{"id":138869,"date":"2021-07-20T16:49:37","date_gmt":"2021-07-20T13:49:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=138869"},"modified":"2021-07-20T16:49:37","modified_gmt":"2021-07-20T13:49:37","slug":"karen-izmirde-20-mw-jes-ile-birlikte-5-mwlik-ges-ve-res-kurarak-isletecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karen-izmirde-20-mw-jes-ile-birlikte-5-mwlik-ges-ve-res-kurarak-isletecek\/","title":{"rendered":"(Turkish) Karen \u0130zmir&#8217;de 20 MW JES ile Birlikte 5 MW\u2019l\u0131k GES ve RES Kurarak \u0130\u015fletecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/138869\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Karen Kahramanmara\u015f Elektrik taraf\u0131ndan \u0130zmir\u2019in Seferihisar il\u00e7esinde 20 MW\u2019l\u0131k <img loading=\"lazy\" class=\"alignright wp-image-138872\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/karen-izmirde-20-mw-jes-ile-birlikte-5-mwlik-ges-ve-res-kurarak-isletecek.jpg\" alt=\"\" width=\"320\" height=\"207\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/karen-izmirde-20-mw-jes-ile-birlikte-5-mwlik-ges-ve-res-kurarak-isletecek.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/karen-izmirde-20-mw-jes-ile-birlikte-5-mwlik-ges-ve-res-kurarak-isletecek-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/karen-izmirde-20-mw-jes-ile-birlikte-5-mwlik-ges-ve-res-kurarak-isletecek-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Karen JES ve onun elektrik ihtiyac\u0131na y\u00f6nelik 5 MW\u2019l\u0131k birer GES ve RES kurularak i\u015fletilecek.<\/strong><\/p>\n<p>Projenin yat\u0131r\u0131m bedeli <strong>300 milyon lira<\/strong> olurken proje \u00e7er\u00e7evesinde 20 MW kurulu g\u00fcce sahip jeotermal santralinin<strong> in\u015fas\u0131 <\/strong>ve<strong> i\u015fletilmesi, santrale hizmet<\/strong> edecek \u00fcretim ve <strong>reenjeksiyon kuyular\u0131<\/strong>n\u0131n a\u00e7\u0131lmas\u0131 ve i\u015fletilecektir. \u0130laveten, JES&#8217;in<strong> i\u00e7 t\u00fcketim kayb\u0131n\u0131n kar\u015f\u0131lanmas\u0131<\/strong> i\u00e7in ise <strong>5 MW <\/strong>kapasiteli <strong>GES<\/strong> ve <strong>RES<\/strong> kurulacak.<\/p>\n<p><strong>Temiz enerji yat\u0131r\u0131m\u0131n\u0131n<\/strong> hayata ge\u00e7irilmesiyle birlikte y\u0131lda yakla\u015f\u0131k <strong>140,2 GWh<\/strong> enerji \u00fcretimi ger\u00e7ekle\u015fecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Karen Kahramanmara\u015f Elektrik taraf\u0131ndan \u0130zmir\u2019in Seferihisar il\u00e7esinde 20 MW\u2019l\u0131k Karen JES ve onun elektrik ihtiyac\u0131na y\u00f6nelik 5 MW\u2019l\u0131k birer GES ve RES kurularak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":138872,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[2326,35038,93713,46016,5410,93715,2689,76929,36848,36184,93712,93711,474,35002,49249,25567,93714],"views":1458,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138869"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=138869"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138869\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/138872"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=138869"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=138869"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=138869"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}