{"id":136938,"date":"2021-06-17T12:56:45","date_gmt":"2021-06-17T09:56:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=136938"},"modified":"2021-06-17T12:56:45","modified_gmt":"2021-06-17T09:56:45","slug":"39-mw-kapasiteli-damla-hes-artvin-yusufelinde-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/39-mw-kapasiteli-damla-hes-artvin-yusufelinde-kurulacak\/","title":{"rendered":"(Turkish) 39 MW Kapasiteli &#8216;Damla HES&#8217; Artvin Yusufeli&#8217;nde Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/136938\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Erar\u0131 Elektromekanik Enerji taraf\u0131ndan Artvin Yusufeli&#8217;nde 39,44 MW g\u00fcce sahip<\/strong><strong>\u00a0Damla <img loading=\"lazy\" class=\"alignright wp-image-136940\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/39-mw-kapasiteli-damla-hes-artvin-yusufelinde-kurulacak.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/39-mw-kapasiteli-damla-hes-artvin-yusufelinde-kurulacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/39-mw-kapasiteli-damla-hes-artvin-yusufelinde-kurulacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/39-mw-kapasiteli-damla-hes-artvin-yusufelinde-kurulacak-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/39-mw-kapasiteli-damla-hes-artvin-yusufelinde-kurulacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/39-mw-kapasiteli-damla-hes-artvin-yusufelinde-kurulacak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali (HES) kurulacak.<\/strong><\/p>\n<p><strong>Hevek, Soranpiyat Dereler<\/strong>i ile<strong> Zamevan \u00c7ay\u0131<\/strong>&#8216;nda yer alacak <strong>39,44 MW<\/strong> kapasiteye sahip<strong> Damla Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali&#8217;nin (HES)<\/strong> kurulup i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>Yap\u0131lacak yat\u0131r\u0131m kapsam\u0131nda\u00a0<strong>34,342 MW<\/strong>&#8216;l\u0131k<strong> Damla-1 HES<\/strong> ve <strong>2 \u00fcniteli<\/strong> toplam da\u00a0<strong>5,098 MW<\/strong> kapasiteye sahip <strong>Damla-2 HES<\/strong> kurulacak olup y\u0131ll\u0131k ortalama olarak <strong>115,530 GWh\u00a0<\/strong>enerji elde edilmesi tahmin edilirken yakla\u015f\u0131k <strong>4.280 ki\u015finin<\/strong> y\u0131ll\u0131k elektrik t\u00fcketimine denk \u00fcretim yapacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Erar\u0131 Elektromekanik Enerji taraf\u0131ndan Artvin Yusufeli&#8217;nde 39,44 MW g\u00fcce sahip\u00a0Damla Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali (HES) kurulacak. Hevek, Soranpiyat Dereleri ile Zamevan \u00c7ay\u0131&#8216;nda yer [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":136940,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[92132,92130,92131,52259,92133,68968],"views":888,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136938"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=136938"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136938\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/136940"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=136938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=136938"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=136938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}