{"id":139873,"date":"2021-08-07T16:55:40","date_gmt":"2021-08-07T13:55:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=139873"},"modified":"2021-08-07T16:55:53","modified_gmt":"2021-08-07T13:55:53","slug":"akyel-1-res-gunes-enerjisi-ile-hibrit-santrale-donusuyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akyel-1-res-gunes-enerjisi-ile-hibrit-santrale-donusuyor\/","title":{"rendered":"(Turkish) &#8217;Akyel 1 RES&#8217; G\u00fcne\u015f Enerjisi ile Hibrit Santrale D\u00f6n\u00fc\u015f\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/139873\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Karaman\u2019da yer alan &#8216;Akyel 1 r\u00fczgar enerji santrali&#8217; 40 MW\u2019l\u0131k g\u00fcne\u015f enerji santrali yat\u0131r\u0131m\u0131yla hibrit santrale d\u00f6n\u00fc\u015fecek.<img loading=\"lazy\" class=\"alignright wp-image-139877\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akyel-1-res-gunes-enerjisi-ile-hibrit-santrale-donusuyor.jpg\" alt=\"\" width=\"320\" height=\"209\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akyel-1-res-gunes-enerjisi-ile-hibrit-santrale-donusuyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akyel-1-res-gunes-enerjisi-ile-hibrit-santrale-donusuyor-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akyel-1-res-gunes-enerjisi-ile-hibrit-santrale-donusuyor-500x326.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/08\/akyel-1-res-gunes-enerjisi-ile-hibrit-santrale-donusuyor-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h2>\n<p><strong>Sanko Enerji<\/strong>&#8216;ye ait olan <strong>Mersin<\/strong> ili <strong>Mut<\/strong> il\u00e7esinde <strong>174 hektarl\u0131k<\/strong> alan \u00fczerinde <strong>40 MWe<\/strong> kurulu g\u00fcce sahip <strong>\u201cAkyel 1 R\u00fczgar Enerji Santraline Yard\u0131mc\u0131 G\u00fcne\u015f Enerjisi Santrali\u201d<\/strong> kurularak i\u015fletilecek olup<strong> projenin yat\u0131r\u0131m bedeli<\/strong> ise tahmini olarak <strong>179 milyon lira<\/strong> civar\u0131ndad\u0131r.<\/p>\n<p>Proje ile kurulu\u015fun\u00a0<strong>40 MW<\/strong> kapasiteli <strong>Akyel 1 R\u00fczgar Enerji Santrali<\/strong>\u2019nin <strong>yetersiz<\/strong> veya <strong>verimsiz<\/strong> oldu\u011fu zaman dilimlerinde kurulacak olan g\u00fcne\u015f enerji santralinden yararlan\u0131lacak.<\/p>\n<p>G\u00fcne\u015f santralinde <em>tek eksene sahip<\/em><strong>\u00a0g\u00fcne\u015f takip sistemine sahip fotovoltaik g\u00fcne\u015f paneli teknolojisi<\/strong> yer alacak olup <strong>445 Wp<\/strong> g\u00fcce sahip toplam da\u00a0<strong>89.882<\/strong> adet <strong>monokristal g\u00fcne\u015f paneli<\/strong> kullan\u0131lacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Karaman\u2019da yer alan &#8216;Akyel 1 r\u00fczgar enerji santrali&#8217; 40 MW\u2019l\u0131k g\u00fcne\u015f enerji santrali yat\u0131r\u0131m\u0131yla hibrit santrale d\u00f6n\u00fc\u015fecek. Sanko Enerji&#8216;ye ait olan Mersin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":139877,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[94684,85116,53157,35349,93218,48769,53282,83557],"views":476,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139873"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=139873"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139873\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/139877"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=139873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=139873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=139873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}