{"id":136917,"date":"2021-06-17T11:28:20","date_gmt":"2021-06-17T08:28:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=136917"},"modified":"2021-06-17T11:32:25","modified_gmt":"2021-06-17T08:32:25","slug":"vetrosgc-berestovskaya-ruzgar-santrali-icin-gerekli-izinleri-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/vetrosgc-berestovskaya-ruzgar-santrali-icin-gerekli-izinleri-aldi\/","title":{"rendered":"VetroSGC Obtains Necessary Permits for &#8216;Berestovskaya Wind Farm'"},"content":{"rendered":"<p><strong>The wind energy unit of the Russian State Atomic Energy Agency Rosatom, NovaWind A.\u015e. VetroSGC A.\u015e, a subsidiary of the company, received the necessary permission for the Berestovskaya Wind Power Plant. The total capacity of the power plant, which will be built in Petrovsky in Stavropol Krai, will be 60 MW.<\/strong><\/p>\n<p>The necessary permission for the construction was given by the <strong>Stavropol Krai Autonomous Institution<\/strong>, <img loading=\"lazy\" class=\"alignright wp-image-136919\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/vetrosgc-berestovskaya-ruzgar-santrali-icin-gerekli-izinleri-aldi.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/vetrosgc-berestovskaya-ruzgar-santrali-icin-gerekli-izinleri-aldi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/vetrosgc-berestovskaya-ruzgar-santrali-icin-gerekli-izinleri-aldi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/vetrosgc-berestovskaya-ruzgar-santrali-icin-gerekli-izinleri-aldi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/vetrosgc-berestovskaya-ruzgar-santrali-icin-gerekli-izinleri-aldi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/vetrosgc-berestovskaya-ruzgar-santrali-icin-gerekli-izinleri-aldi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>after the experts reviewed <strong>the design documents<\/strong> and <strong>came to a positive conclusion<\/strong>. Thus, the necessary step was taken to start the construction of the <strong>wind farm<\/strong>, which consists of<strong> 24<\/strong> wind turbines, each with a capacity of <strong>2.5 MW.<\/strong><\/p>\n<p>The positive result of the expert review confirmed that the construction facilities comply with the ground survey results and requirements set forth in <strong>all environmental, health, epidemiological<\/strong> and <strong>fire-related technical regulations, legislation, technical documentation<\/strong> and <strong>the City Development Code<\/strong> of the <strong>Russian Federation.<\/strong><\/p>\n<p><strong>Stavropol Krai<\/strong>, <strong>NovaWind A.S.<\/strong> It is a key region for the projects implemented by Currently, <strong>2<\/strong> large <strong>wind power plants<\/strong> (210 MW Kochubeyevskaya Wind Power Plant and 60 MW Karmalinovskaya Wind Power Plant) are being put into operation in this region, while the construction of <strong>wind power<\/strong> plants with a <strong>total capacity<\/strong> of approximately <strong>180 MW<\/strong> continues in the region.<\/p>","protected":false},"excerpt":{"rendered":"<p>The wind energy unit of the Russian State Atomic Energy Agency Rosatom, NovaWind A.\u015e. VetroSGC A.\u015e, a subsidiary of the company, received the necessary permission for the Berestovskaya Wind Power Plant. The total capacity of the power plant, which will be built in Petrovsky in Stavropol Krai, will be 60 MW. The necessary permission for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":136919,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[92097,92104,66250,79148,52259,77256,92099,53282,92102,92100,92098,92103,54979,92101,68094,92105],"views":395,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136917"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=136917"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136917\/revisions"}],"predecessor-version":[{"id":136922,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136917\/revisions\/136922"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/136919"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=136917"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=136917"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=136917"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}