{"id":137241,"date":"2021-06-22T14:02:05","date_gmt":"2021-06-22T11:02:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=137241"},"modified":"2021-06-22T14:09:41","modified_gmt":"2021-06-22T11:09:41","slug":"turkiye-nin-kurulu-gucu-nun-7-154-mwlik-kismi-gunesten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-kurulu-gucu-nun-7-154-mwlik-kismi-gunesten\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;nin Kurulu G\u00fcc\u00fcn\u00fcn 7.154 MW\u2019l\u0131k K\u0131sm\u0131 G\u00fcne\u015f&#8217;ten!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/137241\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><b>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan May\u0131s 2021 Kurulu G\u00fc\u00e7 Raporu Yay\u0131nlan\u0131rken Raporda, toplam kurulu g\u00fc\u00e7<\/b><strong>\u00a097.689,5\u00a0<\/strong><b>MW olurken 2021 May\u0131s sonu kurulu<img loading=\"lazy\" class=\"alignright wp-image-137244\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/turkiye-nin-kurulu-gucu-nun-7-154-mwlik-kismi-gunesten.jpg\" alt=\"\" width=\"320\" height=\"221\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/turkiye-nin-kurulu-gucu-nun-7-154-mwlik-kismi-gunesten.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/turkiye-nin-kurulu-gucu-nun-7-154-mwlik-kismi-gunesten-300x207.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/turkiye-nin-kurulu-gucu-nun-7-154-mwlik-kismi-gunesten-500x345.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/turkiye-nin-kurulu-gucu-nun-7-154-mwlik-kismi-gunesten-72x50.jpg 72w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/> g\u00fcc\u00fcn 7.154 MW\u2019l\u0131k k\u0131sm\u0131 g\u00fcne\u015f enerjisi santrallerinden elde edildi. G\u00fcne\u015f enerjisindeki kurulu g\u00fc\u00e7 bir \u00f6nceki aya g\u00f6re 89 MW artt\u0131.<\/b><\/p>\n<p>Kurulu g\u00fc\u00e7teki en b\u00fcy\u00fck pay\u00a0<strong>25.719,6\u00a0MW<\/strong> ile do\u011fal gaz santrallerinin, sonras\u0131nda <strong>23.244,0\u00a0MW<\/strong> ile barajl\u0131 kaynaklar\u0131n oldu. <strong>Linyit tipi santrallerin<\/strong> kurulu g\u00fcc\u00fc\u00a0<strong>10.119,9\u00a0MW<\/strong>, r\u00fczgar santrallerinin\u00a0<strong>9.660,6\u00a0<\/strong>ithal k\u00f6m\u00fcr yak\u0131tl\u0131 santrallerin kurulu g\u00fcc\u00fc\u00a0<strong>8.986,9\u00a0MW<\/strong> olurken akarsu tipi hidroelektrik santrallerin kurulu g\u00fcc\u00fc\u00a0<strong>8.102,8\u00a0MW<\/strong>, jeotermalin <strong>1.647 MW<\/strong> ve biyok\u00fctlenin\u00a0<strong>1.202,5\u00a0MW<\/strong> oldu.<\/p>\n<p>May\u0131s&#8217;ta elektrik \u00fcretim kurulu g\u00fcc\u00fc bir \u00f6nceki aya g\u00f6re<strong> 313 MW<\/strong> art\u0131\u015f ile <strong>97.689,5 MW<\/strong> de\u011ferini g\u00f6rd\u00fc.<\/p>\n<p><b>TE\u0130A\u015e\u2019\u0131n May\u0131s 2021 Kurulu G\u00fc\u00e7 Raporuna Ula\u015fmak \u0130\u00e7in\u00a0<\/b><a href=\"https:\/\/www.solar.ist\/wp-content\/uploads\/2021\/06\/May%C4%B1s-2021-Kurulu-G%C3%BC%C3%A7-Raporu-2.pdf\" target=\"_blank\" rel=\"nofollow noopener\"><b>TIKLAYIN &gt;&gt;&gt;<\/b><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan May\u0131s 2021 Kurulu G\u00fc\u00e7 Raporu Yay\u0131nlan\u0131rken Raporda, toplam kurulu g\u00fc\u00e7\u00a097.689,5\u00a0MW olurken 2021 May\u0131s sonu kurulu g\u00fcc\u00fcn 7.154 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":137244,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,52259,23416,79122],"views":183,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/137241"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=137241"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/137241\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/137244"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=137241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=137241"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=137241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}