{"id":141532,"date":"2021-09-04T21:00:29","date_gmt":"2021-09-04T18:00:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=141532"},"modified":"2021-09-04T21:01:17","modified_gmt":"2021-09-04T18:01:17","slug":"maxplast-plastik-fabrikasinin-cati-ustu-gunes-santrali-kurulumu-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/maxplast-plastik-fabrikasinin-cati-ustu-gunes-santrali-kurulumu-tamamlandi\/","title":{"rendered":"(Turkish) Maxplast Plastik Fabrikas\u0131&#8217;n\u0131n \u00c7at\u0131 \u00dcst\u00fc GES Kurulumu Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/141532\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Gaziantep\u2019te faaliyetlerini s\u00fcrd\u00fcren Maxplast plastik fabrikas\u0131n\u0131n \u00e7at\u0131 \u00fcst\u00fc 2.195 kilovat kapasiteye sahip g\u00fcne\u015f santral kurulumu CW Enerji taraf\u0131ndan ger\u00e7ekle\u015ftirildi.<\/strong><\/h2>\n<p>G\u00fcne\u015f santralinde toplam <strong>5.558<\/strong> adet fotovoltaik panel kullan\u0131l\u0131rken fabrikan\u0131n enerji ihtiyac\u0131n\u0131n \u00f6nemli <img loading=\"lazy\" class=\"alignright wp-image-141535\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/maxplast-plastik-fabrikasinin-cati-ustu-gunes-santrali-kurulumu-tamamlandi.jpg\" alt=\"\" width=\"320\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/maxplast-plastik-fabrikasinin-cati-ustu-gunes-santrali-kurulumu-tamamlandi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/maxplast-plastik-fabrikasinin-cati-ustu-gunes-santrali-kurulumu-tamamlandi-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/maxplast-plastik-fabrikasinin-cati-ustu-gunes-santrali-kurulumu-tamamlandi-500x320.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/maxplast-plastik-fabrikasinin-cati-ustu-gunes-santrali-kurulumu-tamamlandi-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>bir b\u00f6l\u00fcm\u00fc g\u00fcne\u015f enerjisinden kar\u015f\u0131lanacak.<\/p>\n<p>Konuya y\u00f6nelik a\u00e7\u0131klamalarda bulunan CW Enerji Genel M\u00fcd\u00fcr\u00fc <strong>Volkan Y\u0131lmaz<\/strong>,<\/p>\n<p><em> \u201cFabrikalara <strong>\u00e7at\u0131 \u00fczeri g\u00fcne\u015f enerji santrali<\/strong> kurmaya devam ediyoruz. Fabrikalar, g\u00fcne\u015f gibi s\u0131n\u0131rs\u0131z bir g\u00fcc\u00fc olan kaynaktan faydalanmak istiyorlar. \u00c7at\u0131lar\u0131na kurduklar\u0131 g\u00fcne\u015f enerji santralleri ile firmalar ayn\u0131 zamanda <strong>do\u011fa dostu bir \u00e7\u00f6z\u00fcm de<\/strong> sa\u011flam\u0131\u015f oluyor. G\u00fcne\u015f santralleri hem \u00e7evreye fayda sa\u011fl\u0131yor hem de \u00fclkemizin ekonomisine katk\u0131da bulunuyorlar. \u00d6n\u00fcm\u00fczdeki y\u0131llarda artan <strong>k\u00fcresel elektrik talebinin kar\u015f\u0131lanmas\u0131<\/strong> konusunda yenilenebilir enerjinin pay\u0131 daha da artacak.\u201d<\/em> ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Gaziantep\u2019te faaliyetlerini s\u00fcrd\u00fcren Maxplast plastik fabrikas\u0131n\u0131n \u00e7at\u0131 \u00fcst\u00fc 2.195 kilovat kapasiteye sahip g\u00fcne\u015f santral kurulumu CW Enerji taraf\u0131ndan ger\u00e7ekle\u015ftirildi. G\u00fcne\u015f santralinde toplam [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":141535,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[45408,13555,80144,89835,53157,96061,54979],"views":287,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141532"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=141532"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141532\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/141535"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=141532"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=141532"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=141532"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}