{"id":13846,"date":"2013-08-09T00:59:28","date_gmt":"2013-08-08T21:59:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13846"},"modified":"2013-08-09T00:59:28","modified_gmt":"2013-08-08T21:59:28","slug":"sinopta-nukleer-santral-yapiminda-10-bin-kisi-calisacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sinopta-nukleer-santral-yapiminda-10-bin-kisi-calisacak\/","title":{"rendered":"(Turkish) Sinop\u2019ta N\u00fckleer Santral Yap\u0131m\u0131nda 10 Bin Ki\u015fi \u00c7al\u0131\u015facak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13846\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Sinop\u2019ta kurulmas\u0131 planlanan N\u00fckleer Santral\u2019in in\u015faas\u0131 s\u00fcresince 10 bin ki\u015fi \u00e7al\u0131\u015facak, in\u015faat\u0131n tamamlanmas\u0131n\u0131n ard\u0131ndan 480\u2032i M\u00fchendis olmak \u00fczere 2 bin ki\u015fi kal\u0131c\u0131 istihdam edilecek.<\/strong><\/p>\n<p>Sinop Milletvekili Mehmet Ersoy, yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, Sinop \u0130nce Burun mevkisinde kurulmas\u0131 planlanan santralin \u0130nceleme, et\u00fcd ile projelendirmesinin yakla\u015f\u0131k 3 y\u0131l s\u00fcrece\u011fini ve kurulaca\u011f\u0131 zeminin \u00e7ok uzun vadeli tetkiklerden <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sinop-nukleer-santrali-ihalesi-turkiye-nukleer-enerji-ataginda-peki-sinop-ile-mersinin-farki-ne.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-10488\" title=\"sinopta-nukleer-santral-yapiminda-10-bin-kisi-calisacak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sinop-nukleer-santrali-ihalesi-turkiye-nukleer-enerji-ataginda-peki-sinop-ile-mersinin-farki-ne-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sinop-nukleer-santrali-ihalesi-turkiye-nukleer-enerji-ataginda-peki-sinop-ile-mersinin-farki-ne-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sinop-nukleer-santrali-ihalesi-turkiye-nukleer-enerji-ataginda-peki-sinop-ile-mersinin-farki-ne-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sinop-nukleer-santrali-ihalesi-turkiye-nukleer-enerji-ataginda-peki-sinop-ile-mersinin-farki-ne-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/sinop-nukleer-santrali-ihalesi-turkiye-nukleer-enerji-ataginda-peki-sinop-ile-mersinin-farki-ne.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ge\u00e7irilece\u011fini belirtti.<\/p>\n<p>Projenin tamamlanmas\u0131n\u0131n ard\u0131ndan 3 y\u0131l sonra in\u015faat s\u00fcreci \u00e7al\u0131\u015fmalar\u0131na ba\u015flanaca\u011f\u0131n\u0131 ifade eden Ersoy, s\u00f6zlerini \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc:\u201d\u0130n\u015faat s\u00fcrecinin yakla\u015f\u0131k 7 y\u0131l s\u00fcrmesi bekleniyor. Yani 10 y\u0131l sonra bu santral elektrik \u00fcretir hale gelecek. Bu s\u00fcre\u00e7te yakla\u015f\u0131k 10 bin ki\u015fi \u00e7al\u0131\u015facak. \u0130n\u015faat bittikten sonra 480\u2032i M\u00fchendis olmak \u00fczere 2 bin ki\u015fi kal\u0131c\u0131 istihdam ediliyor olacak. Ayr\u0131ca bu alan i\u00e7erisinde bir ara\u015ft\u0131rma merkezi kurulacak. Burada bilimsel ara\u015ft\u0131rmalar ulusal ve uluslararas\u0131 \u00f6l\u00e7\u00fcde e\u011fitim ve ara\u015ft\u0131rma faaliyetleri yap\u0131lacak.\u201d<\/p>\n<p>Ersoy, \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131 taraf\u0131ndan, Gerze\u2019de kurulmas\u0131 planlanan termik santralle ilgili \u00c7ED raporuna olumsuz bir cevap verilerek donduruldu\u011funu an\u0131msatarak, \u201cO d\u00f6nemde AK Parti\u2019yi, h\u00fck\u00fcmetimizi ele\u015ftiri ya\u011fmuruna tutanlardan \u015fimdi bir \u00f6zr\u00fc hakketti\u011fimizi ifade etmek istiyorum. Termik santrale kar\u015f\u0131 olmak, yakmak y\u0131kmak de\u011fil, sonu\u00e7ta bir vatanda\u015f yat\u0131r\u0131m yapmak istiyor, \u00c7ED\u2019e ba\u015fvurmak istiyor, bu yerin sa\u011flam olup olmad\u0131\u011f\u0131n\u0131 bilmek gerekiyor\u201d diye konu\u015ftu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/08\/08\/sinopta-nukleer-santral-yapiminda-10-bin-kisi-calisacak\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Sinop\u2019ta kurulmas\u0131 planlanan N\u00fckleer Santral\u2019in in\u015faas\u0131 s\u00fcresince 10 bin ki\u015fi \u00e7al\u0131\u015facak, in\u015faat\u0131n tamamlanmas\u0131n\u0131n ard\u0131ndan 480\u2032i M\u00fchendis olmak \u00fczere 2 bin ki\u015fi kal\u0131c\u0131 istihdam [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10488,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[7477,63,67,165,7476,21,88,4757,1595],"views":984,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13846"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13846"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13846\/revisions"}],"predecessor-version":[{"id":13847,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13846\/revisions\/13847"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10488"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13846"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13846"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13846"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}