmt":"2021-09-14T11:32:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=142129"},"modified":"2021-09-14T14:38:59","modified_gmt":"2021-09-14T11:38:59","slug":"sakarya-da-kurulacak-biyokutle-santrali-tavuk-gubresinden-enerji-uretecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sakarya-da-kurulacak-biyokutle-santrali-tavuk-gubresinden-enerji-uretecek\/","title":{"rendered":"Biomass Plant to be Established Will Produce Energy from Chicken Manure"},"content":{"rendered":"<p><\/p>\n<h2>1.3 Mwh by Ko\u00e7 Yi\u011fit Uz Teknik Makine in Sakarya Biomass <img loading=\"lazy\" class=\"alignright wp-image-142132\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sakarya-da-kurulacak-biyokutle-santrali-tavuk-gubresinden-enerji-uretecek.jpeg\" alt=\"\" width=\"320\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sakarya-da-kurulacak-biyokutle-santrali-tavuk-gubresinden-enerji-uretecek.jpeg 465w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sakarya-da-kurulacak-biyokutle-santrali-tavuk-gubresinden-enerji-uretecek-300x179.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sakarya-da-kurulacak-biyokutle-santrali-tavuk-gubresinden-enerji-uretecek-80x48.jpeg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Fired Electric Power Generation Facility will be established with capacity.<\/h2>\n<p>Energy will be produced by burning 86 tons\/day chicken manure at the facility, which will be established with an investment cost of 6.3 million liras.<\/p>\n<p>Mechanical energy will be produced with the help of alternators and transferred to the grid with the help of transformers.<\/p>","protected":false},"excerpt":{"rendered":"<p>1.3 Mwh by Ko\u00e7 Yi\u011fit Uz Teknik Makine in Sakarya Biomass Fired Electric Power Generation Facility will be established with capacity. Energy will be produced by burning 86 tons\/day chicken manure at the facility, which will be established with an investment cost of 6.3 million liras. Mechanical energy will be produced with the help of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":142132,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[3014,96449,96448,1678,41926,96445,96453,96452,43219,96450,5070,96447,96446,96444,96451,2241,87056,2839,38661],"views":991,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142129"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=142129"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142129\/revisions"}],"predecessor-version":[{"id":142136,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/142129\/revisions\/142136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/142132"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=142129"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=142129"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=142129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}