{"id":138382,"date":"2021-07-12T12:04:19","date_gmt":"2021-07-12T09:04:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=138382"},"modified":"2021-07-12T12:04:51","modified_gmt":"2021-07-12T09:04:51","slug":"firat-edas-in-ozgur-kuslar-projesiyle-gocmen-kuslar-guvende","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/firat-edas-in-ozgur-kuslar-projesiyle-gocmen-kuslar-guvende\/","title":{"rendered":"(Turkish) F\u0131rat Eda\u015f\u2019\u0131n &#8216;\u00d6zg\u00fcr Ku\u015flar&#8217; Projesiyle G\u00f6\u00e7men Ku\u015flar G\u00fcvende"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/138382\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>F\u0131rat Elektrik Da\u011f\u0131t\u0131m A.\u015e., \u2018\u00d6zg\u00fcr Ku\u015flar\u2019 sosyal sorumluluk projesi kapsam\u0131nda, enerji nakil hatlar\u0131ndaki izolasyon \u00e7al\u0131\u015fmalar\u0131 bu y\u0131l da t\u00fcm h\u0131z\u0131yla devam ediyor.<\/strong><\/p>\n<p><strong>Kaliteli<\/strong> ve <strong>kesintisiz enerji arz\u0131<\/strong> parolas\u0131yla, sorumluluk b\u00f6lgesi<strong> Bing\u00f6l, Elaz\u0131\u011f, Malatya<\/strong> ve <img loading=\"lazy\" class=\"alignright wp-image-138384\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/firat-edas-in-ozgur-kuslar-projesiyle-gocmen-kuslar-guvende-2.jpg\" alt=\"\" width=\"320\" height=\"278\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/firat-edas-in-ozgur-kuslar-projesiyle-gocmen-kuslar-guvende-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/firat-edas-in-ozgur-kuslar-projesiyle-gocmen-kuslar-guvende-2-300x260.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/firat-edas-in-ozgur-kuslar-projesiyle-gocmen-kuslar-guvende-2-461x400.jpg 461w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/firat-edas-in-ozgur-kuslar-projesiyle-gocmen-kuslar-guvende-2-58x50.jpg 58w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/firat-edas-in-ozgur-kuslar-projesiyle-gocmen-kuslar-guvende-2-500x434.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>Tunceli<\/strong> illerinde faaliyetlerini aral\u0131ks\u0131z s\u00fcrd\u00fcren <strong>F\u0131rat EDA\u015e<\/strong>, ger\u00e7ekle\u015ftirdi\u011fi <strong>s\u00fcrd\u00fcr\u00fclebilir sosyal sorumluluk projeleri<\/strong>yle, hizmet b\u00f6lgesine de\u011fer katmay\u0131 s\u00fcrd\u00fcr\u00fcyor.<\/p>\n<p>G\u00f6\u00e7men ku\u015flar\u0131n \u00f6nemli yol g\u00fczergah\u0131na sahip hizmet b\u00f6lgesinde, enerji hatlar\u0131nda meydana gelen \u00e7arpmalara ba\u011fl\u0131 <strong>ku\u015f \u00f6l\u00fcmlerin<\/strong> \u00f6n\u00fcne ge\u00e7ilmesi hedefiyle ger\u00e7ekle\u015ftirdi\u011fi yat\u0131r\u0131mlar\u0131na y\u00f6nelik \u00e7al\u0131\u015fmalar y\u00fcr\u00fcten <strong>F\u0131rat EDA\u015e<\/strong>, 2021 y\u0131l\u0131 itibar\u0131yla ba\u015flad\u0131\u011f\u0131 havai \u015febekelerinde <strong>2.118 direkte izolasyon \u00e7al\u0131\u015fmas\u0131n\u0131<\/strong> tamamlad\u0131.<\/p>\n<h2><strong>\u00d6MER KANDEM\u0130R: \u201cPROJE \u0130LE ENERJ\u0130 HATLARINDA \u00c7ARPILMADAN KAYNAKLI KU\u015e \u00d6L\u00dcMLER\u0130 HER YIL AZALIYOR\u201d<\/strong><\/h2>\n<p><strong>Enerji hatlar\u0131nda \u00e7arp\u0131lmadan<\/strong> kaynakl\u0131 ku\u015f \u00f6l\u00fcmlerinde projenin ger\u00e7ekle\u015ftirildi\u011fi ilk y\u0131ldan itibaren yap\u0131lan \u00e7al\u0131\u015fmalar sayesinde<strong> sorumluluk b\u00f6lgesinde<\/strong> yakla\u015f\u0131k <strong>% 75<\/strong> oran\u0131nda azalman\u0131n ya\u015fand\u0131\u011f\u0131na dikkat \u00e7eken <em>F\u0131rat EDA\u015e Da\u011f\u0131t\u0131m Operasyonlar\u0131 Genel M\u00fcd\u00fcr\u00fc<\/em> <strong>\u00d6mer Kandemir<\/strong>, <em>\u201c\u0130klimi