{"id":138729,"date":"2021-07-19T11:23:41","date_gmt":"2021-07-19T08:23:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=138729"},"modified":"2021-07-19T11:44:00","modified_gmt":"2021-07-19T08:44:00","slug":"baskent-osb-nin-en-buyuk-endustriyel-cati-ges-projesi-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/baskent-osb-nin-en-buyuk-endustriyel-cati-ges-projesi-devreye-alindi\/","title":{"rendered":"(Turkish) &#8217;Ba\u015fkent OSB&#8217;nin En B\u00fcy\u00fck End\u00fcstriyel \u00c7at\u0131 Ges Projesi Devreye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/138729\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7at\u0131 \u00fczeri g\u00fcne\u015f enerjisi sistemleri alan\u0131nda engin uluslararas\u0131 tecr\u00fcbeye sahip ve merkezi Ankara\u2019da bulunan ASUNIM T\u00fcrkiye, Ba\u015fkent Organize Sanayi B\u00f6lgesi\u2019nde bulunan An\u0131l Ambalaj ve Ka\u011f\u0131t\u00e7\u0131l\u0131k A.\u015e.\u2019nin fabrika \u00e7at\u0131s\u0131 \u00fczerine kurdu\u011fu 2.04MWp g\u00fcc\u00fcndeki santrali ba\u015far\u0131yla tamamlayarak \u00a0yeni bir ilke daha imza att\u0131.<\/strong><\/p>\n<p>Ba\u015fkent Organize Sanayi B\u00f6lgesi\u2019nin en b\u00fcy\u00fck <strong>end\u00fcstriyel \u00e7at\u0131 \u00fczeri GES<\/strong>\u2019i olan projede;<em> t\u00fcm projelendirme ve m\u00fchendislik hizmetleri, g\u00f6lge analizleri, \u00fcretim sim\u00fclasyonlar\u0131, optimizasyonlar<\/em> Avrupa\u2019daki m\u00fchendislik departman\u0131 taraf\u0131ndan en g\u00fcncel teknikler ve ASUNIM\u2019e \u00f6zel yaz\u0131l\u0131mlar <img loading=\"lazy\" class=\"alignright wp-image-138731\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/baskent-osb-nin-en-buyuk-endustriyel-cati-ges-projesi-devreye-alindi.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/baskent-osb-nin-en-buyuk-endustriyel-cati-ges-projesi-devreye-alindi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/baskent-osb-nin-en-buyuk-endustriyel-cati-ges-projesi-devreye-alindi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/baskent-osb-nin-en-buyuk-endustriyel-cati-ges-projesi-devreye-alindi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/baskent-osb-nin-en-buyuk-endustriyel-cati-ges-projesi-devreye-alindi-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kullan\u0131larak hayata ge\u00e7irildi.<\/p>\n<p>Sistemin, maksimum performansta <strong>elektrik \u00fcretmesi<\/strong> i\u00e7in <strong>paneller ak\u0131m s\u0131n\u0131flar\u0131na<\/strong> g\u00f6re s\u0131raland\u0131. Yine sistemde, g\u00fcne\u015flenmeden daha fazla yararlanmak i\u00e7in <strong>\u00e7ift y\u00f6nl\u00fc panel montaj\u0131<\/strong> yap\u0131ld\u0131. <strong>2.04MWp<\/strong> kurulu g\u00fcce sahip olan sistem, y\u0131ll\u0131k <strong>2.734.000,00 kWh<\/strong> elektrik \u00fcreterek fabrikan\u0131n elektrik ihtiyac\u0131n\u0131n <strong>% 83<\/strong>\u2019\u00fcn\u00fc kar\u015f\u0131layacak ve d\u00fcnya markalar\u0131 i\u00e7in ihra\u00e7 edilen kutu ve ambalajlar <strong>temiz enerji<\/strong> ile \u00fcretilmi\u015f olacak.<\/p>\n<p><strong>Yeni lisanss\u0131z elektrik \u00fcretim y\u00f6netmeli\u011fiyle<\/strong> birlikte kendi elektri\u011fini <strong>g\u00fcne\u015f enerjisi ile \u00fcretmek<\/strong> isteyen i\u015fletmelerin say\u0131s\u0131n\u0131n h\u0131zla artt\u0131\u011f\u0131na de\u011finen Asunim Kurucu Orta\u011f\u0131 <strong>Umut G\u00fcrb\u00fcz;<\/strong><\/p>\n<p><em>\u201c<strong>Fotovoltaik g\u00fcne\u015f enerjisi<\/strong>, g\u00fcne\u015flenmenin k\u0131smen daha s\u0131n\u0131rl\u0131 oldu\u011fu Ankara ilimizde de son derece <strong>feasible<\/strong> hale geldi, bunu <strong>Ba\u015fkent OSB<\/strong>\u2019nin en b\u00fcy\u00fck<strong> \u00e7at\u0131 \u00fczeri GES<\/strong>\u2019ini kurarak tecr\u00fcbe etmi\u015f olduk. Ankara\u2019da yer alan sanayicilerimize \u00e7a\u011fr\u0131m\u0131z, g\u00fcne\u015f enerjisi santrali kurma karar\u0131 almadan mutlaka bizlere ula\u015fs\u0131nlar, kendilerine Avrupa m\u00fchendisli\u011fi ile tasarlanm\u0131\u015f, en \u00fcst\u00fcn ve kaliteli ekipmanlar ile<strong> 25 sene<\/strong> sorunsuz \u00e7al\u0131\u015facak, <strong>performans garantili<\/strong> ve<strong> ar\u0131zalara<\/strong> an\u0131nda <strong>m\u00fcdahale edilen sistemleri<\/strong> en uygun fiyatlar ile sunmak i\u00e7in bekliyoruz\u201d<\/em> dedi.<\/p>\n<p><span style=\"text-decoration: underline;\">Santralde;<\/span> Phono Solar g\u00fcne\u015f panelleri, Alman<strong> SMA<\/strong> marka inverterlar, \u0130svi\u00e7re <strong>Leoni Studer<\/strong> marka \u00f6zel beta \u0131\u015f\u0131n \u00e7apraz ba\u011fl\u0131 <strong>solar kablolar<\/strong> kullan\u0131ld\u0131. Santralin bak\u0131m onar\u0131m faaliyetleri ASUNIM\u2019in i\u015ftirak firmas\u0131 olan <strong>MAXIMA Enerji<\/strong> taraf\u0131ndan y\u00fcr\u00fct\u00fclecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7at\u0131 \u00fczeri g\u00fcne\u015f enerjisi sistemleri alan\u0131nda engin uluslararas\u0131 tecr\u00fcbeye sahip ve merkezi Ankara\u2019da bulunan ASUNIM T\u00fcrkiye, Ba\u015fkent Organize Sanayi B\u00f6lgesi\u2019nde bulunan An\u0131l Ambalaj [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":138731,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[93531,6743,75092,93530,93522,45519,93523,89466,58009,93528,93529,52259,53157,93526,93524,13708,93527,93525,51352],"views":220,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138729"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=138729"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138729\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/138731"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=138729"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=138729"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=138729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}