{"id":141707,"date":"2021-09-07T17:16:00","date_gmt":"2021-09-07T14:16:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=141707"},"modified":"2021-09-07T17:21:30","modified_gmt":"2021-09-07T14:21:30","slug":"turkiye-nin-agustos-2021de-kurulu-gucunun-7-435-mwlik-kismi-gunes-ten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-agustos-2021de-kurulu-gucunun-7-435-mwlik-kismi-gunes-ten\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;nin A\u011fustos 2021&#8217;de Kurulu G\u00fcc\u00fcn\u00fcn 7.435 MW&#8217;l\u0131k K\u0131sm\u0131 G\u00fcne\u015f&#8217;ten!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/141707\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) A\u011fustos 2021 Kurulu G\u00fc\u00e7 Raporuna g\u00f6re, kurulu g\u00fc\u00e7 toplam\u0131 98.492,7 MW olurken A\u011fustos 2021&#8217;de kurulu g\u00fcc\u00fcn 7.435,2 MW\u2019l\u0131k k\u0131sm\u0131 g\u00fcne\u015f santrallerinden sa\u011fland\u0131.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"alignright wp-image-141709\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-nin-agustos-2021de-kurulu-gucunun-7-435-mwlik-kismi-gunes-ten.jpg\" alt=\"\" width=\"320\" height=\"170\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-nin-agustos-2021de-kurulu-gucunun-7-435-mwlik-kismi-gunes-ten.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-nin-agustos-2021de-kurulu-gucunun-7-435-mwlik-kismi-gunes-ten-300x160.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-nin-agustos-2021de-kurulu-gucunun-7-435-mwlik-kismi-gunes-ten-500x266.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/turkiye-nin-agustos-2021de-kurulu-gucunun-7-435-mwlik-kismi-gunes-ten-80x43.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>G\u00fcne\u015f enerjisi<strong>\u00a0kurulu g\u00fcc\u00fcm\u00fcz<\/strong> bir \u00f6nceki aya k\u0131yasla <strong>111 MW<\/strong> artm\u0131\u015f olup 2021 y\u0131l\u0131n\u0131n <strong>ilk 8 ay\u0131nda<\/strong> g\u00fcne\u015f enerjisinde kurulu g\u00fc\u00e7 <strong>768 MW<\/strong> art\u0131\u015f g\u00f6sterdi.<\/p>\n<p>TE\u0130A\u015e\u2019in verilerinden derlenen bilgiye g\u00f6re, kurulu g\u00fc\u00e7te en b\u00fcy\u00fck pay <strong>25.548,7 MW<\/strong> ile do\u011fal gaz santralleri olurken bunu\u00a0<strong>23.272,9 MW<\/strong> ile barajl\u0131 kaynaklar takip ederken linyit tipi santrallerin kurulu g\u00fcc\u00fc <strong>10.119,9 MW<\/strong>, r\u00fczgar santrallerinin <strong>10.014,1 MW<\/strong> ithal k\u00f6m\u00fcr yak\u0131tl\u0131 santrallerin kurulu g\u00fcc\u00fc <strong>8.995,4 MW<\/strong> oldu. Akarsu tipi hidroelektrik santrallerin kurulu g\u00fcc\u00fc <strong>8.167,9 MW<\/strong>, jeotermalin <strong>1.650,2 MW<\/strong> ve biyok\u00fctlenin ise\u00a0<strong>1.429,7 MW<\/strong> olarak ger\u00e7ekle\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) A\u011fustos 2021 Kurulu G\u00fc\u00e7 Raporuna g\u00f6re, kurulu g\u00fc\u00e7 toplam\u0131 98.492,7 MW olurken A\u011fustos 2021&#8217;de kurulu g\u00fcc\u00fcn 7.435,2 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":141709,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,23311,53157,79122],"views":202,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141707"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=141707"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141707\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/141709"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=141707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=141707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=141707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}