{"id":139057,"date":"2021-07-25T09:21:41","date_gmt":"2021-07-25T06:21:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=139057"},"modified":"2021-07-25T09:23:57","modified_gmt":"2021-07-25T06:23:57","slug":"birlesik-krallik-net-sifir-hedefi-icin-gunes-kapasitesini-3-katina-cikartmali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/birlesik-krallik-net-sifir-hedefi-icin-gunes-kapasitesini-3-katina-cikartmali\/","title":{"rendered":"&#8217;UK&#8217;s Solar Sector Will Double by 2030 But to Hit Net Zero it Needs to Triple"},"content":{"rendered":"<p><strong>The\u00a0UK\u2019s solar sector\u00a0will double in size by 2030 \u2013 but to hit net zero it needs to triple, warns Solar Energy UK. The industry body claims 40GW of solar capacity must be in place by 2030 if the UK is to remain on target to reach net zero by 2050, as set out in its national climate commitments.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-139060\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/birlesik-krallik-net-sifir-hedefi-icin-gunes-kapasitesini-3-katina-cikartmali.jpg\" alt=\"\" width=\"320\" height=\"183\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/birlesik-krallik-net-sifir-hedefi-icin-gunes-kapasitesini-3-katina-cikartmali.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/birlesik-krallik-net-sifir-hedefi-icin-gunes-kapasitesini-3-katina-cikartmali-300x172.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/birlesik-krallik-net-sifir-hedefi-icin-gunes-kapasitesini-3-katina-cikartmali-500x286.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/birlesik-krallik-net-sifir-hedefi-icin-gunes-kapasitesini-3-katina-cikartmali-80x46.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>In a new report, <strong>Solar Energy UK<\/strong> predicts such a scaling up of capacity could create <strong>13,000 new jobs<\/strong> across the sector and drive <strong>\u00a317 billion of additional economic activity<\/strong>, while simultaneously cutting national carbon emissions by <strong>21.2 million tonnes per year<\/strong>, or around <strong>4.7%.<\/strong><\/p>\n<p>The report states: \u201cWith less than six months to go until <strong>COP26<\/strong> pressure is <strong>growing on the Government to show leadership<\/strong> on\u00a0<strong>solar\u00a0<\/strong>and other<strong> onshore renewables<\/strong>, as it has done for offshore wind.\u201d<\/p>\n<p>Noting that <strong>business-as-usual scenarios<\/strong> will not delive<strong>r the capacity growth<\/strong> required, the industry body urges the government to implement <strong>a wealth of policy<\/strong> and <strong>regulatory changes to maximise<\/strong> the sector\u2019s potential and <strong>increase ambition across<\/strong> the <strong>residential, commercial<\/strong>, and <strong>utility-scale markets.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>The\u00a0UK\u2019s solar sector\u00a0will double in size by 2030 \u2013 but to hit net zero it needs to triple, warns Solar Energy UK. The industry body claims 40GW of solar capacity must be in place by 2030 if the UK is to remain on target to reach net zero by 2050, as set out in its [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":139060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[42490,5070,66267,52259,93966,28399,53157,93964,93962,70558,93961,93965,93963,93960,66269,57125,66276],"views":225,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139057"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=139057"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139057\/revisions"}],"predecessor-version":[{"id":139062,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/139057\/revisions\/139062"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/139060"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=139057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=139057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=139057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}