{"id":137924,"date":"2021-07-04T22:30:24","date_gmt":"2021-07-04T19:30:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=137924"},"modified":"2021-07-04T22:30:24","modified_gmt":"2021-07-04T19:30:24","slug":"bms-celik-hasir-fabrika-catisina-gunes-enerji-santrali-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bms-celik-hasir-fabrika-catisina-gunes-enerji-santrali-kuracak\/","title":{"rendered":"(Turkish) &#8217;BMS \u00c7elik Has\u0131r&#8217; Fabrika \u00c7at\u0131s\u0131na G\u00fcne\u015f Enerji Santrali Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/137924\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><img loading=\"lazy\" class=\"alignright wp-image-137926\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/bms-celik-hasir-fabrika-catisina-gunes-enerji-santrali-kuracak.jpg\" alt=\"\" width=\"300\" height=\"230\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/bms-celik-hasir-fabrika-catisina-gunes-enerji-santrali-kuracak.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/bms-celik-hasir-fabrika-catisina-gunes-enerji-santrali-kuracak-300x230.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/bms-celik-hasir-fabrika-catisina-gunes-enerji-santrali-kuracak-65x50.jpg 65w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/07\/bms-celik-hasir-fabrika-catisina-gunes-enerji-santrali-kuracak-260x200.jpg 260w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>BMS \u00c7elik Has\u0131r Sanayi ve Ticaret A.\u015e, fabrikas\u0131n\u0131n \u00e7at\u0131s\u0131na g\u00fcne\u015f enerji santrali kurma karar\u0131 ald\u0131.<\/strong><\/p>\n<p><strong>Kamuyu Ayd\u0131nlatma Platformu&#8217;na (KAP)<\/strong> yap\u0131lan a\u00e7\u0131klamada:<\/p>\n<p><em>&#8221;Manisa fabrikam\u0131z\u0131n ihtiyac\u0131 olan elektrik enerjisinin b\u00fcy\u00fck bir k\u0131sm\u0131n\u0131 kar\u015f\u0131lamak ve imalat girdi maliyetlerimizde \u00f6nemli bir tutar te\u015fkil eden <strong>elektrik birim maliyetimizi d\u00fc\u015f\u00fcrmek<\/strong> ve faaliyet karl\u0131l\u0131\u011f\u0131m\u0131z\u0131 art\u0131rmak amac\u0131yla, Manisa Organize Sanayi B\u00f6lgesi&#8217;nde kurulu fabrikam\u0131z \u00e7at\u0131s\u0131 \u00fczerine <strong>657 kWP (879.540 Kw)<\/strong> g\u00fcc\u00fcnde <strong>g\u00fcne\u015f enerji santrali<\/strong> (GES)\u00a0<strong>hizmet al\u0131m\u0131<\/strong> i\u00e7in fiyat teklifleri toplanmaktad\u0131r. S\u00f6z konusu al\u0131m, <strong>yat\u0131r\u0131m te\u015fvik belgesi<\/strong> kapsam\u0131nda <strong>KDV istisnas\u0131<\/strong> te\u015fvi\u011fi ile yap\u0131lacakt\u0131r.&#8221; bilgisi yer ald\u0131.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.BMS \u00c7elik Has\u0131r Sanayi ve Ticaret A.\u015e, fabrikas\u0131n\u0131n \u00e7at\u0131s\u0131na g\u00fcne\u015f enerji santrali kurma karar\u0131 ald\u0131. Kamuyu Ayd\u0131nlatma Platformu&#8217;na (KAP) yap\u0131lan a\u00e7\u0131klamada: &#8221;Manisa fabrikam\u0131z\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":137926,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[92961,52259,53157,73896],"views":268,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/137924"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=137924"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/137924\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/137926"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=137924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=137924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=137924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}