{"id":141639,"date":"2021-09-06T13:27:53","date_gmt":"2021-09-06T10:27:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=141639"},"modified":"2021-09-06T13:31:12","modified_gmt":"2021-09-06T10:31:12","slug":"meski-cati-tipi-gunes-enerjisi-santralini-hayata-geciriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/meski-cati-tipi-gunes-enerjisi-santralini-hayata-geciriyor\/","title":{"rendered":"(Turkish) &#8217;MESK\u0130&#8217; \u00c7at\u0131 Tipi G\u00fcne\u015f Enerjisi Santralini Hayata Ge\u00e7iriyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/141639\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Mersin B\u00fcy\u00fck\u015fehir Belediyesi Mersin Su ve Kanalizasyon \u0130daresi (MESK\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan \u00c7at\u0131 Tipi G\u00fcne\u015f Enerjisi Santralleri (GES) Projesi\u2019nin hayata ge\u00e7irilmesine y\u00f6nelik \u00e7al\u0131\u015fmalar s\u00fcr\u00fcyor.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"alignright wp-image-141643\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/meski-cati-tipi-gunes-enerjisi-santralini-hayata-geciriyor.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/meski-cati-tipi-gunes-enerjisi-santralini-hayata-geciriyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/meski-cati-tipi-gunes-enerjisi-santralini-hayata-geciriyor-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/meski-cati-tipi-gunes-enerjisi-santralini-hayata-geciriyor-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/meski-cati-tipi-gunes-enerjisi-santralini-hayata-geciriyor-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/meski-cati-tipi-gunes-enerjisi-santralini-hayata-geciriyor-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>MESK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc<\/strong>, y\u00fcksek enerji t\u00fcketimli tesislerinin <strong>enerji ihtiya\u00e7lar\u0131n\u0131 yenilenebilir enerjiden<\/strong> kar\u015f\u0131lamaya y\u00f6nelik\u00a0<strong>Toroslar, Yeni\u015fehir ve Tarsus<\/strong> il\u00e7elerindeki<strong> 3 \u00f6nemli su deposu\/terfi istasyonu<\/strong>na<strong> 2.82 MWp<\/strong> g\u00fcc\u00fcnde <strong>\u00c7at\u0131 Tipi G\u00fcne\u015f Enerji Santrali<\/strong> kuruyor.<\/p>\n<p>Temiz enerjiyi kullanmaya y\u00f6nelik harekete ge\u00e7en MESK\u0130, <strong>Tarsus D2 su deposu<\/strong> ve<strong> terfi istasyonu<\/strong>na <strong>680 kWp<\/strong> (yakla\u015f\u0131k 1700 adet panel), Toroslar D2 <strong>su deposu ve terfi istasyonu<\/strong>na 1302 kWp (yakla\u015f\u0131k 3 bin 255 adet panel) ve Yeni\u015fehir DY2A <strong>su deposu ve terfi istasyonu<\/strong>na 838 kWp (yakla\u015f\u0131k 2 bin 95 panel) olarak toplam da<strong> 2.82 MWp<\/strong> g\u00fcce sahip\u00a0<strong>\u00c7at\u0131 Tipi G\u00fcne\u015f Enerji Santralleri<\/strong>\u2019nin kurulumunu s\u00fcrd\u00fcr\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Mersin B\u00fcy\u00fck\u015fehir Belediyesi Mersin Su ve Kanalizasyon \u0130daresi (MESK\u0130) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan \u00c7at\u0131 Tipi G\u00fcne\u015f Enerjisi Santralleri (GES) Projesi\u2019nin hayata ge\u00e7irilmesine y\u00f6nelik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":141643,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[30581,52089,85270,5070,36334,96112,96113,26335,96114,2321,96115,14442,96116],"views":202,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141639"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=141639"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141639\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/141643"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=141639"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=141639"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=141639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}