{"id":140665,"date":"2021-08-19T16:02:35","date_gmt":"2021-08-19T13:02:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=140665"},"modified":"2021-08-19T16:02:35","modified_gmt":"2021-08-19T13:02:35","slug":"sinopun-tamamina-elektrik-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sinopun-tamamina-elektrik-verildi\/","title":{"rendered":"(Turkish) Sinop&#8217;un Tamam\u0131na Elektrik Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/140665\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Sinop\u2019ta ya\u015fanan sel afeti sonras\u0131 sular alt\u0131nda kalan trafo merkezleri Ye\u015fil\u0131rmak Elektrik Da\u011f\u0131t\u0131m \u015eirketi (YEDA\u015e) ekiplerinin yo\u011fun \u00e7al\u0131\u015fmas\u0131yla temizlenerek, ar\u0131za onar\u0131m-bak\u0131mlar\u0131 yap\u0131ld\u0131 ve Sinop\u2019un tamam\u0131na enerji verildi.<\/h2>\n<p>Sinop ili <strong>Ayanc\u0131k<\/strong> ve <strong>T\u00fcrkeli<\/strong> il\u00e7elerinde ya\u015fanan sel nedeniyle <strong>da\u011f\u0131t\u0131m \u015febekemizde<\/strong> ciddi hasarlar meydana gelmi\u015ftir. Afetin ya\u015fand\u0131\u011f\u0131 2^&#8217;inci G\u00fcn,<strong> Ayanc\u0131k<\/strong> ve <strong>T\u00fcrkeli il\u00e7eleri<\/strong>mizin \u015fehir merkezlerinin tamam\u0131 enerjilendirilmi\u015ftir. Bug\u00fcn itibariyle<strong> en \u00fccra k\u00f6\u015fede<\/strong> bulunan k\u00f6ylerimiz dahil <img loading=\"lazy\" class=\"alignright wp-image-140667\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/sinopun-tamamina-elektrik-verildi-2.jpg\" alt=\"\" width=\"320\" height=\"265\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/sinopun-tamamina-elektrik-verildi-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/sinopun-tamamina-elektrik-verildi-2-300x248.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/sinopun-tamamina-elektrik-verildi-2-484x400.jpg 484w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/sinopun-tamamina-elektrik-verildi-2-60x50.jpg 60w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/sinopun-tamamina-elektrik-verildi-2-500x414.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>k\u0131rsal kesimin tamam\u0131na<\/strong> enerji verilmi\u015ftir.<\/p>\n<h3><strong>\u2018EK\u0130PLER\u0130M\u0130Z B\u00dcY\u00dcK \u00d6ZVER\u0130 \u0130LE \u00c7ALI\u015eTI\u2019<\/strong><\/h3>\n<p>YEDA\u015e Genel M\u00fcd\u00fcr\u00fc <strong>Hasan Yasir Bora<\/strong>, ya\u015fanan afet sonras\u0131 b\u00f6lgedeki \u00e7al\u0131\u015fmalar hakk\u0131ndaki a\u00e7\u0131klamas\u0131nda <em>\u201c<strong>\u015eehir merkezlerine, sel sular\u0131n\u0131n \u00e7ekilmesi<\/strong> ile birlikte <strong>afetin 2&#8217;inci g\u00fcn\u00fc<\/strong> enerji vermi\u015ftik. Bug\u00fcn itibariyle t\u00fcm k\u00f6ylerimize de enerji vermi\u015f durumday\u0131z. Bu s\u00fcre zarf\u0131nda yakla\u015f\u0131k <strong>400 personel<\/strong> ve <strong>100 ara\u00e7l\u0131k<\/strong> ekibimiz,<strong> b\u00fcy\u00fck \u00f6zveri<\/strong> ile \u00e7al\u0131\u015fm\u0131\u015ft\u0131r. Karayolu ile ula\u015f\u0131m\u0131n m\u00fcmk\u00fcn olmad\u0131\u011f\u0131 <strong>k\u00f6ylerimize, malzeme<\/strong> ve <strong>ekip sevki<\/strong> i\u00e7in <strong>helikopterler<\/strong> kullan\u0131lm\u0131\u015ft\u0131r. <strong>Solunum cihaz\u0131na ba\u011fl\u0131<\/strong> ya\u015fam\u0131n\u0131 s\u00fcrd\u00fcren kritik kullan\u0131c\u0131lar\u0131m\u0131z i\u00e7in <strong>an\u0131nda jenerat\u00f6rler tesis edilmi\u015ftir<\/strong>. B\u00f6lgede yakla\u015f\u0131k <strong>200 adet<\/strong> jenerat\u00f6r bu ama\u00e7la kullan\u0131lm\u0131\u015ft\u0131r. Y\u0131k\u0131lan direkler, hasar g\u00f6ren k\u00f6pr\u00fcler \u00fczerinden insan g\u00fcc\u00fc ile \u00e7ekilerek nakledilmeye \u00e7al\u0131\u015f\u0131lm\u0131\u015ft\u0131r. T\u00fcm bu \u00e7al\u0131\u015fmalar esnas\u0131nda desteklerini esirgemeyen, Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131m\u0131z, \u0130\u00e7i\u015fleri Bakanl\u0131\u011f\u0131m\u0131z, Jandarma Genel Komutanl\u0131\u011f\u0131m\u0131z ile birlikte t\u00fcm kurumlar\u0131m\u0131za te\u015fekk\u00fcr ederiz \u201d<\/em> diye konu\u015ftu.<\/p>\n<p>Genel M\u00fcd\u00fcr Hasan Yasir Bora, selden etkilenen b\u00f6lge halk\u0131na ge\u00e7mi\u015f olsun dileklerini iletirken bir daha b\u00f6yle bir afetin ya\u015fanmamas\u0131 dile\u011finde bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sinop\u2019ta ya\u015fanan sel afeti sonras\u0131 sular alt\u0131nda kalan trafo merkezleri Ye\u015fil\u0131rmak Elektrik Da\u011f\u0131t\u0131m \u015eirketi (YEDA\u015e) ekiplerinin yo\u011fun \u00e7al\u0131\u015fmas\u0131yla temizlenerek, ar\u0131za onar\u0131m-bak\u0131mlar\u0131 yap\u0131ld\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":140668,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[95411,53114,95408,95409,95410],"views":140,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140665"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=140665"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140665\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/140668"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=140665"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=140665"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=140665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}