{"id":139894,"date":"2021-08-08T12:48:22","date_gmt":"2021-08-08T09:48:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=139894"},"modified":"2021-08-08T12:51:54","modified_gmt":"2021-08-08T09:51:54","slug":"balikesir-deki-cop-gaz-tesisinin-2-yeni-motor-unitesinin-kismi-kabulu-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/balikesir-deki-cop-gaz-tesisinin-2-yeni-motor-unitesinin-kismi-kabulu-yapildi\/","title":{"rendered":"(Turkish) Bal\u0131kesir&#8217;deki \u00c7\u00f6p Gaz Tesisinin 2 Yeni Motor \u00dcnitesi K\u0131smi Kabul\u00fc Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/139894\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Biotrend A.\u015e.\u2019ye ait Bal\u0131kesir \u00c7\u00f6p Gaz Elektrik \u00dcretim Tesisinin 2 yeni motor \u00fcnitesine y\u00f6nelik k\u0131smi kabul\u00fc <img loading=\"lazy\" class=\"alignright wp-image-139898\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/balikesir-deki-cop-gaz-tesisinin-2-yeni-motor-unitesinin-kismi-kabulu-yapildi.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/balikesir-deki-cop-gaz-tesisinin-2-yeni-motor-unitesinin-kismi-kabulu-yapildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/balikesir-deki-cop-gaz-tesisinin-2-yeni-motor-unitesinin-kismi-kabulu-yapildi-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/balikesir-deki-cop-gaz-tesisinin-2-yeni-motor-unitesinin-kismi-kabulu-yapildi-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/balikesir-deki-cop-gaz-tesisinin-2-yeni-motor-unitesinin-kismi-kabulu-yapildi-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yap\u0131ld\u0131.<\/strong><\/h2>\n<p><strong>Biotrend \u00c7evre ve Enerji Yat\u0131r\u0131mlar\u0131 A.\u015e.<\/strong>\u2019nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 <strong>Landfill Enerji Sanayi Ticaret A\u015e<\/strong>&#8216;nin i\u015fletmecisi oldu\u011fu <strong>Bal\u0131kesir \u00c7\u00f6p Gaz Elektrik \u00dcretim Tesisi<\/strong>ne <strong>2 adet motor \u00fcnitesi<\/strong> ilavesine y\u00f6nelik <strong>k\u0131smi kabul i\u015flemi<\/strong> tamamland\u0131.<\/p>\n<p><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 <\/strong>taraf\u0131ndan\u00a0<strong>31 Temmuz 2021<\/strong>&#8216;de verilen onay sonras\u0131 yap\u0131lan k\u0131smi kabul i\u015flemiyle birlikte<em> tesiste faal durumdaki<\/em><strong> 6 adet<\/strong> motor \u00fcnitesine<strong> 2 yeni motor<\/strong> \u00fcnitesi daha ilave edildi. B\u00f6ylece <strong>Bal\u0131kesir \u00c7\u00f6p Gaz<\/strong>\u2019\u0131n <strong>8,484 MWe<\/strong> olan <em>kurulu g\u00fc\u00e7 kapasitesi<\/em>, <strong>8 adet<\/strong> motor \u00fcnitesi ile birlikte\u00a0<strong>11,312 MWe<\/strong> seviyesine \u00e7\u0131km\u0131\u015f oldu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Biotrend A.\u015e.\u2019ye ait Bal\u0131kesir \u00c7\u00f6p Gaz Elektrik \u00dcretim Tesisinin 2 yeni motor \u00fcnitesine y\u00f6nelik k\u0131smi kabul\u00fc yap\u0131ld\u0131. Biotrend \u00c7evre ve Enerji Yat\u0131r\u0131mlar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":139898,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[94714,94712,94715,94713,56965,5070,52259],"views":967,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139894"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=139894"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139894\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/139898"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=139894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=139894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=139894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}