{"id":139917,"date":"2021-08-08T13:48:18","date_gmt":"2021-08-08T10:48:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=139917"},"modified":"2021-08-08T13:57:31","modified_gmt":"2021-08-08T10:57:31","slug":"asagi-kalekoy-hes-gunes-santrali-yatirimi-ile-hibrite-donustu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asagi-kalekoy-hes-gunes-santrali-yatirimi-ile-hibrite-donustu\/","title":{"rendered":"&#8217;Asagi Kalek\u00f6y HEPP&#8217; Transformed into Hybrid with Solar Power Plant"},"content":{"rendered":"<p><\/p>\n<h2><strong>The Lower Kalek\u00f6y Dam and hydroelectric power plant (HES) in Bing\u00f6l, with an installed power of 510 MW, turned<img loading=\"lazy\" class=\"alignright wp-image-139919\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/asagi-kalekoy-hes-gunes-ile-hibrit-santrale-donustu.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/asagi-kalekoy-hes-gunes-ile-hibrit-santrale-donustu.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/asagi-kalekoy-hes-gunes-ile-hibrit-santrale-donustu-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/asagi-kalekoy-hes-gunes-ile-hibrit-santrale-donustu-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/asagi-kalekoy-hes-gunes-ile-hibrit-santrale-donustu-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/asagi-kalekoy-hes-gunes-ile-hibrit-santrale-donustu-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/> into a hybrid with the investment of a solar power plant.<\/strong><\/h2>\n<p>Cengiz Holding Energy Group President Ahmet Cengiz stated that the power plant has the title of the first hybrid power plant in Turkey and the second largest in the world with the GES installed on the A\u015fa\u011f\u0131 Kalek\u00f6y HEPP site, while with the additional 80 mW GES power plant project consisting of 200 thousand solar panels. A\u015fa\u011f\u0131 Kalek\u00f6y HEPP has become a hybrid power plant with a total capacity of 590 MW.<\/p>\n<p>In addition, Cengiz said, \u201cAs a group, we will focus on renewable energy sources in the coming period. In the short term, we want to increase the number of hybrid power plants.\u201d said.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Lower Kalek\u00f6y Dam and hydroelectric power plant (HES) in Bing\u00f6l, with an installed power of 510 MW, turned into a hybrid with the investment of a solar power plant. Cengiz Holding Energy Group President Ahmet Cengiz stated that the power plant has the title of the first hybrid power plant in Turkey and the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":139919,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,47],"tags":[94729,94730,94731,94727,88385,94090,66250,8733,91427,26043,23720,58435,68968,94091,94732,94092,94733,94728,46587,54979],"views":1138,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139917"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=139917"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139917\/revisions"}],"predecessor-version":[{"id":139928,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139917\/revisions\/139928"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/139919"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=139917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=139917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=139917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}