{"id":140320,"date":"2021-08-15T17:34:10","date_gmt":"2021-08-15T14:34:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=140320"},"modified":"2021-08-15T17:38:17","modified_gmt":"2021-08-15T14:38:17","slug":"yerka-elektrik-jes-sahasina-gunes-santrali-kuruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yerka-elektrik-jes-sahasina-gunes-santrali-kuruyor\/","title":{"rendered":"(Turkish) &#8217;Yerka Elektrik&#8217; JES Sahas\u0131na G\u00fcne\u015f Santrali Kuruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/140320\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Yerka Elektrik taraf\u0131ndan \u00c7anakkale \u0130li Ayvac\u0131k <img loading=\"lazy\" class=\"alignright wp-image-140322\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yerka-elektrik-jeotermal-santralinin-enerjisini-gunesten-karsilayacak.jpg\" alt=\"\" width=\"320\" height=\"202\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yerka-elektrik-jeotermal-santralinin-enerjisini-gunesten-karsilayacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yerka-elektrik-jeotermal-santralinin-enerjisini-gunesten-karsilayacak-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yerka-elektrik-jeotermal-santralinin-enerjisini-gunesten-karsilayacak-500x316.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/yerka-elektrik-jeotermal-santralinin-enerjisini-gunesten-karsilayacak-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u0130l\u00e7esi&#8217;nde i\u015fletilen 11,75 MW kurulu g\u00fcce sahip Jeotermal Enerji Santrali\u2019nin (JES) enerji ihtiyac\u0131 G\u00fcne\u015f Santrali (GES) kurularak elde edilecek.<\/h2>\n<p><strong>27,6 milyon lira<\/strong> yat\u0131r\u0131m bedeliyle g\u00fcne\u015f projesi yat\u0131r\u0131m\u0131<strong> JES sahas\u0131<\/strong>nda <strong>12,14 hektarl\u0131k<\/strong> alan \u00fczerine <strong>7,5 MW<\/strong> kurulu g\u00fc\u00e7 ile yap\u0131lacak.<\/p>\n<p>G\u00fcne\u015f santralinde <strong>18.300 adet<\/strong> g\u00fcne\u015f paneli kullan\u0131lacak olup<strong> 60 adet<\/strong> invert\u00f6r de yer alacak. \u00dcretilen enerjinin<strong> jeotermal santraline iletilebilmesi<\/strong> i\u00e7in ise <strong>2000 kVA 800V \/ 11,1-36kV<\/strong>\u2019l\u0131k <strong>4<\/strong> adet trafo kurulumu da yap\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yerka Elektrik taraf\u0131ndan \u00c7anakkale \u0130li Ayvac\u0131k \u0130l\u00e7esi&#8217;nde i\u015fletilen 11,75 MW kurulu g\u00fcce sahip Jeotermal Enerji Santrali\u2019nin (JES) enerji ihtiyac\u0131 G\u00fcne\u015f Santrali (GES) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":140322,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,48],"tags":[5070,35038,23416,16077,36184,95119],"views":1467,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140320"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=140320"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140320\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/140322"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=140320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=140320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=140320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}