{"id":138220,"date":"2021-07-09T08:53:45","date_gmt":"2021-07-09T05:53:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=138220"},"modified":"2021-07-09T08:57:39","modified_gmt":"2021-07-09T05:57:39","slug":"sivas-il-ozel-idaresi-17-mw-kurulu-guce-sahip-gunes-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sivas-il-ozel-idaresi-17-mw-kurulu-guce-sahip-gunes-santrali-kuracak\/","title":{"rendered":"Sivas SPA to Build Solar Power Plant with an Installed Power of 1.7 MW"},"content":{"rendered":"<p><strong>A Solar Power Plant (GES) with a capacity of 1.7 MW will be established and operated by <img loading=\"lazy\" class=\"alignright wp-image-138222\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/sivas-il-ozel-idaresi-17-mw-kurulu-guce-sahip-gunes-santrali-kuracak.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/sivas-il-ozel-idaresi-17-mw-kurulu-guce-sahip-gunes-santrali-kuracak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/sivas-il-ozel-idaresi-17-mw-kurulu-guce-sahip-gunes-santrali-kuracak-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/sivas-il-ozel-idaresi-17-mw-kurulu-guce-sahip-gunes-santrali-kuracak-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/sivas-il-ozel-idaresi-17-mw-kurulu-guce-sahip-gunes-santrali-kuracak-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Sivas Special Provincial Administration in the Center of Sivas.<\/strong><\/p>\n<p>While Sivas Special Provincial Administration is planning to &#8220;Increase the Solar Power Plant Capacity&#8221; in Sivas center, the investment cost of the project is estimated to be approximately 4.2 million TL.<\/p>\n<p>While it is planned to establish a company with the project, a solar power plant with a capacity of 825 kW will be built in addition to the solar power plant with a total capacity of 900 kW. Thus, the total capacity will be 1,725 MW, and the energy to be produced will be connected to the Sivas TM3 center.<\/p>","protected":false},"excerpt":{"rendered":"<p>A Solar Power Plant (GES) with a capacity of 1.7 MW will be established and operated by Sivas Special Provincial Administration in the Center of Sivas. While Sivas Special Provincial Administration is planning to &#8220;Increase the Solar Power Plant Capacity&#8221; in Sivas center, the investment cost of the project is estimated to be approximately 4.2 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":138222,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[66250,79148,52259,53157,93174,93173,93177,93175,51211,93176,93178,54979,24244],"views":299,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138220"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=138220"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138220\/revisions"}],"predecessor-version":[{"id":138225,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/138220\/revisions\/138225"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/138222"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=138220"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=138220"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=138220"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}