{"id":138262,"date":"2021-07-09T10:58:48","date_gmt":"2021-07-09T07:58:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=138262"},"modified":"2021-07-09T10:58:48","modified_gmt":"2021-07-09T07:58:48","slug":"topcam-hidroelektrik-santrali-hes-ozellestiriliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/topcam-hidroelektrik-santrali-hes-ozellestiriliyor\/","title":{"rendered":"(Turkish) &#8217;Top\u00e7am Hidroelektrik Santrali (HES)&#8217; \u00d6zelle\u015ftiriliyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/138262\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Hazine ve Maliye Bakanl\u0131\u011f\u0131 \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 taraf\u0131ndan Ordu&#8217;nun Mesudiye il\u00e7esinde yer alan Elektrik \u00dcretim A\u015e\u2019ye (E\u00dcA\u015e) ait, 61,35MWe i\u015fletme<img loading=\"lazy\" class=\"alignright wp-image-138264\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/topcam-hidroelektrik-santrali-hes-ozellestiriliyor.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/topcam-hidroelektrik-santrali-hes-ozellestiriliyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/topcam-hidroelektrik-santrali-hes-ozellestiriliyor-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/topcam-hidroelektrik-santrali-hes-ozellestiriliyor-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/topcam-hidroelektrik-santrali-hes-ozellestiriliyor-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/topcam-hidroelektrik-santrali-hes-ozellestiriliyor-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/> kapasitesine sahip olan\u00a0Top\u00e7am Hidroelektrik Santrali ile santrale ait yer alan ta\u015f\u0131nmazlar\u0131n,\u00a0i\u015fletme hakk\u0131n\u0131n verilmesi suretiyle\u00a0\u00f6zelle\u015ftirmesi i\u00e7in ihalesi ger\u00e7ekle\u015ftirilecek.<\/strong><\/p>\n<p>\u0130haleye yaln\u0131zca<strong> t\u00fczel ki\u015filer<\/strong> ile <strong>ortak giri\u015fim gruplar\u0131<\/strong> kat\u0131labilecek. \u0130haleye kat\u0131lmak isteyenlerin\u00a0<strong>15.000.000 TL<\/strong> tutar\u0131nda <strong>ge\u00e7ici teminat<\/strong> yat\u0131rmas\u0131 gerekiyor.<\/p>\n<p><strong>\u0130hale \u015fartnamesi<\/strong> ve <strong>tan\u0131t\u0131m dok\u00fcman\u0131, bankaya yat\u0131r\u0131lmas\u0131<\/strong> gereken <strong>20.000 TL<\/strong> kar\u015f\u0131l\u0131\u011f\u0131nda, <strong>T\u00fcrkiye Cumhuriyeti Hazine ve Maliye Bakanl\u0131\u011f\u0131 \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131<\/strong>\u2019ndan al\u0131nabilecek olup\u00a0Teklifler ise en ge\u00e7 <strong>23\u00a0Eyl\u00fcl 2021\u00a0<\/strong>saat<strong> 17.00\u2019ye<\/strong> kadar elden teslim edilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hazine ve Maliye Bakanl\u0131\u011f\u0131 \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 taraf\u0131ndan Ordu&#8217;nun Mesudiye il\u00e7esinde yer alan Elektrik \u00dcretim A\u015e\u2019ye (E\u00dcA\u015e) ait, 61,35MWe i\u015fletme kapasitesine sahip olan\u00a0Top\u00e7am [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":138264,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[34926,70,93203,1248,93204,13930,93202,93205],"views":431,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138262"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=138262"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138262\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/138264"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=138262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=138262"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=138262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}