{"id":140162,"date":"2021-08-12T11:56:19","date_gmt":"2021-08-12T08:56:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=140162"},"modified":"2021-08-12T11:56:19","modified_gmt":"2021-08-12T08:56:19","slug":"akkuyu-ngs-nin-4-uncu-unitesinin-temel-cukuru-kazma-calismalari-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-4-uncu-unitesinin-temel-cukuru-kazma-calismalari-basladi\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;nin 4&#8217;\u00fcnc\u00fc \u00dcnitesinin Temel \u00c7ukuru Kazma \u00c7al\u0131\u015fmalar\u0131 Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/140162\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali (NGS) olan Akkuyu NGS sahas\u0131nda 4. \u00dcnite\u2019nin in\u015fas\u0131 i\u00e7in haz\u0131rl\u0131klara ba\u015fland\u0131. \u00c7al\u0131\u015fmalar, T\u00fcrkiye Cumhuriyeti N\u00fckleer D\u00fczenleme Kurumu\u2019nun 30 Haziran 2021\u2019de verdi\u011fi S\u0131n\u0131rl\u0131 \u00c7al\u0131\u015fma \u0130zni uyar\u0131nca y\u00fcr\u00fct\u00fcl\u00fcyor.<\/strong><\/h2>\n<p><strong>4. \u00dcnite<\/strong>\u2019nin <strong>reakt\u00f6r binas\u0131 in\u015fas\u0131<\/strong>,<strong> t\u00fcrbin binas\u0131, yard\u0131mc\u0131 reakt\u00f6r binas\u0131<\/strong> ve di\u011fer ana tesislerinin in\u015fas\u0131 i\u00e7in ba\u015flayan \u00e7ukur kazma \u00e7al\u0131\u015fmalar\u0131, <strong>655 m<sup>2<\/sup><\/strong>\u2019lik bir alan \u00fczerinde yap\u0131l\u0131yor. En al\u00e7ak noktada \u00e7ukur derinli\u011fi yakla\u015f\u0131k<strong> 12,5 metre<\/strong> olacak. \u0130\u015f\u00e7ilerin toplamda yakla\u015f\u0131k <strong>600 bin metrek\u00fcp<\/strong> topra\u011f\u0131 ta\u015f\u0131mas\u0131 bekleniyor. <strong>\u00c7ukur kazma \u00e7al\u0131\u015fmalar\u0131, kayal\u0131k zeminin <img loading=\"lazy\" class=\"alignright wp-image-140164\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akkuyu-ngs-nin-4-uncu-unitesinin-temel-cukuru-kazma-calismalari-basladi.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akkuyu-ngs-nin-4-uncu-unitesinin-temel-cukuru-kazma-calismalari-basladi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akkuyu-ngs-nin-4-uncu-unitesinin-temel-cukuru-kazma-calismalari-basladi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akkuyu-ngs-nin-4-uncu-unitesinin-temel-cukuru-kazma-calismalari-basladi-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akkuyu-ngs-nin-4-uncu-unitesinin-temel-cukuru-kazma-calismalari-basladi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akkuyu-ngs-nin-4-uncu-unitesinin-temel-cukuru-kazma-calismalari-basladi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ar\u0131nd\u0131r\u0131lmas\u0131<\/strong> ve kaz\u0131lmas\u0131n\u0131n yan\u0131 s\u0131ra <strong>drenaj kurulumunu da<\/strong> kaps\u0131yor. <strong>4. \u00dcnite in\u015faat alan\u0131<\/strong>nda halihaz\u0131rda <strong>ekskavat\u00f6rler, damperli kamyonlar, sondaj makineleri<\/strong> gibi 20\u2019nin \u00fczerinde <strong>i\u015f makinesi<\/strong> bulunuyor.<\/p>\n<p><strong>AKKUYU N\u00dcKLEER A.\u015e.<\/strong> Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc <strong>Sergei Butckikh<\/strong> konuya ili\u015fkin olarak <span style=\"text-decoration: underline;\">yapt\u0131\u011f\u0131 a\u00e7\u0131klamada<\/span>,<em> \u201cBu y\u0131l, <strong>4. \u00dcnite<\/strong> i\u00e7in<strong> in\u015faat lisans\u0131 almay\u0131<\/strong> ve \u00f6n\u00fcm\u00fczdeki y\u0131l\u0131n ba\u015flar\u0131nda \u00fcnitede <strong>tam \u00f6l\u00e7ekli in\u015faat \u00e7al\u0131\u015fmalar\u0131<\/strong>na ba\u015flamay\u0131 umuyoruz. Y\u0131lsonuna kadar <strong>reakt\u00f6r<\/strong> ve <strong>t\u00fcrbin binalar\u0131n\u0131n<\/strong> temel plakalar\u0131 i\u00e7in <strong>beton d\u00f6kme i\u015flemine<\/strong> ba\u015flanacak, ard\u0131ndan plakalar g\u00fc\u00e7lendirilecek. B\u00f6ylelikle <strong>Akkuyu NGS<\/strong>, ayn\u0131 anda <strong>d\u00f6rt g\u00fc\u00e7 \u00fcnitesi<\/strong>nin in\u015fa edilece\u011fi d\u00fcnyan\u0131n en b\u00fcy\u00fck n\u00fckleer in\u015faat merkezi olacak. Bu, d\u00fcnya n\u00fckleer sanayi tarihinde benzeri olmayan bir durum. NGS&#8217;nin d\u00f6rt g\u00fc\u00e7 \u00fcnitesinin <strong>e\u015fzamanl\u0131 in\u015fas\u0131<\/strong>, <strong>y\u00fcksek kaynak konsantrasyonu<\/strong> gerektirecek ancak bunun i\u00e7in tamamen haz\u0131r\u0131z\u201d<\/em> dedi.<\/p>\n<p><strong>\u00c7ukur kazma s\u00fcreci<\/strong> kapsam\u0131nda, <strong>zemin iyile\u015ftirme \u00e7al\u0131\u015fmalar\u0131<\/strong> da yap\u0131l\u0131yor. Bu kapsamda, masife su-\u00e7imento kar\u0131\u015f\u0131m\u0131 pompalan\u0131yor ve baz\u0131 alanlarda <strong>jet grouting y\u00f6ntemi<\/strong> kullan\u0131l\u0131yor. Y\u00fcksek bas\u0131n\u00e7 alt\u0131nda<strong> topra\u011fa \u00e7imento harc\u0131 pompalan\u0131yor<\/strong>, bunun sonucunda da topra\u011f\u0131n istenen ta\u015f\u0131ma kapasitesine ula\u015fmas\u0131 sa\u011flan\u0131yor. B\u00f6ylelikle in\u015fa edilen binalar\u0131n ve yap\u0131lar\u0131n uluslararas\u0131 standartlarda <strong>g\u00fcvenli<\/strong> ve <strong>sa\u011flam<\/strong> olmas\u0131n\u0131 sa\u011flayan masif y\u0131\u011f\u0131n\u0131 olu\u015fuyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali (NGS) olan Akkuyu NGS sahas\u0131nda 4. \u00dcnite\u2019nin in\u015fas\u0131 i\u00e7in haz\u0131rl\u0131klara ba\u015fland\u0131. \u00c7al\u0131\u015fmalar, T\u00fcrkiye Cumhuriyeti N\u00fckleer D\u00fczenleme Kurumu\u2019nun [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":140164,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[42302,52259,53348,65416,36327,94960],"views":367,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140162"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=140162"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/140162\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/140164"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=140162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=140162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=140162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}