{"id":141605,"date":"2021-09-06T11:21:46","date_gmt":"2021-09-06T08:21:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=141605"},"modified":"2021-09-06T11:27:45","modified_gmt":"2021-09-06T08:27:45","slug":"mitsubishi-electric-5g-acik-inovasyon-laboratuvari-kuruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mitsubishi-electric-5g-acik-inovasyon-laboratuvari-kuruyor\/","title":{"rendered":"(Turkish) Mitsubishi Electric 5G A\u00e7\u0131k \u0130novasyon Laboratuvar\u0131 Kuruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/141605\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Mitsubishi Electric Corporation &#8220;yerel 5G&#8221; \u00f6zel mobil ileti\u015fim sistemlerinin ara\u015ft\u0131rma ve test g\u00f6sterimleri konusunda m\u00fc\u015fteriler ve ortak \u015firketlerle i\u015f birli\u011fi yapmak i\u00e7in 5G OPEN INNOVATION Lab<sup>TM<\/sup>\u2019i yak\u0131nda kullanmaya<img loading=\"lazy\" class=\"alignright wp-image-141607\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/mitsubishi-electric-5g-acik-inovasyon-laboratuvari-kuruyor-2.jpg\" alt=\"\" width=\"320\" height=\"218\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/mitsubishi-electric-5g-acik-inovasyon-laboratuvari-kuruyor-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/mitsubishi-electric-5g-acik-inovasyon-laboratuvari-kuruyor-2-300x205.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/mitsubishi-electric-5g-acik-inovasyon-laboratuvari-kuruyor-2-500x341.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/mitsubishi-electric-5g-acik-inovasyon-laboratuvari-kuruyor-2-73x50.jpg 73w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/> ba\u015flayaca\u011f\u0131n\u0131 duyurdu.<\/h2>\n<p>\u015eirketin Kanawaga eyaleti Kamakura \u015fehrinde bulunan <strong>Bilgi Teknolojileri Ar-Ge Merkezi<\/strong>\u2019nde kurulan 132 metrekarelik tesis, <strong>30 Haziran&#8217;da<\/strong> faaliyetlerine ba\u015flad\u0131. Mitsubishi Electric, k\u0131sa bir s\u00fcre \u00f6nce <strong>Japonya \u0130\u00e7i\u015fleri ve \u0130leti\u015fim Bakanl\u0131\u011f\u0131 (MIC)<\/strong> taraf\u0131ndan, belirli ihtiya\u00e7lar\u0131 kar\u015f\u0131lamak \u00fczere belirlenmi\u015f alanlarda <strong>belediyeler<\/strong> ve <strong>\u015firketler<\/strong> taraf\u0131ndan \u00f6zel kullan\u0131m i\u00e7in tasarlanm\u0131\u015f yerel <strong>5G mobil ileti\u015fim sistemleri<\/strong>ni i\u015fletmek \u00fczere lisans ald\u0131.<\/p>\n<p>Laboratuvar\u0131n <strong>4.8GHz\u20134.9GHz<\/strong> test ortam\u0131, ilk a\u015famalardan itibaren belirli i\u015f vb. ihtiya\u00e7lara y\u00f6nelik \u00e7\u00f6z\u00fcmleri ara\u015ft\u0131rmak ve g\u00f6stermek i\u00e7in kullan\u0131lacak. \u00d6zellikle, <strong>her uygulama<\/strong> ve <strong>ama\u00e7<\/strong> i\u00e7in en iyi ileti\u015fim y\u00f6ntemini belirlemek ad\u0131na, <strong>yerel 5G<\/strong> ile<strong> Wi-Fi 6<\/strong> ve <strong>\u00f6zel LTE<\/strong> gibi <strong>di\u011fer kablosuz y\u00f6ntemlerin<\/strong> kar\u015f\u0131la\u015ft\u0131rmal\u0131 do\u011frulamalar\u0131 yap\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Mitsubishi Electric Corporation &#8220;yerel 5G&#8221; \u00f6zel mobil ileti\u015fim sistemlerinin ara\u015ft\u0131rma ve test g\u00f6sterimleri konusunda m\u00fc\u015fteriler ve ortak \u015firketlerle i\u015f birli\u011fi yapmak i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":141608,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,157],"tags":[96090,96088,96089,79170,96087,65918],"views":116,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141605"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=141605"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141605\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/141608"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=141605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=141605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=141605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}