{"id":141251,"date":"2021-08-30T13:46:13","date_gmt":"2021-08-30T10:46:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=141251"},"modified":"2021-08-30T13:46:13","modified_gmt":"2021-08-30T10:46:13","slug":"kuresel-jeotermal-enerji-talebinin-yuzde-11-5i-turkiye-den","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kuresel-jeotermal-enerji-talebinin-yuzde-11-5i-turkiye-den\/","title":{"rendered":"(Turkish) K\u00fcresel Jeotermal Enerji Talebinin % 11.5&#8217;i T\u00fcrkiye&#8217;den!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/141251\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye&#8217;de jeotermalden elektrik \u00fcretimi ilk olarak kamu yat\u0131r\u0131mlar\u0131yla 1975\u2019te ba\u015flarken, \u00f6zel sekt\u00f6r taraf\u0131ndan yap\u0131lan ilk santral 2006 y\u0131l\u0131nda devreye girerken jeotermal enerji kapasitesi 2006\u2019de 82 <strong>MW<\/strong>, 2007\u2019de 170 <strong>MW<\/strong>, 2013\u2019te<img loading=\"lazy\" class=\"alignright wp-image-141253\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/kuresel-jeotermal-enerji-talebinin-yuzde-11-5i-turkiye-den.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/kuresel-jeotermal-enerji-talebinin-yuzde-11-5i-turkiye-den.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/kuresel-jeotermal-enerji-talebinin-yuzde-11-5i-turkiye-den-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/kuresel-jeotermal-enerji-talebinin-yuzde-11-5i-turkiye-den-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/kuresel-jeotermal-enerji-talebinin-yuzde-11-5i-turkiye-den-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/> 311 <strong>MW<\/strong>, 2015\u2019te 624 <strong>MW<\/strong>, 2016\u2019da 821 <strong>MW<\/strong>, 2017\u2019de 1064 mw, 2018\u2019de 1282 <strong>MW<\/strong>, 2019\u2019da ise 1514 <strong>MW<\/strong> olarak ger\u00e7ekle\u015fti.<\/h2>\n<p>T\u00fcrkiye&#8217;nin jeotermal enerjide kurulu g\u00fcc\u00fc <strong>Temmuz 2021<\/strong> sonunda <strong>1650<\/strong> megavata, santral say\u0131s\u0131 ise <strong>63\u2019e<\/strong> y\u00fckseldi.<\/p>\n<p>Uluslararas\u0131 Yenilenebilir Enerji Ajans\u0131 verilerine g\u00f6re, T\u00fcrkiye <strong>2020 y\u0131l\u0131<\/strong> sonundaki <strong>1613 mw<\/strong> jeotermal enerji kapasitesiyle d\u00fcnyada <strong>4&#8217;\u00fcnc\u00fc<\/strong>, Avrupa\u2019da ise <strong>1&#8217;inci<\/strong> s\u0131rada yer ald\u0131. Ge\u00e7ti\u011fimiz y\u0131l sonu itibar\u0131yla <strong>14. 050<\/strong> <strong>MW<\/strong> olan k\u00fcresel jeotermal enerji kapasitesinin<strong> % 11,5<\/strong>\u2019i T\u00fcrkiye\u2019de yer al\u0131rken k\u00fcresel jeotermal kurulu g\u00fcc\u00fcnde ABD kurulu g\u00fcc\u00fc <strong>2.587 MW<\/strong> ilk s\u0131rada yer al\u0131rken onu, <strong>2.231 MW<\/strong>&#8216;la Endonezya ve <strong>1.928 MW<\/strong>&#8216;la Filipinler takip ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye&#8217;de jeotermalden elektrik \u00fcretimi ilk olarak kamu yat\u0131r\u0131mlar\u0131yla 1975\u2019te ba\u015flarken, \u00f6zel sekt\u00f6r taraf\u0131ndan yap\u0131lan ilk santral 2006 y\u0131l\u0131nda devreye girerken jeotermal enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":141253,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[95933,50389,95932,54979],"views":1435,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141251"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=141251"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/141251\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/141253"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=141251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=141251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=141251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}