{"id":140650,"date":"2021-08-19T15:30:06","date_gmt":"2021-08-19T12:30:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=140650"},"modified":"2021-08-19T15:30:06","modified_gmt":"2021-08-19T12:30:06","slug":"yekdem-basvuru-suresi-1-ay-uzatildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yekdem-basvuru-suresi-1-ay-uzatildi\/","title":{"rendered":"(Turkish) YEKDEM Ba\u015fvuru S\u00fcresi 1 Ay Uzat\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/140650\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan Yenilenebilir Enerji Kaynaklar\u0131n\u0131 Destekleme Mekanizmas\u0131ndan (YEKDEM) faydalanacak lisansl\u0131 elektrik \u00fcretim santralleri i\u00e7in bir sonraki y\u0131la ili\u015fkin ba\u015fvuru s\u00fcresini 30 Kas\u0131m&#8217;a kadar uzat\u0131ld\u0131.<\/strong><\/h2>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-140652\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yekdem-basvuru-suresi-1-ay-uzatildi.jpg\" alt=\"\" width=\"320\" height=\"210\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yekdem-basvuru-suresi-1-ay-uzatildi.jpg 548w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yekdem-basvuru-suresi-1-ay-uzatildi-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yekdem-basvuru-suresi-1-ay-uzatildi-500x328.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yekdem-basvuru-suresi-1-ay-uzatildi-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Yenilenebilir Enerji Kaynaklar\u0131n\u0131n Elektrik Enerjisi \u00dcretimi Ama\u00e7l\u0131 Kullan\u0131m\u0131<\/strong>na \u0130li\u015fkin <strong>Kanun<\/strong> (YEK Kanunu) kapsam\u0131nda bir sonraki y\u0131l <strong>YEKDEM\u2019den faydalanmak<\/strong> isteyen yat\u0131r\u0131mc\u0131lar, her y\u0131l 31 Ekim tarihine kadar ba\u015fvuruda bulunabiliyor ve <strong>YEKDEM<\/strong>\u2019den faydalanabilecek <strong>lisansl\u0131 elektrik \u00fcretim tesisleri<\/strong>nin listesi <strong>30 Kas\u0131m itibar\u0131yla<\/strong> kamuoyuna ilan ediliyordu. Kurul karar\u0131yla, bir sonraki y\u0131la ait YEKDEM ba\u015fvurular\u0131nda son tarihi <strong>30 Kas\u0131m<\/strong>, YEKDEM\u2019den faydalanabilecek <strong>lisansl\u0131 elektrik \u00fcretim tesisleri<\/strong>nin nihai listesinin kamuoyuna duyurulma tarihi ise <strong>31 Aral\u0131k<\/strong> olacak \u015fekilde <strong>mevzuat de\u011fi\u015fikli\u011fine<\/strong> gidildi.<\/p>\n<p><strong>YEKDEM ba\u015fvurular\u0131<\/strong>n\u0131n son al\u0131nma tarihi bir ay \u00f6telenerek <strong>30 Kas\u0131m tarihine kadar<\/strong> i\u015fletmeye ge\u00e7ebilecek \u00fcretim tesislerine bir sonraki y\u0131l <strong>YEKDEM\u2019e kat\u0131lma hakk\u0131<\/strong> tan\u0131nd\u0131. Yetkililer, <strong>2022 y\u0131l\u0131 YEKDEM ba\u015fvurular\u0131<\/strong>n\u0131n gelecek aydan itibaren al\u0131nmaya ba\u015flanmas\u0131n\u0131n planland\u0131\u011f\u0131n\u0131 ifade etti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan Yenilenebilir Enerji Kaynaklar\u0131n\u0131 Destekleme Mekanizmas\u0131ndan (YEKDEM) faydalanacak lisansl\u0131 elektrik \u00fcretim santralleri i\u00e7in bir sonraki y\u0131la ili\u015fkin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":140652,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[95397,5070,71533,76979,54979,77735,27022,42316,95396],"views":133,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140650"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=140650"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140650\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/140652"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=140650"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=140650"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=140650"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}