{"id":13708,"date":"2013-08-04T00:13:45","date_gmt":"2013-08-03T21:13:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13708"},"modified":"2013-08-04T00:13:45","modified_gmt":"2013-08-03T21:13:45","slug":"ruslar-akkuyunun-ced-raporu-icin-15-agustosa-kadar-sure-istedi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ruslar-akkuyunun-ced-raporu-icin-15-agustosa-kadar-sure-istedi\/","title":{"rendered":"(Turkish) Ruslar, Akkuyu\u2019nun \u00c7ED Raporu \u0130\u00e7in 15 A\u011fustos\u2019a Kadar S\u00fcre \u0130stedi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13708\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin Mersin, Akkuyu\u2019ya in\u015fa edece\u011fi 20 milyar dolarl\u0131k n\u00fckleer santralinde, \u015fimdi de rapor gecikmesi ya\u015fan\u0131yor. 4 bin 800 MW kurulu g\u00fc\u00e7le T\u00fcrkiye\u2019nin enerji ihtiyac\u0131n\u0131n y\u00fczde 6\u2019s\u0131n\u0131 kar\u015f\u0131layacak santralin ihalesini, Rus Devlet Atom Enerjisi Kurulu\u015fu ROSATOM kazanm\u0131\u015ft\u0131. ROSATOM\u2019un T\u00fcrkiye\u2019de kurdu\u011fu Akkuyu NGS \u015firketi \u00fczerinden yapaca\u011f\u0131 santral i\u00e7in en kritik ad\u0131m olarak kabul edilen, \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) raporunu, 9 Temmuz\u2019da \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na sundu. Ancak bakanl\u0131k, 3 bin sayfal\u0131k raporu 6 g\u00fcn sonra \u015firkete iade etti. Bakanl\u0131k raporun tespit edilen eksiklikler y\u00fcz\u00fcnden kabul edilmedi\u011fini a\u00e7\u0131klarken, Akkuyu NGS \u015fimdi raporu revize ederek yeniden ba\u015fvuracak.<\/strong><\/p>\n<h2>\u2018Reakt\u00f6rler dayanamaz\u2019<\/h2>\n<p>Bu nedenle de in\u015faat planlanandan geci<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz.png\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9539\" title=\"ruslar-akkuyunun-ced-raporu-icin-15-agustosa-kadar-sure-istedi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-300x185.png\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-300x185.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz-80x50.png 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-istemese-de-nukleer-e-ced-aliriz.png 481w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>kmeli ba\u015flama ihtimali g\u00fcndeme geldi. Worldtribune.com haber sitesi ise T\u00fcrkiye\u2019nin raporu deprem riski y\u00fcz\u00fcnden iade etti\u011fini \u00f6ne s\u00fcrd\u00fc. T\u00fcrk yetkililere dayand\u0131r\u0131lan habere g\u00f6re, Akkuyu santrali i\u00e7in haz\u0131rlanan \u00c7ED raporunu inceleyen T\u00fcrk yetkililerde, reakt\u00f6rlerin depreme dayanamayaca\u011f\u0131 endi\u015fesi olu\u015ftu. Ba\u015fbakan Recep Tayyip Erdo\u011fan da bu durumdan rahats\u0131z oldu. Haber sitesini isim vermeden konu\u015fan bakanl\u0131k yetkilisi, \u201c\u0130nceledi\u011fimiz raporda bir s\u00fcr\u00fc soru i\u015fareti var. Ruslara 3 ay s\u00fcre verildi. Bu durum projeyi geciktirebilir\u201d dedi. ROSATOM\u2019un, raporun yeni halini 15 A\u011fustos\u2019ta tamamlayaca\u011f\u0131n\u0131 belirten Rus bas\u0131n\u0131, 2019 y\u0131l\u0131nda tamamlanmas\u0131 planlanan Akkuyu N\u00fckleer santralinin, hedeflenen zamanda tamamlanaca\u011f\u0131n\u0131, \u00c7ED raporundaki gecikmenin projeyi geciktirmeyece\u011fini a\u00e7\u0131klad\u0131. Akkuyu NGS, raporu revize edip 15 A\u011fustos\u2019a kadar g\u00f6nderecek. Olumlu g\u00f6r\u00fc\u015f \u00e7\u0131karsa Akkuyu\u2019da in\u015faata ba\u015flanacak.<\/p>\n<h2>Bakanl\u0131k: Deprem de\u011fil teknik sorun<\/h2>\n<p>\u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131, Akkuyu i\u00e7in haz\u0131rlanan \u00c7ED raporunun deprem de\u011fil teknik sorunlar y\u00fcz\u00fcnden kabul edilmedi\u011fini a\u00e7\u0131klad\u0131. Bakanl\u0131k yetkilileri Vatan\u2019a yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, Rus firmas\u0131na 15 Temmuz tarihinde, eksiklikler listesinin iletildi\u011fini ve 15 Ekim\u2019e kadar \u015fartnamedeki baz\u0131 teknik konulara ili\u015fkin gerekli detayland\u0131rman\u0131n yap\u0131lmas\u0131 istendi\u011fini kaydetti. Ayr\u0131nt\u0131land\u0131r\u0131lmas\u0131 istenen konulardan biri yap\u0131lacak liman\u0131n yeri ve teknik donan\u0131m\u0131. Bir ba\u015fka konu, limana gelecek gemilerin g\u00fczergah bilgileri. \u00dc\u00e7\u00fcnc\u00fc ba\u015fl\u0131k da santral kamp\u00fcs\u00fcne in\u015fa edilecek konutlar\u0131n teknik \u00f6zellik ve kapasiteleri ile burada ya\u015fayacak insan say\u0131s\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/08\/02\/ruslar-akkuyunun-ced-raporu-icin-15-agustosa-kadar-sure-istedi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin Mersin, Akkuyu\u2019ya in\u015fa edece\u011fi 20 milyar dolarl\u0131k n\u00fckleer santralinde, \u015fimdi de rapor gecikmesi ya\u015fan\u0131yor. 4 bin 800 MW kurulu g\u00fc\u00e7le T\u00fcrkiye\u2019nin enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9539,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[1466,3019,5465,4275,63,67,165,1301,21,88,7365,846],"views":478,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13708"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13708"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13708\/revisions"}],"predecessor-version":[{"id":13709,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13708\/revisions\/13709"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9539"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13708"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13708"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13708"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}