{"id":141580,"date":"2021-09-05T22:13:31","date_gmt":"2021-09-05T19:13:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=141580"},"modified":"2021-09-05T22:16:39","modified_gmt":"2021-09-05T19:16:39","slug":"aydemin-soke-res-ine-yardimci-kaynak-ges-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aydemin-soke-res-ine-yardimci-kaynak-ges-kurulacak\/","title":{"rendered":"(Turkish) Aydem\u2019e Ait S\u00f6ke RES&#8217;e Yard\u0131mc\u0131 Kaynak GES Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/141580\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Aydem Yenilenebilir Enerji\u2019ye ait Ayd\u0131n S\u00f6ke&#8217;de bulunan 49,5 MW kurulu g\u00fc\u00e7teki S\u00f6ke R\u00fczgar Enerjisi Santrali (RES) tesisine ilave 44,9997 MW kurulu g\u00fcce sahip <img loading=\"lazy\" class=\"alignright wp-image-141582\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aydemin-soke-resine-ges-kurulacak.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aydemin-soke-resine-ges-kurulacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aydemin-soke-resine-ges-kurulacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aydemin-soke-resine-ges-kurulacak-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aydemin-soke-resine-ges-kurulacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/aydemin-soke-resine-ges-kurulacak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yard\u0131mc\u0131 kaynak g\u00fcne\u015f santrali (Hibrit GES) kurulmas\u0131na ili\u015fkin ba\u015fvuru EPDK taraf\u0131ndan onayland\u0131.<\/h2>\n<p>\u0130zin s\u00fcre\u00e7lerinin 2021&#8217;in i\u00e7erisinde tamamlanmas\u0131 planlan\u0131rken ilave tesisin in\u015fas\u0131na ise 2022&#8217;de ba\u015flayacak olup tesisin yine 2022 y\u0131l\u0131nda devreye al\u0131nmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>S\u00f6ke RES<\/strong>, ilave <strong>G\u00fcne\u015f santrali\u00a0<\/strong>de dahil olmak \u00fczere, tamamen <strong>YEKDEM<\/strong>&#8216;den<strong> destek almay\u0131<\/strong> s\u00fcrd\u00fcrecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aydem Yenilenebilir Enerji\u2019ye ait Ayd\u0131n S\u00f6ke&#8217;de bulunan 49,5 MW kurulu g\u00fc\u00e7teki S\u00f6ke R\u00fczgar Enerjisi Santrali (RES) tesisine ilave 44,9997 MW kurulu g\u00fcce [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":141582,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[7429,89335,750,46050,35307,96083],"views":388,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141580"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=141580"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141580\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/141582"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=141580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=141580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=141580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}