{"id":14029,"date":"2013-08-15T09:19:52","date_gmt":"2013-08-15T06:19:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14029"},"modified":"2013-08-15T09:20:09","modified_gmt":"2013-08-15T06:20:09","slug":"nkd-elektrikten-tokata-hes-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nkd-elektrikten-tokata-hes-projesi\/","title":{"rendered":"(Turkish) NKD Elektrik\u2019ten Tokat\u2019a HES Projesi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14029\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>NKD Elektrik Enerji \u00dcretim A\u015e taraf\u0131ndan, Tokat`\u0131n Almus ve Re\u015fadiye il\u00e7e s\u0131n\u0131rlar\u0131 i\u00e7inde 7.2 MW kurulu g\u00fc\u00e7te bir hidroelektrik santrali kurulacak.<\/strong><\/p>\n<p>NKD Elektrik Enerji \u00dcretim A\u015e, Tokat \u0130li, Almus ve Re\u015fadiye \u0130l\u00e7eleri s\u0131n\u0131rlar\u0131 i\u00e7erisinde Ye\u015fil\u0131rmak \u00fczerinde kurmay\u0131 planlad\u0131\u011f\u0131 7.2 MW kurulu g\u00fcc\u00fcndeki \u00c7ilehane Reg\u00fclat\u00f6r\u00fc ve HES Projesi Proje i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) ba\u015fvurusunda bulundu. \u015eirket, Enerji Piyasas\u0131 D\u00fczenleme Kurumu\u2019na (EPDK) lisans ba\u015fvurusunu da yapt\u0131. \u00c7ED Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Proje i\u00e7in \u00c7ED s\u00fcrecini ba\u015flatt\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/nkd-elektrikten-tokata-hes-projesi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-14030\" title=\"nkd-elektrikten-tokata-hes-projesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/nkd-elektrikten-tokata-hes-projesi-300x194.jpg\" alt=\"\" width=\"300\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/nkd-elektrikten-tokata-hes-projesi-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/nkd-elektrikten-tokata-hes-projesi-500x323.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/nkd-elektrikten-tokata-hes-projesi-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/nkd-elektrikten-tokata-hes-projesi.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><strong>23.5 M\u0130LYON TL\u2019L\u0130K YATIRIM<\/strong><br \/>\nProje\u2019nin yakla\u015f\u0131k yat\u0131r\u0131m maliyeti, 23,5 milyon TL olarak belirlendi. \u00c7ilehane Reg\u00fclat\u00f6r\u00fc ve HES projesinde, 2,28 GWh\/y\u0131l firm, 19,72 GWh\/y\u0131l seconder olmak \u00fczere toplam 22,00 GWh\/y\u0131l enerji \u00fcretecek.<\/p>\n<p><strong>PROJE\u2019N\u0130N \u00d6ZELL\u0130KLER\u0130<\/strong><br \/>\nHES\u2019in Reg\u00fclat\u00f6r yerinde talveg kotu 879 m\u2019dir. Reg\u00fclat\u00f6r dolu g\u00f6vdeli olup sa\u011f sahilinde \u00e7ak\u0131l ge\u00e7idi ve su alma yap\u0131s\u0131 var. Toplam beton g\u00f6vde uzunlu\u011fu 44,00 metre. Reg\u00fclat\u00f6r\u00fcn kret kotu 882 metre.<\/p>\n<p><strong>T\u0130P II D\u00dc\u015e\u00dc HAVUZU<\/strong><br \/>\nDolusavak \u00fczerinde ta\u015fk\u0131nda 2 metre y\u00fcksekli\u011finde su y\u00fck\u00fc olacak \u015fekilde kret uzunlu\u011fu belirlendi. D\u00fc\u015f\u00fc havuzu giri\u015findeki su h\u0131z\u0131 15 m\/s den k\u00fc\u00e7\u00fck ve Frut say\u0131s\u0131 4.5\u2019dan b\u00fcy\u00fck oldu\u011fundan, d\u00fc\u015f\u00fc havuzu Tip II olarak belirlendi. D\u00fc\u015f\u00fc havuzu uzunlu\u011fu ise 10 metre.<\/p>\n<p><strong>ALMUS TRAFO MERKEZ\u0130`NE BA\u011eLANACAK<\/strong><br \/>\n\u00dcretilecek enerji 34,5 kV\u2019luk enerji nakil hatt\u0131 ile Almus Trafo merkezine ba\u011flanacak. Burada, b\u00f6lgedeki di\u011fer HES\u2019ler ile ortak bir enerji nakil hatt\u0131 planlan\u0131yor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/nkd-elektrikten-tokata-hes-projesi_4578.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.NKD Elektrik Enerji \u00dcretim A\u015e taraf\u0131ndan, Tokat`\u0131n Almus ve Re\u015fadiye il\u00e7e s\u0131n\u0131rlar\u0131 i\u00e7inde 7.2 MW kurulu g\u00fc\u00e7te bir hidroelektrik santrali kurulacak. NKD Elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14030,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2878,4275,63,67,165,18,35370,1090,7614],"views":2252,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14029"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14029"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14029\/revisions"}],"predecessor-version":[{"id":14032,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14029\/revisions\/14032"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14030"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}