{"id":137589,"date":"2021-06-29T11:46:32","date_gmt":"2021-06-29T08:46:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=137589"},"modified":"2021-06-29T11:53:32","modified_gmt":"2021-06-29T08:53:32","slug":"gokceada-nin-enerjisi-kendine-yetecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gokceada-nin-enerjisi-kendine-yetecek\/","title":{"rendered":"G\u00f6k\u00e7eada&#8217;s Energy will be Self-Sufficient"},"content":{"rendered":"<p><strong>Uludag Electricity Distribution Inc. (UEDA\u015e) implemented the &#8220;G\u00f6k\u00e7eada Energetic Enough&#8221; project in G\u00f6k\u00e7eada to reduce carbon emissions and accelerate the transition to renewable energy within the scope of the European Union Horizon 2020 program. Within the scope of the project, which will set an example for the effective use of renewable resources, an energy storage facility will be established in G\u00f6k\u00e7eada by UEDA\u015e.<\/strong><\/p>\n<p>Renewable power plants and generators on the island will be integrated into the Virtual Power Plant (VPP) system to be established. Bozcaada Municipality, Troya Environment Association and Inavitas company are among the stakeholders of UEDA\u015e in the project, which includes a total of 19 partners from countries such as England, France, Italy, Spain, Germany, Denmark and the Netherlands.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-137591\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/gokceada-nin-enerjisi-kendine-yetecek-2.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/gokceada-nin-enerjisi-kendine-yetecek-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/gokceada-nin-enerjisi-kendine-yetecek-2-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/gokceada-nin-enerjisi-kendine-yetecek-2-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/gokceada-nin-enerjisi-kendine-yetecek-2-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Uludag Electricity Distribution Inc. (UEDA\u015e) implemented the G\u00f6k\u00e7eada Energetic Enough project in G\u00f6k\u00e7eada in order to reduce carbon emissions and accelerate the transition to renewable energy within the scope of the European Union Horizon 2020 program. The opening ceremony of the project was hosted by UEDA\u015e Deputy Chairman of the Board of Directors \u0130smail Erg\u00fcne\u015f, Mayor of G\u00f6k\u00e7eada \u00dcnal \u00c7etin, Mayor of Bozcaada Dr. Hakan Can Y\u0131lmaz was held with the participation of.<\/p>\n<p>Speaking at the opening ceremony, Erg\u00fcne\u015f said, \u201cWe are happy to implement a project that will set an example for the whole world in terms of the evaluation of renewable resources, together with our stakeholders. The main purpose of our EU-supported project is to reduce carbon emissions, facilitate the integration of renewable energy, and accelerate the transition to smart and green energy. We are establishing an energy storage facility in G\u00f6k\u00e7eada with the G\u00f6k\u00e7eada Enerjin Yeter project. Renewable power plants and generators that are currently operational on the island will be integrated into the Virtual Power Plant (VPP) system to be established. Thus, the energy of the islands will be tried to be provided from renewable energy. In addition, within the scope of the tests in the project, a smart meter application will be made to all consumers in a transformer zone. In this context, we will have the chance to follow the consumption habits of users.\u201d<\/p>\n<h2>The project will be completed in 42 months<\/h2>\n<p>Bozcaada Municipality, Troya Environment Association and Inavitas company are among the stakeholders of UEDA\u015e in the project, which includes a total of 19 partners from countries such as England, France, Italy, Spain, Germany, Denmark and the Netherlands. 70% of the 7.2 million Euro project will be donated by the European Union. The project, coordinated by the University of Marseille from France, is expected to be completed in 42 months.<\/p>\n<h2>It will set an example for other projects<\/h2>\n<p>Speaking about the project, UEDA\u015e General Manager G\u00f6kay Fatih Danac\u0131 said, \u201cWithin the scope of G\u00f6k\u00e7eada Energetic Enough Project, 2 mW of energy will be obtained. A total of 7 thousand 260 subscribers will benefit from the project. Studies similar to the system that will be tested in G\u00f6k\u00e7eada for 42 months will also be carried out on other islands in Turkey, as well as on the islands in Denmark, Italy and Spain. Larger projects and systems will be implemented in order to disseminate the model to be developed after these studies.\u201d<\/p>\n<p>After the opening, the signing ceremony was held with the participation of the stakeholders of the project, UEDA\u015e, Bozcaada Municipality, Troya Environment Association and Inavitas.<\/p>\n<h2>Highest budget research grant program<\/h2>\n<p>The Horizon2020 Grant Program, created by the European Union to support scientific and applied research, development and innovation projects, is positioned as the highest-budgeted research grant program in human history. It is carried out to strengthen the research and technology development capacity of Europe, to encourage university-industry cooperation, to develop cooperation in different fields related to EU policies with EU countries, EU candidate countries and countries with which the EU cooperates.<\/p>","protected":false},"excerpt":{"rendered":"<p>Uludag Electricity Distribution Inc. (UEDA\u015e) implemented the &#8220;G\u00f6k\u00e7eada Energetic Enough&#8221; project in G\u00f6k\u00e7eada to reduce carbon emissions and accelerate the transition to renewable energy within the scope of the European Union Horizon 2020 program. Within the scope of the project, which will set an example for the effective use of renewable resources, an energy storage [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":137593,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[92667,92658,92666,92657,92661,92670,66250,92663,92273,53114,52379,92671,89958,52259,92669,92674,92659,92673,92662,65438,3221,21047,92672,92681,92668,54979,73961,92675,76673,92676,92677,81210,92664,60021,92678,92660,92665,92680,92679,6532],"views":205,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/137589"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=137589"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/137589\/revisions"}],"predecessor-version":[{"id":137598,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/137589\/revisions\/137598"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/137593"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=137589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=137589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=137589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}