{"id":138376,"date":"2021-07-12T11:45:15","date_gmt":"2021-07-12T08:45:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=138376"},"modified":"2021-07-12T11:51:55","modified_gmt":"2021-07-12T08:51:55","slug":"mentas-hes-gunes-enerjisi-ile-birlikte-hibrit-santrale-donusuyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mentas-hes-gunes-enerjisi-ile-birlikte-hibrit-santrale-donusuyor\/","title":{"rendered":"(Turkish) &#8217;Menta\u015f HES&#8217; G\u00fcne\u015f Enerjisi Yat\u0131r\u0131m\u0131yla Hibrit Santrale D\u00f6n\u00fc\u015f\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/138376\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aydem Yenilenebilir Enerji taraf\u0131ndan Adana\u2019daki Menta\u015f Hidroelektrik Santrali\u2019ne (HES) 39 MW kurulu g\u00fc\u00e7te G\u00fcne\u015f Santrali (GES) kurularak hibrit santrale d\u00f6n\u00fc\u015fecek.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-138378\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/mentas-hes-gunes-enerjisi-ile-birlikte-hibrit-santrale-donusecek.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/mentas-hes-gunes-enerjisi-ile-birlikte-hibrit-santrale-donusecek.jpg 512w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/mentas-hes-gunes-enerjisi-ile-birlikte-hibrit-santrale-donusecek-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/mentas-hes-gunes-enerjisi-ile-birlikte-hibrit-santrale-donusecek-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/mentas-hes-gunes-enerjisi-ile-birlikte-hibrit-santrale-donusecek-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Adana&#8217;n\u0131n Alada\u011f ve \u0130mamo\u011flu il\u00e7elerinde <strong>39,38 MW<\/strong> kurulu g\u00fcc\u00fcnde <strong>Menta\u015f Hidroelektrik Santrali (HES)<\/strong> Yard\u0131mc\u0131 Kaynak <strong>G\u00fcne\u015f Enerji Santrali (GES) Projesi<\/strong> planlan\u0131yor. <em>Proje bedeli, ekipman maliyetleri, arazi haz\u0131rl\u0131k maliyetleri, m\u00fchendislik hizmetleri maliyetleri<\/em> ve <em>al\u0131nacak yasal izinlere<\/em> ait maliyetler dikkate al\u0131nd\u0131\u011f\u0131nda <strong>148 milyon TL<\/strong> civar\u0131nda hesaplan\u0131yor.<\/p>\n<p><strong>4 \u00fcniteden<\/strong> meydana gelen <strong>Menta\u015f HES<\/strong> <strong>49,60 MW<\/strong> g\u00fcc\u00fc ile y\u0131ll\u0131k <strong>178.725.000,00 kWh<\/strong> elektrik \u00fcretecek olup yard\u0131mc\u0131 kaynak <strong>G\u00fcne\u015f Enerji Santrali<\/strong> ile de <strong>78.750.000,00 kWh\/y\u0131l<\/strong> elektrik \u00fcretilebilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aydem Yenilenebilir Enerji taraf\u0131ndan Adana\u2019daki Menta\u015f Hidroelektrik Santrali\u2019ne (HES) 39 MW kurulu g\u00fc\u00e7te G\u00fcne\u015f Santrali (GES) kurularak hibrit santrale d\u00f6n\u00fc\u015fecek. Adana&#8217;n\u0131n Alada\u011f ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":138378,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,47],"tags":[67505,52259,53157,26043,26044,93275,93276],"views":661,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138376"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=138376"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138376\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/138378"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=138376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=138376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=138376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}