{"id":140522,"date":"2021-08-18T10:57:09","date_gmt":"2021-08-18T07:57:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=140522"},"modified":"2021-08-18T10:57:09","modified_gmt":"2021-08-18T07:57:09","slug":"gunes-santrali-yatirimiyla-antalya-buyuksehir-belediyesinin-butcesine-katki","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-santrali-yatirimiyla-antalya-buyuksehir-belediyesinin-butcesine-katki\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Santrali Yat\u0131r\u0131m\u0131yla &#8216;Antalya B\u00fcy\u00fck\u015fehir Belediyesi&#8217;nin B\u00fct\u00e7esine Katk\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/140522\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Antalyal\u0131lara i\u00e7me suyu ve at\u0131ksu hizmetleri sunan Antalya Su ve At\u0131ksu \u0130daresi Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc (ASAT) <img loading=\"lazy\" class=\"alignright wp-image-140524\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/gunes-santrali-yatirimiyla-antalya-buyuksehir-belediyesinin-butcesine-katki-1.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/gunes-santrali-yatirimiyla-antalya-buyuksehir-belediyesinin-butcesine-katki-1.jpg 960w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/gunes-santrali-yatirimiyla-antalya-buyuksehir-belediyesinin-butcesine-katki-1-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/gunes-santrali-yatirimiyla-antalya-buyuksehir-belediyesinin-butcesine-katki-1-768x576.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/gunes-santrali-yatirimiyla-antalya-buyuksehir-belediyesinin-butcesine-katki-1-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/gunes-santrali-yatirimiyla-antalya-buyuksehir-belediyesinin-butcesine-katki-1-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>taraf\u0131ndan\u00a0en b\u00fcy\u00fck i\u015fletme gideri enerji maliyetlerinin d\u00fc\u015f\u00fcr\u00fclmesine y\u00f6nelik G\u00fcne\u015f Enerji Santralleri yat\u0131r\u0131mlar\u0131 yap\u0131l\u0131yor.<\/strong><\/h2>\n<p><strong>Bozova GES-1 \u2018G\u00fcne\u015f Enerjisi Santrali\u2019<\/strong> enerji \u00fcretimine ba\u015flad\u0131. Ayn\u0131 parsel \u00fczerine her biri 1 mw kurulu g\u00fcce sahip <strong>GES-2, GES-3 <\/strong>ve <strong>GES-4<\/strong> olmak \u00fczere <strong>ilaveten 3 yat\u0131r\u0131m<\/strong> daha\u00a0<strong>G\u00fcne\u015f Santrali<\/strong>\u00a0projelendirmeleri tamamlanarak ihale a\u015famas\u0131na geldi.<\/p>\n<p><strong>Bozova GES-1<\/strong>\u2019de bu y\u0131l\u0131n ilk <strong>6 ay\u0131<\/strong>nda <strong>1 milyon kilovat saatlik<\/strong> enerji\u00a0\u00fcretildi.\u00a0Yakla\u015f\u0131k <strong>600 konutun\u00a0<\/strong>y\u0131ll\u0131k enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layacak kapasitedeki tesisin sa\u011flayaca\u011f\u0131 y\u0131ll\u0131k ekonomik faydan\u0131n ise yakla\u015f\u0131k 2 milyon TL olaca\u011f\u0131 tahmin ediliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Antalyal\u0131lara i\u00e7me suyu ve at\u0131ksu hizmetleri sunan Antalya Su ve At\u0131ksu \u0130daresi Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc (ASAT) taraf\u0131ndan\u00a0en b\u00fcy\u00fck i\u015fletme gideri enerji maliyetlerinin d\u00fc\u015f\u00fcr\u00fclmesine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":140524,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[95295,95294,5070,73790,53157,54979],"views":191,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140522"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=140522"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140522\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/140524"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=140522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=140522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=140522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}