ve do\u011fas\u0131n\u0131n yan\u0131 s\u0131ra barajlar\u0131, g\u00f6lleri ve nehirleri ile b\u00f6lgemiz, <strong>g\u00f6\u00e7men ku\u015flar\u0131n\u0131n<\/strong> adeta \u00f6nemli duraklar\u0131 aras\u0131ndad\u0131r. Ku\u015flar\u0131n \u00f6nemli ya\u015famsal alan\u0131 haline gelen bu g\u00fczergahta, onlar\u0131n g\u00f6ky\u00fcz\u00fcnde \u00f6zg\u00fcrce u\u00e7malar\u0131n\u0131 sa\u011flamak, faaliyet alan\u0131m\u0131zdaki sorumluluklar\u0131m\u0131z\u0131n ba\u015f\u0131nda geliyor. \u2018\u00d6zg\u00fcr Ku\u015flar\u2019 diyerek yola \u00e7\u0131kt\u0131\u011f\u0131m\u0131z ve s\u00fcrd\u00fcr\u00fclebilirlik \u00e7er\u00e7evesinde ele ald\u0131\u011f\u0131m\u0131z projemiz kapsam\u0131nda, 2021 y\u0131l\u0131n\u0131n ilk<strong> 6 ay\u0131<\/strong>nda <strong>1.478 direkte<\/strong>, <strong>iletken izolasyonu \u00e7al\u0131\u015fmalar\u0131<\/strong> tamamlan\u0131rken; 640 direkte de koruyucu aparatlarla ku\u015flar\u0131n \u00f6zg\u00fcrce u\u00e7malar\u0131 i\u00e7in gerekli \u00f6nlemler al\u0131nd\u0131. Y\u0131l sonuna kadar devam edecek \u00e7al\u0131\u015fmalar ile bu say\u0131n\u0131n daha da art\u0131r\u0131lmas\u0131 hedeflenmektedir\u201d<\/em> dedi.<\/p>\n<h2><strong>KANDEM\u0130R: \u201c\u00d6NCEL\u0130\u011e\u0130M\u0130Z DO\u011eAL YA\u015eAMA VE \u00c7EVREYE SAYGI\u201d<\/strong><\/h2>\n<p><strong>G\u00f6\u00e7men ku\u015flar\u0131n yuvalar\u0131nda<\/strong> da koruyucu \u00f6nlemler alarak, yavru ku\u015flar\u0131n da g\u00fcvenli\u011fini \u00f6zenle sa\u011flad\u0131klar\u0131n\u0131 belirten \u00d6mer Kandemir,<em> \u201cEkiplerimizin ger\u00e7ekle\u015ftirdikleri tarama faaliyetleriyle belirlenen g\u00f6\u00e7men ku\u015flar\u0131n yuva yapt\u0131\u011f\u0131 direklerde, enerji tamamen kesilerek, al\u0131nan koruyucu \u00f6nlemler ile ku\u015flar\u0131n g\u00fcvenli bir ortamda ya\u015famlar\u0131n\u0131 s\u00fcrd\u00fcrmeleri sa\u011flan\u0131yor\u201d<\/em> dedi. Kandemir, \u201c<strong>F\u0131rat EDA\u015e<\/strong> olarak, her zaman m\u00fc\u015fterilerimize kaliteli ve kesintisiz <strong>elektrik da\u011f\u0131t\u0131m hizmeti<\/strong> sunman\u0131n yan\u0131 s\u0131ra, bir di\u011fer \u00f6nceli\u011fimiz de <strong>do\u011fal ya\u015fama<\/strong> ve <strong>\u00e7evreye sayg\u0131<\/strong> olmu\u015ftur. Bu ba\u011flamda, <strong>\u00d6zg\u00fcr Ku\u015flar projemizde<\/strong> oldu\u011fu gibi b\u00f6lgemize ve <strong>\u00fclkemize de\u011fer katacak, s\u00fcrd\u00fcr\u00fclebilir sosyal sorumluluk projelerimizi<\/strong> hayata ge\u00e7irmeye devam edece\u011fiz\u201d ifadesiyle <strong>s\u00fcrd\u00fcr\u00fclebilirli\u011fe<\/strong> ve <strong>toplumsal faydaya<\/strong> dikkat \u00e7ekti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.F\u0131rat Elektrik Da\u011f\u0131t\u0131m A.\u015e., \u2018\u00d6zg\u00fcr Ku\u015flar\u2019 sosyal sorumluluk projesi kapsam\u0131nda, enerji nakil hatlar\u0131ndaki izolasyon \u00e7al\u0131\u015fmalar\u0131 bu y\u0131l da t\u00fcm h\u0131z\u0131yla devam ediyor. Kaliteli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":138385,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[53114,52259,88162,93277,1884,47488],"views":101,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138382"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=138382"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138382\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/138385"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=138382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=138382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=138382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}