{"id":141505,"date":"2021-09-03T14:51:15","date_gmt":"2021-09-03T11:51:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=141505"},"modified":"2021-09-03T14:51:15","modified_gmt":"2021-09-03T11:51:15","slug":"sel-felaketinin-yasandigi-sinoptaki-konteyner-evlere-enerji-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sel-felaketinin-yasandigi-sinoptaki-konteyner-evlere-enerji-verildi\/","title":{"rendered":"(Turkish) Sel Felaketinin Ya\u015fand\u0131\u011f\u0131 Sinop\u2019taki Konteyner Evlere Enerji Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/141505\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Sel felaketinin ya\u015fand\u0131\u011f\u0131 Sinop\u2019un Ayanc\u0131k \u0130l\u00e7esi&#8217;nde sefer olan YEDA\u015e ekipleri, sular alt\u0131nda kalan trafo merkezlerini onard\u0131 ve kurulan konteyner evlere enerji verildi.<\/h2>\n<p><strong>Sinop&#8217;un Ayanc\u0131k \u0130l\u00e7esi\u2019ndeki<\/strong> sel afetinin hemen ard\u0131ndan adeta seferber olan <strong>YEDA\u015e<\/strong>, t\u00fcm ekipleri ve teknik donan\u0131m\u0131yla \u00e7al\u0131\u015fmalar\u0131n\u0131 aral\u0131ks\u0131z s\u00fcrd\u00fcr\u00fcyor. YEDA\u015e ekipleri, sel nedeniyle sular\u0131n alt\u0131nda kalan trafolar\u0131 an\u0131nda onararak kurulan <strong>konteyner evlere enerji ak\u0131m\u0131n\u0131<\/strong> sa\u011flad\u0131.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-141507\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sel-felaketinin-yasandigi-sinoptaki-konteyner-evlere-enerji-verildi.jpg\" alt=\"\" width=\"550\" height=\"279\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sel-felaketinin-yasandigi-sinoptaki-konteyner-evlere-enerji-verildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sel-felaketinin-yasandigi-sinoptaki-konteyner-evlere-enerji-verildi-300x152.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sel-felaketinin-yasandigi-sinoptaki-konteyner-evlere-enerji-verildi-500x254.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/09\/sel-felaketinin-yasandigi-sinoptaki-konteyner-evlere-enerji-verildi-80x41.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<h3>39 ADET KONTEYNER EVE ELEKTR\u0130K<\/h3>\n<p>Felaketin yo\u011fun olarak ya\u015fand\u0131\u011f\u0131 <strong>Ayanc\u0131k&#8217;\u0131n Baba\u00e7ay K\u00f6y\u00fc\u2019nde<\/strong> evleri hasar g\u00f6ren vatanda\u015flar i\u00e7in AFAD taraf\u0131ndan b\u00f6lgeye ge\u00e7ici konteyner evler kuruldu. YEDA\u015e ekipleri ise ilk etapta 19, ikinci etapta 10 ve \u00fc\u00e7\u00fcnc\u00fc etapta da<strong> 10<\/strong> olmak \u00fczere <strong>39 adet<\/strong> konteynerin<strong> topraklama <\/strong>ve<strong> \u00e7evre ayd\u0131nlatmalar\u0131<\/strong> dahil <strong>elektrik alt yap\u0131s\u0131n\u0131<\/strong> tamamlad\u0131 ve ma\u011fdur<strong> vatanda\u015flar elektrik enerjisine<\/strong> kavu\u015fturdu.<\/p>\n<h3>YEDA\u015e PERSONEL\u0130 FELAKET B\u00d6LGES\u0130NDE<\/h3>\n<p>Enerji ihtiyac\u0131n\u0131n kar\u015f\u0131lanmas\u0131 amac\u0131yla b\u00f6lgeye ayr\u0131ca <strong>110 KVA jenerat\u00f6r montaj\u0131<\/strong> yapt\u0131klar\u0131n\u0131 ve g\u00fcnl\u00fck olarak yak\u0131t ikmali sa\u011flad\u0131klar\u0131n\u0131 s\u00f6yleyen YEDA\u015e Da\u011f\u0131t\u0131m Direkt\u00f6r\u00fc Yunus Emre Bilgi, <em>\u201cBir \u00e7ok ekip ve ekipman b\u00f6lgeye kayd\u0131r\u0131larak ola\u011fan\u00fcst\u00fc \u00e7al\u0131\u015fmalarla \u015febeke yeniden faaliyete ge\u00e7irildi. Sinop\u2019a g\u00f6nderilen toplam jenerat\u00f6r say\u0131s\u0131 <strong>183<\/strong> adet. Ayn\u0131 zamanda <strong>3 adet<\/strong> mobil trafo, sel nedeniyle hasar g\u00f6ren <strong>trafo binalar\u0131<\/strong> yerine kullan\u0131lmak \u00fczere haz\u0131r bekletilmi\u015ftir.<strong> Ayanc\u0131k<\/strong> ve <strong>T\u00fcrkeli il\u00e7eleri<\/strong> \u015fehir merkezlerinde bulunan <strong>sokak ayd\u0131nlatma \u015febekesine<\/strong> enerji verilmi\u015ftir. Kurulan <strong>konteyner evler<\/strong> i\u00e7in de <strong>jenerat\u00f6r montaj\u0131<\/strong> yap\u0131l\u0131p tamam\u0131na enerji verilmektedir&#8221;<\/em> a\u00e7\u0131klamas\u0131nda bulundu.<\/p>\n<p>Da\u011f\u0131t\u0131m Direkt\u00f6r\u00fc Bilgi ayr\u0131ca, <em>&#8220;B\u00f6lgede meydana gelebilecek t\u00fcm enerji ihtiyac\u0131 ekiplerimizin yo\u011fun gayreti ile<strong> 7\/24<\/strong> esas\u0131na dayal\u0131 \u00e7al\u0131\u015f\u0131larak giderilmektedir. \u00c7al\u0131\u015fmalar\u0131m\u0131z <strong>felaket b\u00f6lgesinde<\/strong> t\u00fcm h\u0131z\u0131yla s\u00fcr\u00fcyor&#8221;<\/em> diye konu\u015ftu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sel felaketinin ya\u015fand\u0131\u011f\u0131 Sinop\u2019un Ayanc\u0131k \u0130l\u00e7esi&#8217;nde sefer olan YEDA\u015e ekipleri, sular alt\u0131nda kalan trafo merkezlerini onard\u0131 ve kurulan konteyner evlere enerji verildi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":141507,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[53114,96051,95108,96050,72105],"views":118,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141505"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=141505"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141505\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/141507"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=141505"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=141505"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=141505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}