{"id":138818,"date":"2021-07-20T13:56:57","date_gmt":"2021-07-20T10:56:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=138818"},"modified":"2021-07-20T14:17:06","modified_gmt":"2021-07-20T11:17:06","slug":"solar-3-gw-den-gunesin-etkin-gelisimi-icin-is-modeli-onerileri","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/solar-3-gw-den-gunesin-etkin-gelisimi-icin-is-modeli-onerileri\/","title":{"rendered":"Business Model Proposals for the Effective Development of from &#8216;Solar 3 GW&#8217;&#8230;"},"content":{"rendered":"<p><strong>While &#8216;Solar 3 GW&#8217; continues to offer business model proposals for the healthy and consistent development of the solar energy sector, these business models are; improved self-consumption model, PPP model and licensed model without tender, incentive. All 3 models have features that can be put forward in parallel with electricity demand and are compatible with free market dynamics.<\/strong><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter size-full wp-image-138820\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/solar-3-gw-den-gunesin-etkin-gelisimi-icin-is-modeli-onerileri.jpg\" alt=\"\" width=\"550\" height=\"312\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/solar-3-gw-den-gunesin-etkin-gelisimi-icin-is-modeli-onerileri.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/solar-3-gw-den-gunesin-etkin-gelisimi-icin-is-modeli-onerileri-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/solar-3-gw-den-gunesin-etkin-gelisimi-icin-is-modeli-onerileri-500x284.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/solar-3-gw-den-gunesin-etkin-gelisimi-icin-is-modeli-onerileri-80x45.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p>All 3 models proposed by Solar3GW are fully compatible with our country&#8217;s policy aiming to increase the use of domestic and clean energy resources. In the fight against climate change, it will enable solar energy to be activated very effectively and quickly.<\/p>\n<p>With these models, which can operate without the need for any incentive within the framework of free market dynamics, the electricity market of our country will develop in a way that will meet the needs of the age.<\/p>","protected":false},"excerpt":{"rendered":"<p>While &#8216;Solar 3 GW&#8217; continues to offer business model proposals for the healthy and consistent development of the solar energy sector, these business models are; improved self-consumption model, PPP model and licensed model without tender, incentive. All 3 models have features that can be put forward in parallel with electricity demand and are compatible with [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":138822,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[66250,46609,79148,52259,93651,53157,93641,93645,10921,93648,93639,93649,93646,93643,93653,91736,93650,93644,51211,85888,93652,54979,93642,93647,93654,93640],"views":271,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138818"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=138818"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138818\/revisions"}],"predecessor-version":[{"id":138825,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138818\/revisions\/138825"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/138822"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=138818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=138818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=138818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}